Total des années d'expérience: 9 Années, 7 Mois
février 2020
A À présent
Senior Solar O&M Engineer
à Sharaf DG Energy LLC
Lieu :
Émirats Arabes Unis - Dubaï
Projects:
1. 1.529MW rooftop Solar Power Plant at Retail Logistics DWC.
2. 827 KW Solar Power Plant at Dubai Holding Headquarters Um Seqeim, Dubai.
3. 508.8KW Solar Power Plant at Steinweg Sharaf JAFZA.
4. 217.8KW Solar Power Plant at Hadeed Trading JAFZA.
5. 2.544 MW Solar Power plant at Zabeel Park and Emirates Towers, Dubai
6. 500Villas DEWA project each 4.29KW in Dubai, UAE.
7. 100KW Solar Power Plant at Time Square Center Um Sqeim, Dubai
8. 40KW Dubai Space Station Solar Power Plant in Khawaneej, Dubai.
1. 1.529MW rooftop Solar Power Plant at Retail Logistics DWC.
2. 827 KW Solar Power Plant at Dubai Holding Headquarters Um Seqeim, Dubai.
3. 508.8KW Solar Power Plant at Steinweg Sharaf JAFZA.
4. 217.8KW Solar Power Plant at Hadeed Trading JAFZA.
5. 2.544 MW Solar Power plant at Zabeel Park and Emirates Towers, Dubai
6. 500Villas DEWA project each 4.29KW in Dubai, UAE.
7. 100KW Solar Power Plant at Time Square Center Um Sqeim, Dubai
8. 40KW Dubai Space Station Solar Power Plant in Khawaneej, Dubai.
janvier 2019
A février 2020
Site Engineer
à Helios Phoebe Solar Energy System Installation LLC
Lieu :
Émirats Arabes Unis - Dubaï
Projects:
1. 3.8MW Solar Power Plant at DFC(Dubai Festival City) mall, Dubai, UAE
(UAE’s largest rooftop solar Power Plant)
2. 250KW Solar Power Plant at Transworld in Jebel Ali, Dubai, UAE
3. 50KW solar Power Plant for Villa at Emirates Hills, Dubai UAE
Responsibilities:
1. Installation and Monitoring of On-Grid, Off-Grid Solar System.
2. Testing and Commissioning of On-Grid Solar power plants.
3. Preparation of Drawings and proposals.
4. Site Inspection.
5. Installation of Main Distribution Boards (MDB’s) and Sub Main Distribution Boards (SMDB’s).
1. 3.8MW Solar Power Plant at DFC(Dubai Festival City) mall, Dubai, UAE
(UAE’s largest rooftop solar Power Plant)
2. 250KW Solar Power Plant at Transworld in Jebel Ali, Dubai, UAE
3. 50KW solar Power Plant for Villa at Emirates Hills, Dubai UAE
Responsibilities:
1. Installation and Monitoring of On-Grid, Off-Grid Solar System.
2. Testing and Commissioning of On-Grid Solar power plants.
3. Preparation of Drawings and proposals.
4. Site Inspection.
5. Installation of Main Distribution Boards (MDB’s) and Sub Main Distribution Boards (SMDB’s).
juillet 2017
A octobre 2018
Site Engineer
à M/S S.H.R.S Construction Co.
Lieu :
Pakistan - Sialkot
Responsibilities:
1. To Prepare Solar System Proposals.
2. To lead the team of technicians to complete the project effectively.
3. Installation and Maintenance of Solar System.
4. Installation of Main Distribution Boards, (MDB’s), Sub Main Distribution Boards (SMDB’s), and Final Distribution Boards (FDB’s).
1. To Prepare Solar System Proposals.
2. To lead the team of technicians to complete the project effectively.
3. Installation and Maintenance of Solar System.
4. Installation of Main Distribution Boards, (MDB’s), Sub Main Distribution Boards (SMDB’s), and Final Distribution Boards (FDB’s).
juillet 2016
A juin 2017
Electrical Engineer
à Gujranwala Electric Supply Company
Lieu :
Pakistan - Sialkot
A) Monitoring of Grid Station
Monitoring of grid station yard and Equipment which is as follow:
1) Power Transformer 2) Lightening Arrestor
3) SF6 Breakers 4) CT and PT 5) Bus Bar
6) VCB Trollys 7) Capacitors 8) Grounding System
B) Controling and Monitoring of Power Transformers
1) Monitorng of power transformer from Control Pannel as well as physical monitorng.
2) Monitoring of Alarms like CB Mech Fail, SF6 Trip Lockout, Oil Pressure High, Excessive Tempersture, T/F Buchhloz, Cooling System Fail etc.
3) Monitoring of Relays like Diff Trip, Oil Temp trip, Buchhloz Trip, O/C and E/F Trip etc.
C) Important Tests Monitoring
Monitoring of Important test of Transformer and Circuit Breakers which are as follow:
1) T.T.R test 2) C.E.S Test 3) C & DF Test 4) Meggar Test 5) On Time Test 6) Tripping time test 7) Oil Test
Monitoring of grid station yard and Equipment which is as follow:
1) Power Transformer 2) Lightening Arrestor
3) SF6 Breakers 4) CT and PT 5) Bus Bar
6) VCB Trollys 7) Capacitors 8) Grounding System
B) Controling and Monitoring of Power Transformers
1) Monitorng of power transformer from Control Pannel as well as physical monitorng.
2) Monitoring of Alarms like CB Mech Fail, SF6 Trip Lockout, Oil Pressure High, Excessive Tempersture, T/F Buchhloz, Cooling System Fail etc.
3) Monitoring of Relays like Diff Trip, Oil Temp trip, Buchhloz Trip, O/C and E/F Trip etc.
C) Important Tests Monitoring
Monitoring of Important test of Transformer and Circuit Breakers which are as follow:
1) T.T.R test 2) C.E.S Test 3) C & DF Test 4) Meggar Test 5) On Time Test 6) Tripping time test 7) Oil Test
mars 2015
A février 2016
Management Associate
à PTCL Etisalat Group Company
Lieu :
Pakistan - Sialkot
Responsibilities:
1. Installation and Supervision of Solar System, Inverters and Batteries of the Telecom Sites.
2. Power Monitoring
3. Monitoring of Power Alarms at NOC.
1. Installation and Supervision of Solar System, Inverters and Batteries of the Telecom Sites.
2. Power Monitoring
3. Monitoring of Power Alarms at NOC.
juin 2013
A juillet 2013
Internee
à Nishat Mills Ltd.
Lieu :
Pakistan - Faisalabad
Technical mill surveys for trouble-shooting.
Technical Surveys of Power Plant.
Familiarity with Invertors and Driver circuits of Machines.
Technical Surveys of Power Plant.
Familiarity with Invertors and Driver circuits of Machines.