Preparing Method Statement and Inspection and Test Plan (

Electrical Engineer at ITP
  • June 2013 to February 2013

Preparing Method Statement and Inspection and Test Plan (

Administrator at Doh
  • United Arab Emirates
  • April 2011 to January 2011

2013 -

Project Cost
  • June 2010 to September 2010

QAR 850, 000, 000.00

Project Cost at Khalid Bin Ahmed Al-Suwadi Contracting, Trading &Industrial Co. W.L.L
  • United Arab Emirates
  • June 2010 to August 2010

Classified as FIRST CLASS specialized ‘Grade A’ Contracting Company in the field of roads and infrastructure by the Central Tenders Committee (CTC) and a Member of Qatar Chamber of Commerce & Industry (QCCI) since 1991

Project: Qatar Petroleum

EPIC for Grading of Corridors & Construction of Associated Roads for the Future Downstream Industries at RasLaffan Industrial City (GC13112400)

Electrical Engineer at Naba International Enterprises Ltd
  • Saudi Arabia
  • August 2008 to April 2010

Preparing Method Statement and Inspection and Test Plan (ITP). And Material Submittal.
Attending and witnessing for Factory acceptance test for Electrical panels, cables and diesel generator. Preparing consolidated permit to work.
Preparing Spare Parts & Interchangeability Records.
Review and interpret electrical drawings before quality takeoff. Prepare material quantity take off.
Gather test results for submittal and review by the client.
Conduct interfacing with other discipline in the field in order to attain the objective and aver any miscalculation in the field.
Provide early warning of potential quality problems and issues.
Provide expertise to the Construction Manager and Site Team to avoid and resolve quality problems.

Conduct QC inspection as planned on Inspection and Testing Plan (ITP). Provide RFIs (Request for Inspection).
Prepare Technical Query as project dictates and for submittal prior to client’s approval.
Inspection and supervise the subcontractors works Prepare surveillance report if quality problem is at stake.
Supervise installation, testing, commissioning and integration of KAHRAMAA1600kVA, 11/0.415kV Package Substation, 810kVA, 0.415kV Diesel Generator, 80kVA Dual Redundant AC UPS,

Electrical Distribution Board, feeder pillar, power & light’s, high mast and sewerage & booster pumps.
Supervise installation, testing, commissioning and integration of810kVA, 0.415kV Diesel Generator, 80kVA Dual Redundant AC UPS, Electrical Distribution Board, feeder pillar, power & light’s, high mast and sewerage & booster pumps
Supervise sub-contractors for installation, testing, commissioning and integration for telecommunication, fire alarm, IT, building management and security system to maintain good quality of works.

QA at ASHARQIA CHAMBER INVESTMENT BUILDING IN ROYAL COMMISSION
  • United Arab Emirates
  • July 2009 to April 2010

Preparing Method Statement and Inspection and Test Plan (ITP), Material Submittal and consolidated permit to work.
Review and interpret electrical drawings before quality takeoff. Prepare material quantity take off.
Conduct QC inspection as planned on Inspection and Testing Plan (ITP).
Gather test results for submittal and review by the client.
Review and interpret electrical drawings together with Electrical Manager before quality takeoff.
Conduct interfacing with other discipline in the field in order to attain the objective and aver any miscalculation in the field.
Provide early warning of potential quality problems and issues. Provide inputs/updates on the status of the Electrical, Telecommunication, Data, Public Address, CATV, CCTV and Fire Alarm System quality service.
Provide expertise to the Construction Manager and Site Team to avoid and resolve quality problems.
Provide IRs (Inspection Request) and checklist for daily inspection. Prepare Technical Query as project dictates and for submittal prior to client’s approval.
Prepare surveillance report if quality problem is at stake. Accompany client on any request site visit.
Conduct weekly progress meeting as required in the Contract. Review Drawings and Bill of Quantities for final acceptance.
Prepare material quantity take off.
Prepare Red Line and As-built drawing for electrical. Prepare shops drawing to be approved by the client.
Prepare and issued drawing to the Supervisor/Foreman for job execution.

Project at Royal Commission
  • Saudi Arabia
  • August 2008 to July 2009

EXPANSION OF TEMPORARY ACADEMIC FEMALE FACILITY at JUC,
PHASE - 2 ROYAL COMMISSIONS

Cost Project: QAR 27, 000, 000.00

QA at Consolidated Contractors Co. W.L.L
  • Saudi Arabia
  • May 2006 to June 2008

Preparing Method Statement and Inspection and Test Plan (ITP) and Material Submittal.
Preparing consolidated permit to work.
Review and interpret electrical drawings before quality takeoff. Prepare material quantity take off.
Conduct QC inspection as planned on Inspection and Testing Plan (ITP).
Gather test results for submittal and review by the client.
Review and interpret electrical drawings together with Electrical Manager before quality takeoff.
Conduct interfacing with other discipline in the field in order to attain the objective and aver any miscalculation in the field.
Provide early warning of potential quality problems and issues. Provide inputs/updates on the status of the Electrical, Telecommunication, Data, Public Address, CATV and Fire Alarm System quality service.
Provide expertise to the Construction Manager and Site Team to avoid and resolve quality problems.
Provide IRs (Inspection Request) and checklist for daily inspection. Prepare Technical Query as project dictates and for submittal prior to client’s approval.
Prepare surveillance report if quality problem is at stake. Accompany client on any request site visit.
Conduct weekly progress meeting as required in the Contract. Review Drawings and Bill of Quantities. Prepare material quantity take off.
Prepare Hold Point Release to quantify the materials used in the site.
Prepare Red Line and As-built drawing for electrical. Prepare shops drawing to be approved by the client.
Prepare and issued drawing to the Supervisor/Foreman for job execution.

Site Engineer at Nestle Philippines Inc.- Microhm Industries Inc. Construction, Installation & Maintenance Lapasan
  • Philippines
  • August 2004 to April 2006

Reviewing Electrical design drawings to generate work program at site.
Scheduling and planning of electrical works that will be implemented at site to ensure that the work will meet the client’s requirements and schedule.
Electrical site engineer, supervision of all electrical works and submitting daily, weekly and monthly reports for work progress, issues and rectification.
Responsible in providing electrical shop drawings for client’s approval.
Responsible for inspecting electrical construction work to see if it conforms to the project requirements, specification and necessary local codes.

SQC at Doh
  • United Arab Emirates
  • September 2014 to

Technical Seminar on Earthing Design and Calculation for Substation, HV Protection System, Relay Parameter Setting & Testing and Financial Literacy for OFW.

SQC at Doh
  • United Arab Emirates
  • April 2014 to

Technical Seminars on UPDA Registration and Requirements, Latest Trend in VIDEO Communication, Live Broad Cast and Website Technology Powered by My VIDEO Talk.

  • United Arab Emirates
  • January 2003 to

as “New Electrical Engineering Cepalco procedures & requirements for Electrical meter installation and other services City Building Office procedures & requirements in applying and processing of building & electrical permits.

Project at Qatar Petroleum
  • United Arab Emirates
  • to
Project at Royal Commission
  • Saudi Arabia
  • to
Electrical Engineer at National Electrical Code or Saudi Aramco Engineering Standard
  • to

Supervise to installed and cable termination of switchgear panel 34.5 kV and transformer 1000kVA, 34.5/6 kV.
Design automatic change over-switch (permanent supply to generator) for server of Information System Department.
Design electrical lay-out for temporary housing of employee.
Design temporary supply for the maximum load of 704 kilo-watts at minimum cost.
Design control and power circuit for motor pump.
Responsible for preservation of de-energize electrical equipment like motors, transformers and control panels. Certified Saudi Aramco Work Permit Receiver.
Inspect all installed temporary main distribution panel, sub-distribution panel etc. if it is acceptable

Engr at Leonard Abad
  • Qatar
  • to
Supervisor at Consolidated Contractors Co. W.L.L Khursaniyah Producing Facilities
  • Saudi Arabia
  • to

Education

Bachelor's degree, Electrical Engineering
  • at Mindanao University of Science and Technology
  • March 2004

in

High school or equivalent,
  • at Secondary
High school or equivalent,
  • at Holy Cross High School

Specialties & Skills

CABLEADO
CUSTOMER RELATIONS
ENGINEERING
FINANCIAL
MICROSOFT WORKS
PROGRESS
QUALITY
TELECOMMUNICATIONS

Languages

English
Expert
Tagalog
Expert