WALIULLAH MOHAMMAD, QC Supervisor - Instrumentation

WALIULLAH MOHAMMAD

QC Supervisor - Instrumentation

ADCO

Location
India - Bengaluru
Education
Bachelor's degree, Eletronic&communication
Experience
16 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 9 Months

QC Supervisor - Instrumentation at ADCO
  • United Arab Emirates
  • March 2012 to June 2012

CCIC QFD PROJECT ABUDAHBI, MARCH 2012 To till date
Project: QUS PROJECT
Client: ADCO
Designation: QC Supervisor - Instrumentation

QC Engineer - Instrumentation at Bechtel,PLL
  • Qatar - Doha
  • November 2008 to February 2012

Punj Lloyd Ltd.-Qatar-Doha, Nov 08'to Feb. 9 2012
Project: New Doha International Airport - CP16 - Fuel Systems
Client: Bechtel
Designation: QC Engineer - Instrumentation


✓ Responsible for preparation of Inspection & Testing Procedures for various systems (ITP) and Inspection reports upon arrival of materials at site. Review of Vendor factory test reports, field inspection of instruments, equipments and its related installations in correlation with Project Specifications. Project Scope includes integrated control system for process control, Field Instrumentation, Radar Tank Gauging system, Fire Alarm System, Security System, Public Address System, Telecommunication Distribution System & Pipeline Leak Detection System. Reviewing and preparing ITP, FAT Report, vendor test report, sat inspection and documents' reviewing, Inst calibration inspection, reviewing cal report, ensuring approved data sheet being used during calibration, inspection of Cable laying, termination, meggring & continuity test of various type of cable, inspection of cable tray, JB, CONTROL PANEL etc inspection of Impulse line tubing and leak test for process inst. MOV master station Packsan3.Controling test equipment cal test report. Issuing NCR, QAN if any Discrepancy found during execution and its not in line with project specification, Team leadership and supervisory work experience.
✓ Supervising, training, and development of technicians and support personnel.
✓ An effective communicator with excellent relationship management skills and strong analytical, problem solving & organizational abilities.
✓ Supervise the instrumentation team during the job execution.

QA/QC Engineer/Inspector - Instrumentation at HV & MV cable
  • France
  • November 2008 to February 2012

Punj Lloyd Ltd.-Qatar-Doha, Nov 08'to Feb. 9 2012
Project: New Doha International Airport - CP16 - Fuel Systems
Client: Bechtel
Designation: QC Engineer - Instrumentation


✓ Responsible for preparation of Inspection & Testing Procedures for various systems (ITP) and Inspection reports upon arrival of materials at site. Review of Vendor factory test reports, field inspection of instruments, equipments and its related installations in correlation with Project Specifications. Project Scope includes integrated control system for process control, Field Instrumentation, Radar Tank Gauging system, Fire Alarm System, Security System, Public Address System, Telecommunication Distribution System & Pipeline Leak Detection System. Reviewing and preparing ITP, FAT Report, vendor test report, sat inspection and documents' reviewing, Inst calibration inspection, reviewing cal report, ensuring approved data sheet being used during calibration, inspection of Cable laying, termination, meggring & continuity test of various type of cable, inspection of cable tray, JB, CONTROL PANEL etc inspection of Impulse line tubing and leak test for process inst. MOV master station Packsan3.Controling test equipment cal test report. Issuing NCR, QAN if any Discrepancy found during execution and its not in line with project specification, Team leadership and supervisory work experience.
✓ Supervising, training, and development of technicians and support personnel.
✓ An effective communicator with excellent relationship management skills and strong analytical, problem solving & organizational abilities.
✓ Supervise the instrumentation team during the job execution.


CCIC-UAE-Abu Dhabi, June 07' - Nov 08'
Project: Habshan Gas Expansion Project
Client: GASCO
Designation: QA/QC Engineer/Inspector - Instrumentation


✓ Routine Area Surveillance of Instrumentation erection activities
✓ Supervision Inspection & Witnessing according to Project Specification, QCP & ITP
✓ Established field inspection & Testing Procedures for E & I works with the assistance of Site Project Engineers.
✓ Inspection for the Installation of Field mounted Instruments, Junction Boxes, Local Panels, Pneumatic Leak Test of Air Line Tubing /Impulse line tubing, Insulation Resistance test and Continuity Check for Instrument Cables.
✓ Inspection for the Installation of DCS Panel, ESD Panel, Fire & Gas System Panel, Consoles & Computers with Printer, Communication system panel and Weather Monitoring System in the Main Control Building.
✓ Also witness the Electrical HV & MV cable and Fiber Optic cable Splicing as per the approved drawing and Specification
✓ Inspection for the Electrical & Instrument Cable Trenches prior to cable Pulling and after Cable Pulling to release for the next activities. Also inspection of Cable ladders and Cable trays in the Field, Electrical Substations, SIH and in the Main Control Buildings. Inspection for the Field Electrical and Instrumentation cables, Underground and Above ground cables and Fiber Optic Cable Installation
✓ Inspection for the Installation of Grounding Cable and Bus bar in the Field and Buildings and Connection to the equipment as per the approved drawing and specification.
✓ Inspection for the Installation of Fire & Gas System in the Field such as Push Button, Horn & Beacon and Fire Detection System.
✓ Inspection and witness for inst calibration and reports and ensuring calibrated Equipment being used for calibration of project inst
✓ Controlling and tracking all Inst test Equipment cal test certificate to make sure correct equipment being used during cal.
✓ Prepare daily logs and reports. Maintain records of inspections made, test performed, work executed, etc. Perform all work in accordance with the Contract Administration Procedures Manual.

QA/QC Engineer/Inspector - Instrumentation at GASCO
  • United Arab Emirates - Abu Dhabi
  • June 2007 to November 2008

CCIC QFD PROJECT ABUDAHBI, MARCH 2012 To till date
Project: QUS PROJECT
Client: ADCO
Designation: QC Supervisor - Instrumentation

QA/QC Inspector - Instrumentation at SABIC
  • Saudi Arabia
  • June 2000 to April 2007

SABIC-Saudi Arabia, June 00' - April 07'
Project: Ibn rushd & Yanpet expentation
Client: SABIC
Designation: QA/QC Inspector - Instrumentation


✓ Give on-site resolution regarding construction issues
✓ Competency to issue Non-conformance Reports with respect to electrical and instruments works to sub-contractor and/or Vendor Personal for rectification.
✓ Reviewing sub contractor Documents Such as ITP, QCP, Material Submittal, Method Statement.
✓ Field Inspection area surveillance and implementing project specification, Ensuring Approved, IFC Drawing being used during Execution of work
✓ Review of Vendor factory test reports, field inspection of instruments, equipments and its related installations in correlation with Project Specifications.

QA/QC Inspector - Instrumentation at SABIC
  • India
  • June 1997 to December 1999

CCIC-Saudi Arabia, June 97' - Dec 99'
Project: Yanbu Petrochemicals (YANPET) & PTA Utility project
Client: SABIC
Designation: QA/QC Inspector - Instrumentation


✓ Give on-site resolution regarding construction issues; such as raceway and cable tray ladder rack support location as per NEMA VE-2.
✓ Attend and converse Client's concern regarding the issues on construction activities and give resolution.
✓ Responsible for the review of materials as per specification and the suitability on area classification prior to procurement.
✓ Mechanical completion Inspection for MCCR release, Area Punching and Punch listing, Processing and Updating of QC documentation, QC Dossier and Implementing the QC plan.
✓ Also responsible for witnessing Combined Instrument Loop check and Calibration of Pressure transmitter, Flow, Differential, Controller, Control Valve Relief Valves, Level Transmitter, gauges etc.
✓ Also Coordinates with Clients Project Inspection Unit for project Inspection and Stage wise activities for Witness or Hold Points.
✓ Inspection for the Installation of Grounding Cable and Bus bar in the Field and Buildings and Connection to the equipment as per the approved drawing and specification.
✓ Responsible for Field instrument installation Inspection, Inspection of Junction box, Panel, DCS, cable tray, cable testing and continuity, cable laying, Termination etc, instrument Calibration Inspection, Impulse line leak testing

QA/QC Inspector - Instrumentation at PDO
  • Oman
  • October 1996 to April 1997

CCIC-Oman, Oct 96' - Apr 97'
Project: Fahud Wet Gas Line replacement & Fahud natih gas supply Project
Client: PDO (Petroleum Development Oman)
Designation: QA/QC Inspector - Instrumentation


✓ Routine Area Surveillance of Instrumentation erection activities
✓ Inspection & Witnessing according to Project Specification, QCP & ITP
✓ Established field inspection & Testing Procedures for E & I works with the assistance of Site Project Engineers.
✓ Inspection for the Installation of Field mounted Instruments, Junction Boxes, Local Panels, Pneumatic Leak Test of Air Line Tubing /Impulse line tubing, Insulation Resistance test and Continuity Check for Instrument Cables.
✓ Inspection for the Installation of DCS Panel, ESD Panel, Fire & Gas System Panel, Consoles & Computers with Printer, Communication system panel and Weather Monitoring System in the Main Control Building.

QA/QC Inspector - Instrumentation at GASCO
  • United Arab Emirates
  • June 1995 to May 1996

CCIC-Abu Dhabi, Jun 95' - May 96'
Project: Thamama C&F Gas Gathering Project in Habshan
Client: GASCO
Designation: QA/QC Inspector - Instrumentation


✓ Routine Area Surveillance of Instrumentation erection activities
✓ Inspection & Witnessing according to Project Specification, QCP & ITP
✓ Established field inspection & Testing Procedures for E & I works with the assistance of Site Project Engineers.
✓ Inspection for the Installation of Field mounted Instruments, Junction Boxes, Local Panels, Pneumatic Leak Test of Air Line Tubing /Impulse line tubing, Insulation Resistance test and Continuity Check for Instrument Cables.
✓ Inspection for the Installation of DCS Panel, ESD Panel, Fire & Gas System Panel, Consoles & Computers with Printer, Communication system panel and Weather Monitoring System in the Main Control Building.

QC INST at ccic abudhabi
  • United Arab Emirates - Abu Dhabi
  • June 1995 to May 1996

 Routine Area Surveillance of Instrumentation erection activities
 Inspection & Witnessing according to Project Specification, QCP & ITP
 Established field inspection & Testing Procedures for E & I works with the assistance of Site Project Engineers.
 Inspection for the Installation of Field mounted Instruments, Junction Boxes, Local Panels, Pneumatic Leak Test of Air Line Tubing /Impulse line tubing, Insulation Resistance test and Continuity Check for Instrument Cables.
 Inspection for the Installation of DCS Panel, ESD Panel, Fire & Gas System Panel, Consoles & Computers with Printer, Communication system panel and Weather Monitoring System in the Main Control Building.

Instrumentation Supervisor at Arab Union Contracting Co
  • Libya - Tripoli
  • October 1994 to April 1995

Arab Union Contracting Co -Libya, Oct 94' - Apr 95'
Project: Thamama C ZANAOOR POWER PLANT
Designation: Instrumentation Supervisor



Supervises the loop check, trouble shooting, repair and Function test, testing of a wide range of electric, electronics, pneumatic and microprocessor based analytical instruments and process analyzers; lab analyzers, instrument equipment and associated control systems, protections with associated Programming Logic Control (PLC) with ESD Systems, fire & gas systems, telecommunication system, Burner Management System (BMS), "GE" Gas Turbine Control and Protection System, distribution control systems (DCS), turbine machinery, steam generators, thermal control system and pipelines instrument equipment in the plant. Includes monitoring of work execution and providing guidance to ensure conformity to statutory and Company regulations, deals personally with more complex maintenance, supervises shutdown and turnaround maintenance activities, and executes modifications and commissioning of expansions for new plant activities. Prepares turnaround and modular shutdown plan and material requirement for instrumentation and control systems, plant expansion, modernization and installation/Commissioning of equipments

SUPERVISOR at AUCC
  • Libya - Tripoli
  • October 1994 to April 1995

Supervises the loop check, trouble shooting, repair and Function test, testing of a wide range of electric, electronics, pneumatic and microprocessor based analytical instruments and process analyzers; lab analyzers, instrument equipment and associated control systems,

Education

Bachelor's degree, Eletronic&communication
  • at jamia
  • August 1995
Bachelor's degree,
  • at JAMIA
  • July 1995

BE Electronic &telecommunication (INSTRUMENT) Position: QC inspector/Engineer (Instrument) MOHAMMAD WALIULLAH

Specialties & Skills

Instrumentation
Insulation
Inspection
Installation
i have 17 year of experience
CALIBRATION
DRAWING
FIELD INSPECTION
INSPECTION
INSTRUMENTATION
TELECOMMUNICATION
TEST REPORTS
TESTING

Languages

English
Expert