William Castuli, Document Controller

William Castuli

Document Controller

Roots Energy and Engineering Services

Location
Qatar - Doha
Education
Bachelor's degree, Information Technology
Experience
18 years, 9 Months

Share My Profile

Block User


Work Experience

Total years of experience :18 years, 9 Months

Document Controller at Roots Energy and Engineering Services
  • Qatar
  • My current job since February 2020

Maintaining and updating electronic information systems, distributing documents, and
ensuring accuracy of all documentation
* Ensuring regulatory procedures and changes are followed:
* Compiles and maintains control records and related files to release blueprints, drawings,
and engineering documents.
* Confers with document originators or engineering liaison personnel to resolve
discrepancies and compiles required changes to documents.
* Posts changes to computerized or manual control records, releases documents, and
notifies affected departments.
* Maintains related files and prepare reports and memorandums.
* To prepare official correspondences for both internal & external issues.
* To communicate with clients as & when required Handling of invoices & petty cash
* Engineering documents filing
* To prepare submittals & maintain ISO files as required
* Comply with the company's IMS Policy and other related regulations
* Implements IMS Policy and procedures to ensure all works are doing in a safe way
To prevent injury, environmental pollution, and occupational health hazard, and property
damage

Document Controller at Al Wakeel Trading and Contracting
  • Qatar
  • May 2018 to December 2019

Administer the documentation such as Method Statement and other Relevant Document
for the Project.
* Implement and execute the procedure of the document Matrix for proper channeling or
distribution of information for the success of the project.
* Assigned to be administer the submission of Tender to Ashghal.
o Project ID IA 2018 C 079 I Tender Documents for - Access Road to Ras Bu
Abboud Stadium
o Project ID IA 2018 C 076 G Development of Access Roads to Integrated Worker
Accommodation Community at Al Khor.
o Project ID IA 2018 C 077 I Access Roads for Umm Ghuwailina Integrated Worker
Accommodation Community.
o Project ID IA 2019 C 003 G Construction Diversion of Sewage Flows from Doha
South Area to Doha West STW PS44 to PS32A - C819

Document Controller at SNC Lavalin Petrofac
  • Qatar
  • August 2017 to February 2018
Lead Document Controller at ALYSJ JV
  • Qatar
  • September 2014 to July 2017

Project: Qatar Rail - Gold Line Doha Metro Project
Role:
* Mainly Use is Aconex as document transmittal and creating workflow for the approval and
submission of documents.
* Uploading the IRE, IRP, DPR, As Built Drawing, FCR.
* Creating Aconex Work Flow for the Document required to be inspected by the specialist.
* Distribute the information according to the Distribution Matrix.

Document Controller at HYUNDAI Engineering & Construction Co.
  • United Arab Emirates
  • July 2013 to July 2014

Project: MA’ADEN ALUMINUM PROJECT (KSA)
Role:
* Administer the documentation flow on site specifically on Structural Dept.
* In Collaboration of Excel and MS Access as the tools on handling the documentation
system to provide all the necessary data to be feed on. (IRE, IRP, DPR, As Built
Drawing).

Document Controller at Root Energy Engineering Services
  • Qatar
  • June 2009 to August 2012

Designed, Construction, Handover)
Role:
Designed Stage:
* Administer the documentation flow for the Approving Material Specification,
Method Statement, Risk Assessment and other document to support the
execution of activity on construction phase.
* Assisting the Designed team to analyze the quantity of material will be required to
place an order by analyzing and relying on P&ID drawing provided by the client.
William Castuli
Document Controller
974-74796185
Page 5
Construction Stage:
* Preparing all the necessary Document to be given on the construction team to
execute the activity on site such as P&ID Drawing, Method Statement.
* Assisting for the construction team in placing an order to the manufacturer for the
Quantity required and modification if there is any.
* Administering the flow of IRP, IRE, Material Quality Certification, DPR, Red Mark
Drawing.
Handover Phase:
* Preparing the Dossier, Manufacturer details and Manuals, Method statement IRE,
IRP, As Built Drawing.
* Using MS Access and supported by MS Excel we created a soft copy version of e-
book.

Document Controller Admin Assistant at Qatar Kentz
  • Qatar
  • April 2006 to July 2009

Project: SIDRA PROJECT
Educational City, Qatar
Duration: 12th February 2009 to 25th May 2009
Position: Material Controller
Designed Stage:
 Specifically involve on the material specification submittal.
 Comparing the Material Specification available in the local market and to the Technical Specification of the contract.
 Collecting the necessary document that will support the Material has met the required specification according to Technical Requirement.
 Reading the drawing outline to identify the quantity of material will be required.

Project: Ras Laffan Olefin Company Project
Ras Laffan Industrial City, Qatar
Duration: 1st September 2008 to 12th February 2009
Position: Project Coordinator cum Document Controller
Construction Stage:
 Preparing the necessary Document to be given on the construction team to execute the activity on site such as P&ID Drawing, Method Statement.
 Administering the flow of IRP, IRE, Material Quality Certification, Daily Progress Report.
 Assisting the Construction Manager on the Report to the Main Contractor all the progress and accomplishment of the project.

Project: Ras Gas RL (2) COMMON OFFPLOT- K020
Client: Ras Gas Company Limited
Ras Laffan Industrial City, Qatar
Duration: 9th November 2007 to 1st September 2008
Position: Document Controller
Construction Stage:
 Preparing the necessary Document to be given on the construction team to execute the activity on site such as P&ID Drawing, Method Statement.
 Administering the flow of IRP, IRE, Material Quality Certification, DPR, Red Mark Drawing.

Project: Dolphin Onshore Upstream and Compression Facilities.
Client: Dolphin Energy, Ras Laffan Industrial City, Qatar
Duration: 4th April 2006 to 9th November 2007
Position: Administrative Assistant/Document Controller
Construction Stage:
 Assigned in manpower food allocation and ID and gate pass coordination.
 Encoding the daily progress report (cable consumption) of the site and reported to the Planning dept.
 Assigned on the documentation of the Admin dept. make it assure that everything is update.

Junior Administrator at Young Guys Corporation
  • Philippines
  • June 2004 to January 2009

Operation:
* Serve as the immediate response team to assist any problem of the end user.
* Monitoring that the system is working properly.
* Set up a new network for the newly joined user.
* Updated the firewall protection and antivirus agent.
* Clustering of the system storage.
TRAININGS:
Title: ISO 14001:2004 ENVIRONMENTAL MANAGEMENT SYSTEM
DQS Management System Solution, Doha, Qatar
Objective: Training and Understand the value of EMS.

Education

Bachelor's degree, Information Technology
  • at San Sebastian College
  • January 2004

-Recoletos Sta. Cruz, Cavite City

High school or equivalent, Computer Technology
  • at San Sebastian College
  • January 2001

-Recoletos Sta.Cruz Cavite City

High school or equivalent, Computer Technology
  • at Calamba National High School
  • January 1995

courses: William Castuli Document Controller 974-74796185

Specialties & Skills

Cisco Switches
MS Office tools
Quality System auditing
DOCUMENTATION
FILE MANAGEMENT
GRAPHIC DESIGN
INFORMATION SYSTEMS
MICROSOFT OFFICE PACKAGE