Project Manager
Albayan Holding Group – Nahdat Al Emaar Contracting Co.
Total years of experience :17 years, 9 Months
Scheduled all contractors and materials deliveries.
Conducted routine quality audits to ensure that work was progressing per the specifications and
initiated corrective actions.
Prepared regular interval progress reports.
Provided safety kits to all construction personnel, which complied with safety protocols for the job site.
Determined the project schedule, which included the sequence of all construction activities.
Prepared and followed through on all required punch lists.
Digitally archived weekly progress and technical “Knowledge Base” photographs of all assigned
projects.
Worked with construction administration consultants to plan field observations on schedule.
Conducted all critical pre-installation conferences with general contractors, subcontractors,
consultants and manufacturer’s representatives.
Performed regular job site observations to provide direction for all general contractor personnel.
Conducted weekly production and operations contractor meetings, which facilitated stronger
communication and the ability to resolve critical issues.
Reviewed plans and specs during the schematic design of pre-construction.
Implemented systems to improve process efficiency and reduce the project duration.
Acting as a mediator between team members and with external stakeholders when conflicts arise.
Providing direction and support to project teams and individuals.
Tracking project costs.
Co-ordinating resources to deliver projects on time and to budget.
Mentoring members of the project team in their personal development.
Projects:
- Dammam Additional Grain Silos Capacity 140, 000 Ton, Cost 350 Million S.R, Saudi Arabia (2018)
Client: Saudi Grains Organization (SAGO), Supplier: Buhler AG.
- Al Ahsa grain silos capacity 60, 000 ton (Turnkey, 335 Million SR), Saudi Arabia (2016-2018)
Client: Saudi Grains Organization (SAGO), Supplier: Buhler AG
- Ship unloading machines 1200 ton / hr (42 Million SR), Jeddah Islamic port (2016)
Client: Saudi Grains Organization (SAGO), Supplier: Vigan
Supervision and management site executing work
Schedule the project in logical steps and budget time required to meet deadlines
Safety codes and other regulations
Direct and supervise staff and workers
Study job specifications to determine appropriate construction methods
Complaints and construction problems
Projects:
- Dismantle and Install of new rail ways on berth (38 Million SR), Jeddah Seaport (2015)
Client: Ports Authority, Supplier: Cantrex
- Upgrade of existing Grain silos, Capacity 100, 000 ton (70 Million SR), Jeddah, Saudi Arabia (2015).
Client: Saudi Grains Organization (SAGO), Supplier: Buhler AG
- Jeddah grain silos, Capacity 140, 000 ton (Turnkey, 360 Million SR), Saudi Arabia (2013-2014)
Client: Saudi Grains Organization (SAGO), Supplier: Buhler AG
Enhance progress of mechanical activites in construction site
Direct and supervise workers
Material Handling and arrangement
Progress reports to managers
Projects:
- Arab National Cement Plant, Capacity 5500 t/d (Turnkey, 1200 Million EP), Egypt (2013)
Client: Asec Cement Company, Supplier: FLSmidth Company
- Altameer Cement Plant, Capacity 5000 t/d (Turnkey, 950 Million EP), Egypt (2011-2012)
Client: Building Material and Industrial Company, Supplier: KHD & GABER and PIFFER
- ALTakamol Cement Plant, Capacity 4500 t/d (Turnkey, 1200 Million EP), Sudan (2009-2011)
Client: Asec cement company, Supplier: FLSmidth Company
- Sina Gray II Cement Plant, Capacity 4500 t/d (Turnkey, 850 Million EP), Egypt (2008)
Client: Sina Cement Company, Supplier: FLSmidth Company
Rehabilitation and installation of new equipment's in existing plants
As built of existing buildings and equipment's
Preparation of Auto Cad drawings and B.O.Q
Follow up of purchasing requests and contractors
Set up of equipment specification.
Planning and control construction
Responsible for documentation
Lead of teams as a project leader
Projects:
- Renovation & upgrade equipment’s of Formaldehyde & Glaze plants, Egypt (2006-2008)
Supplier: ALPINE & PULLMAN Italy.
Mechanical Power Engineering 5 Years