wasfy لاشين, QA/QC DEPUTY MANAGER

wasfy لاشين

QA/QC DEPUTY MANAGER

SAUDICO

البلد
المملكة العربية السعودية - جدة
التعليم
بكالوريوس, CIVIL ENGINEERING
الخبرات
21 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :21 years, 0 أشهر

QA/QC DEPUTY MANAGER في SAUDICO
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ سبتمبر 2017

Duration: Sep2017 - present
Employer: Saudico
Project: KAFD
Position: QC DEPUTY MANAGER

Responsibilities: 1-implementation of project Quality plan and follow up quality related issues of all construction activities for the assigned discipline within the assigned zones.
2- Performing of surveillance inspection activities and reporting results to supervisor.
3-performing and ensures on -time issuance of RFIs (request for inspection) for the assigned discipline within the assigned area
4- Issuance of NCRs for the assigned discipline within the assigned area
5- Supervises; follows up, technically assist and verify effective closure of issued NCRs within the assigned area.
6- Receives assignments from supervisor related to issued LBEs (log book entries) on daily basis, perform required actions, follow-up, technically assist and verify effective closure of issued LBEs
7-performs all inspection activities, and provide the technical advices to construction team
8- Comply with contract specifications, drawings and applicable standard.
9- Witnesses required tests complying with project specifications and report any variance to the supervisor.
10- Submits and records daily basis reports including but not limited to; NCRs issued.

Consultant Residential ENGINEER في DAAM ENGINEERING CONSULTANS
  • المملكة العربية السعودية - المنطقة الوسطى
  • مايو 2015 إلى أغسطس 2017

2- DAAM Engineering Consultant
Project : NADEC City -Haradh Projects
Consultant Project Manager -May 2015 - AUG.2017

Job Responsibilities:
To manage the site by liaising with the different Department Managers, Client, Sub-contractors and other trades, coordinating all aspects of the works so that the project would complete at schedule time within budget and on time.
 Monitor day to day operations of the department personnel to guarantee compliance with both client & code specifications.
 Have a commercial understanding of the project, advising and implementing cost savings at all times and represent the company in a professional and proactive manner in all dealings with those associated with.
 Work closely with the Contracts Manager to plan the project effectively, by ensuring that the project requirements, specification, design drawings, health and safety proposals are all read, understood and agreed. Scheduling the work to be carried out to ensure the targets are achieved and high quality of the work is maintained.
 Form and maintain the storage facilities and manage stock planning so that stock, materials, plant and tools are organized to meet the time scales for the project.
 Set up an emergency plan and general site facilities for the project, ensuring that these are in line with the health and safety proposal.
 Formulate a material schedule for the project, including take off from issued drawings and specifications, and produce requisitions as far ahead of programmed periods as possible to enable best prices to be obtained by the Purchasing Department.
 Supervise and manage all site based operatives, overseeing all aspects of their work, to include; carrying out safety inductions; tool box talks; controlling quality of work; ensuring method statement and order fulfilment; cleanliness & tidiness; the use of plant and tools, waste reduction; upkeep of plant and facilities; use of personal protection equipment/wear.

CONSTRUCTION MANAGER في Saudi Bin ladin Group
  • المملكة العربية السعودية - المنطقة الغربية
  • مايو 2012 إلى مايو 2015

Saudi bin laden group- ABCD
Project: HARAM 3rd.EXTENSION-MAKKAH/PLOT-02
Construction manager - May 2012 - May 2015

Having overall responsibility for effectively managing the plant, labor and equipment to achieve maximum efficiency and cost effectiveness. Making preparations before work begins on site including communicating with the public, architects and engineers. Also in charge of keeping track of progress and ensuring that projects are on time and to budget.

construction engineer في Saudi Bin ladin Group
  • المملكة العربية السعودية - المنطقة الغربية
  • يونيو 2003 إلى مايو 2012

Duration: OCTOBER2002 - JUNE 2004 -
Employer: Saudi Bin Group
Project: COstruction of School Buildings
Position: site engineer

Responsibilities: 1-Supervision of work activities on site and reporting any trends for delays to the Construction Manager
2-Maintain and record daily site events
3-Review requirements of the specification and relevant standards and ensure understandings and compliance with the specified requirements
4-Monitor progress of work against construction programs and submission of required site reports as required.
5-Take necessary corrective actions o work required site reports as required
6-Monitor, control, and coordinate the works of different trade subcontractors and report on their progress and or trends for problems / delays to section Engineer.
7-Ensure that safety procedures are implemented o site and report any risks to Section Engineer and safety officer.
8-Supervise site works in accordance with project specifications, method statements, project quality plan, ITPs, approved and valid construction drawings and instructions given by PM / PCM/ Section Engineer.
9- Coordinate for needed equipment with Section Engineer and construction manager.

الخلفية التعليمية

بكالوريوس, CIVIL ENGINEERING
  • في Zagazig University
  • يوليو 2002

Bachelor of engineering 2002 Zagazig University; Egypt

Specialties & Skills

الصيد
Management
AUTO CAD
CONSTRUCTION DRAWINGS
ENGINEER
INSPECTION
LOCKOUT/TAGOUT
PROGRESS
SAFETY PROCEDURES

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

نقابة المهندسين المصريه- جمعية المهندسين السعوديين
  • فعال
  • July 2002