Wilson Loren, Senior Planning Engineer

Wilson Loren

Senior Planning Engineer

Saudi Oger Ltd.

Lieu
Arabie Saoudite
Éducation
Master, Master in Business Administration
Expérience
25 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :25 years, 5 Mois

Senior Planning Engineer à Saudi Oger Ltd.
  • Arabie Saoudite - Jeddah
  • Je travaille ici depuis avril 2015

• Responsible of creating & monitoring Resources Loaded Schedules (baselines), analyze performance & create recovery plan in order to achieve completion objectives. Project management and scheduling tools used is Primavera P6 (Versions from releases 8.2 and 15.2).
• Responsible for preparing Client/Consultant Reports & presentations.
• Responsible of supervising Planning team on the project.
• Supervise planners in preparing master & detailed time schedules for EPC (Engineering - Procurement - Construction) Projects. Project management and scheduling tools used is Primavera P6 (Versions from releases 8.2 and 15.2).
• Responsible in assigning detail resources (Manpower, Equipments, in BOQ reference) for all Divisions (Civil/Structural, Finishes, MEP & External Works) in order to assess resource requirements & their levelling to optimize their needs within project schedule requirements. Project management and scheduling tools used is Primavera P6 (Versions from releases 8.2 and 15.2).
• Supervise/Responsible in assigning detailed activity codes, cost accounts, resources codes in the Project Schedule to generate Earn Value Management & S-curves. Project management and scheduling tools used is Primavera P6 (Versions from releases 8.2 and 15.2).
• Develop Methodologies for data collection & coordination to different site representatives in order to follow up project progress.
• Coordinate with PE/PCE in developing & monitoring Project Earn Value Management System
• Check, analyze & comment on subcontractor’s schedules to match SOL schedules (Main Contractor) and use it in developing detailed schedule.
• Provide reports on resource requirements (Direct & Indirect) Manpower Histograms & Spreadsheets to PD/PM.
• Follow up with Engineering, Procurement & Construction teams to collect & verify project Progress & use them in updating project schedule to assess the project milestones are achievable.
• Analyze actual project progress, revised critical path and available floats of activities and recommend possible solutions to Site Project Managers, Project Control Manager & PD/PM if critical path is beyond required completion dates.
• Prepares revised schedules for EPC to comply with the Project & Client/Consultant requirements. Project management and scheduling tools used is Primavera P6 (Versions from releases 8.2 and 15.2).
• Prepare & issue Short Term Work Plans (such as 2-Weeks or 4-Weeks look ahead) & communicate these plans to various members of Project Team.
• Prepares periodic reports for PD/PM, Head Office Management & Client/Consultant.
• Attend meetings with Project Management Team, Subcontractors and Client/Consultant to follow up project progress.
• Develop and follow Extension of Time procedure in coordination with PCM and contract Manager.

Lead Planner/Scheduler à FAST Consortium for the Riyadh Metro Project - Package 3
  • Arabie Saoudite - Riyad
  • octobre 2013 à février 2015

• Tasked to prepare an EPC work schedule loaded with Resources. The client is expecting from FAST consortium to satisfy minimum requirements as per contract. Project management and scheduling tools used is Primavera P6 (Versions from releases 7, 8.1 and 8.3).
• Have to work with the team of Schedulers headed by a Scheduling Manager and in close coordination with the PMO.
• Has to be involved with the in-house workshops concerning cost and schedule.
• Has to coordinate with the Line and Area Manager’s and Engineers as well as with the rest of the directly involved team members.
• Prepares the master schedule for Line 5 TBM works. Line 5 is the construction of approximately 13 km of distance underground railway with depth ranging from 14m, 24m and 35m, hence the use of TBM and/or NATM is considered during tender. It has one (1) interface station with Line-1 (by others) and eleven (11) underground train stations. It has also one (1) depot to develop around 50, 000 m2 underground facility of depth around 14 meters. Total project duration is 60 months. Project management and scheduling tools used is Primavera P6 (Versions from releases 7, 8.1 and 8.3).
• Had helped in the establishment of detailed procurement schedule according to standard processes in dealing with local as well as with imported materials and other resource requirements particularly those considered long lead items. Also involve in establishing detailed design schedule. Project management and scheduling tools used is Primavera P6 (Versions from releases 7, 8.1 and 8.3).
• Handles Line 4 scheduling works particularly the establishment of baseline and eventually the detailed working schedule. Line 4 is approximately 29 km of railway distance composed of 17 km of elevated viaducts, 5.8 km of cut and cover tunnel and more than 6 km at grade railway. Major methods and equipment to be used are Full Span Launching Method (FSLM), Precast Segment Method (PSM), Balance Cantilever Method (BCM), Cast In-Situ (CIS) and conventional construction process, hence resource allocations is one important challenge in the process of preparing the schedule in order to maximize the resource assignments. It has one (1) interface station, eight (8) railway stations, one (1) is a transfer station with Line-6 and initial plan shows around four (4) underground stations. Project management and scheduling tools used is Primavera P6 (Versions from releases 7, 8.1 and 8.3).
• Helped Line 6 in the refinement of baseline schedule, updating and in incorporating change notices to the recent updates at month 13. Line 6 has a total length of around 21 km., it is composed of cut and cover tunnels, viaducts using CIP, PCB, PSM and BCM methodologies, five (5) elevated stations, one (1) shallow underground stations and four (4) park and ride buildings. The project team is basically composed of CJV (structures), TJV (trackworks) & TSY (systems). Project management and scheduling tools used is Primavera P6 (Versions from releases 7, 8.1 and 8.3).
• To work and contribute in FAST Consortium as a team player.
• Able to maintain and manage to changes/upgrades of the project management scheduling tools using Primavera P6 (from version 7 up to release 8.3).

Senior Planning Engineer à Freyssinet Saudi Arabia
  • Arabie Saoudite - Jeddah
  • septembre 2008 à février 2015

Planning and scheduling works using Planning tools such as Primavera P6 Enterprise, MS Project and MS Office.

Building of WBS and complete activities for Project Baseline Schedule with resources.

Monitor progress accomplishment and prepares regular technical reports.

Project management and scheduling tools used is Primavera P6 (Versions from releases 6.1, 6.2 and 7, 8.1 and 8.3).

• To apply my knowledge in vital project management tools in the most efficient manner such as the preparation of design, procurement and construction schedule, monitor and modify the schedule, prepare daily, weekly and monthly updates and generate reports required until its completion.
• Basically prepares the work breakdown structure and detailed activities based on contract’s bill of quantities and other contract provisions, prepares manpower and equipment resource loading and activity duration estimate, carefully consider activity relations based on standard construction methodology (as also adopted by the company) and prepares the contract cost loading to schedule. Project management and scheduling tools used is Primavera P6 (Versions from releases 6.1, 6.2 and 7, 8.1 and 8.3).
• Prepares the weekly, monthly and completion reports. Also prepares presentation materials for the management meetings which include project highlights, updates in design, procurement and construction activities to include pending issues and actions taken.
• Also tasked to prepare the progress billing based on updated progress accomplishment including any additional or variation claims.
• Prepares technical presentation materials related to Company Profile and Prospective Projects.
• Prepares preliminary technical study on prospective projects for higher management reference including prequalification documents.
• Prepares technical requirements and conduct preliminary planning/scheduling for prospective projects.
• Performs other tasks assigned by immediate supervisor/manager.
• Projects participated and was awarded during my assignment at the Head Office in Jeddah are Princess Noura University- Automated People Mover (PNU-APM) in Riyadh, Nasseriyah Reception Palace Renovation in Riyadh, Atturaif Development Project of ADA in Riyadh, Jet Propulsion Center construction in Jeddah inside KAIA, Jeddah Airport East Interchange Roads, Tunnel & Railway Bridges construction as part of HHR project & the Riyadh Metro Project. Project management and scheduling tools used is Primavera P6 (Versions from releases 6.1, 6.2 and 7, 8.1 and 8.3).
• Also in-charge in the preparation of Tender Prequalification submittals and Technical proposals for each Tender submission from year 2001.

Maintenance Engineer (Planning & Control Works) à Brgy. Ilomavis, Kidapawan City
  • août 2003 à août 2008

Brgy. Ilomavis, Kidapawan City
Province of Cotabato
Nature of Business: Geothermal Energy
Position Held: Maintenance Engineer (Planning & Control Works)
Inclusive Dates: August 11, 2003 to August 2008
Scope of Works: To provide maintenance services to the M1 and M2 fluid collection and disposal system (FCDS) to ensure its safe and continuous operation and to prolong its useful life through the adoption of current
technology in the most efficient, timely and economical manner. The group is tasked to specifically
monitor and maintain 19 production and 7 reinjection wells, 3 units 20MWe and 1 unit 10 MWe capacity
separator vessels, around 20 km. fully insulated and cladded carbon steel pipeline, around 818 of assorted sizes of 1"Ø to 42"Ø line valves some are with valve platforms. Our group is also tasked to
implement first introduction to MGPF of Asset Management System Incorporating Risk Based Inspection
Methodology.
Duties and Responsibilities: • Prepares and updates weekly, monthly and yearly programs/accomplishments for FCRS
Maintenance and the FCRS Maintenance Foremen for implementation and scheduling.
• Ensures effective parts and materials management by monitoring, evaluating and updating condition of existing parts/materials and maintain the required stock levels of
inventory by timely preparation of material requisitions.
• Prepares work orders, materials takeoff and cost estimates for contract-out FCRS
maintenance activities.
• Supervises, monitors and processes billings on projects being undertaken by the FCRS
maintenance contractors
• Provides technical assistance to the Foremen and Supervisor in evaluating FCRS
Maintenance problems and formulation of solutions.
• Handles planning and control works, prepare contract documents, etc. for any project
related to the maintenance and improvement of existing facility such as construction of pipe bridges, pipeline modification involving civil/structural and mechanical works, etc.
• Conducts inspections and technical evaluations of contractors, spare parts, contracted- out works of the FCRS Maintenance section.
• Supervises field technicians in the scheduled corrosion and physical condition
monitoring of Pipeline components and recommends repair, replacement and/or modifications accordingly.
• Prepares short term and long term Operating Expenditure (OPEX) and Capital
Expenditure (CAPEX) budget proposals.
• Ensures compliance to safety standards.
• Performs other tasks which maybe assigned by immediate superior/manager.
Last Updated - February 5, 2014

Planning and Control Engineer à Philippine National Oil Company
  • Philippines
  • août 1995 à septembre 1999

• Handles all Civil/Structural and Mechanical/Piping matters requiring planning and control documentations vital to the MGPF operation.
• Handles quality control inspection works particularly affecting the Fluid Collection and Recycling System (FCRS) such as concreting works, structural/pipe welding works and non-destructive testing (NDT), etc.
• Review company estimates, work order requisition and other documents requiring signature/approval of the Resident Manager.
• Prepares and review annual operating and capital expenditure budget as directed by superior. Also monitor and control actual expenditure to avoid unnecessary budget overrun.
• Prepares Authority for Expenditure with back-up documents for higher management approval. Also ensure proper project implementation and actual financial/physical accomplishment shall be properly monitored & reported.
• Prepares and finalize bidding documents for contracted-out works.
• Prepares sketches and plans, bill of materials and estimates, and implementation program. Prepares of weekly, monthly and annual reports.
• Prepares needed presentation materials for visitors, and/or higher management as directed by superior. Also tasked to entertain project visitors in the absence of the Community Relations Officer.
• Designated by management as member of the MGPF Technical team for the introduction and implementation of Asset Management System Incorporating Risk Based Inspection Methodology (AMS-RBI) as a new model of inspection and maintenance of a geothermal installations of PNOC-EDC.

Planning and Estimating Engineer à Brgy. Ilomavis, Kidapawan City
  • juin 1997 à août 1999

Brgy. Ilomavis, Kidapawan City
Province of Cotabato
Nature of Business: Geothermal Energy
Position Held: Planning and Estimating Engineer
Inclusive Dates: 13 June 1997 to August 1999
Duties and Responsibilities: • Prepares and submit weekly and monthly situationer report to top management.
• Prepares presentation materials for all scheduled meetings on project updates.
• Prepares, reviews, finalize and monitor major projects requiring higher
management approval of an Authority for Expenditure (AFE)
• Ensures accurate project accomplishment monitoring and establish regular and accurate tracking.
• Conduct assessment on contractor's weekly progress accomplishment. Review and evaluate additional claims of contractor.
• Monitor and ensure completeness of construction drawings and project documents for filing.
• Evaluate field change request (FCRs) as to the effect in cost and schedule.
• Concurrent as Equipment Engineer of the section, which supervises, 2-Equipment
Clerks assigned to facilitate monitoring of light and heavy equipment including
service vehicle (rented or co. owned) . Also monitor the efficiency of all equipment
including fuel consumption supplied to rented equipment/vehicle and handle
dispatching of all service vehicle. Also handles related documentation for all
equipment.

Civil/ Structural Quality Control Inspector à Brgy. Ilomavis, Kidapawan City
  • novembre 1995 à avril 1997

Brgy. Ilomavis, Kidapawan City
Province of Cotabato
Nature of Business: Geothermal Energy
Position Held: Civil/ Structural Quality Control Inspector
Inclusive Dates: November 18, 1995 to April 15, 1997
Scope of Works: Construction and installation of Mindanao 1 Geothermal Project - Fluid Collection and
Disposal System (FCDS) pipeline and its appurtenances connecting from wellhead to power
plant which includes the following: • Site clearing and grubbing along pipe corridor including access road and drainage
system.
• Concreting of pipe anchor and supports, separator/silencer vessel foundations, rock
muffler, etc.
• Mechanical piping activity such as piping installation, erection of separator/silencer
vessels, valves, etc.
• Non-destructive testing (NDT) such as radiographic test (RT), ultrasonic test (UT),
magnetic particle test (MPT), visual test (VT) and post-weld heat treatment.
• Electrical power supply and instrumentation and control system.
• Insulation and cladding of pipeline (for thermal and personnel protection)
• Construction of utilities building (UB), power-out station (POS), steam quality
measurement (SQM) and flash plant technician sheds.
• Zero disposals piping system. Testing and commissioning

Duties and Responsibilities: • Monitor, inspect and issue permit to proceed on all concreting and structural steel
fabrication and installation works consistent with standard specs.
• Review completeness of all plans and drawings issued for construction of anticipate
facilitation of field change request from Construction Department.
• Prepares concrete design mix for testing and implementation.
• Conducts compaction testing on structural foundations, fresh concrete sampling and test result evaluation.
• Reviews route survey data to check elevation of pipeline consistent with construction
drawing.
• Also handle mechanical piping works such as dimensional checking of piping
materials, inspection during final pipe stringing, pipe joints fit-up and post welding, as directed by Superior. Monitor/mark pipe joints ready and/or completed NDT.
• Prepares timely documentations such as weekly/monthly reports and relevant issuance of QA/QC memorandum and permits.

Technical Engineer/ Estimator à L.S. Properties, Inc.
  • Philippines
  • août 1995 à novembre 1995

Scope of Works :
• Land Development and Housing Construction
Duties and Responsibilities :
• Prepares feasibility study and technical data with detailed back-up documents/computations to support project management analysis and evaluation.
• Prepares land development (sewerage/subdivision plan) to include detailed cost estimates per designed housing units.
• Prepares schedule and resource (i.e. materials, equipment and manpower) loading.
• Prepares contract or memorandum of agreement between contractors and LSPI.
• Tasked to coordinate with prospective municipalities regarding land area zoning information.
• Secures availability of vicinity maps from the assessor’s office of a prospective area or town and gather other relevant information vital in project planning.
• Ensures systematic filing of important documents.

Quantity Engineer à L. S. Sarmiento & Co., Inc. (LSSCI)
  • Philippines
  • août 1994 à janvier 1995

Second Rural Road Improvement Project (SRRIP)
Contract Package 62-C (DILG Project), Davao del Sur
Nature of Business: Horizontal/Vertical Construction
Position Held: Quantity Engineer
Inclusive Dates: January 11 to August 25, 1995
Scope of Works: • Construction of around 8 km. Portland Cement Concrete Pavement (PCCP)
• Construction of 1 unit double barrel box culvert, RCPC lines, line ditch canal and slope
protection works such as ripraping and stone masonry.
• Construction of a 45 meters concrete bridge in superelevation.
• Repair of existing asphalt pavement.
Duties and Responsibilities: • Assist Project Engineer in all technical matters related to the project.
• Responsible for all cost estimates, preparation of work program, operating expense
budget and project monitoring.
• Prepares and submit construction schedule such as bar chart & s-curve, PERT/ CPM, and manpower/equipment loading to project consultant for approval.
• Prepares and submit to management weekly and monthly reports.
• Prepares monthly billings and other claims complete with supporting documents.
• Responsible in monitoring of actual manpower, equipment and company owned
assets.
• Prepares change and/or extra work order proposals.
• Facilitates proper documentation needed during final inspection, acceptance, and turnover of project.
• Prepares final claim including price escalation proposal.
• Ensures proper filing of documents needed to be preserved for future reference.
Last Updated - February 5, 2014

Éducation

Master, Master in Business Administration
  • à Cor Jesu College, Digos City, Philippines
  • février 2008

GRADUATE: Masters of Business Administration (MBA), Completed 1st Year At Cor Jesu College, Digos City, Philippines (Y2007-08)

Baccalauréat, Bachelor of Science in Civil Engineering
  • à University of the Immaculate Conception
  • octobre 1993

(BSCE) University of the Immaculate Conception Bonifacio St., Davao City, Philippines (1990-October 1993)

Baccalauréat, Bachelor of Science in Civil Engineering
  • à Mindanao State University
  • avril 1990

COLLEGE: (BSCE) Mindanao State University, Marawi City, Philippines (1988-1990)

Etudes secondaires ou équivalent,
  • à Maryknoll High School of Lupon
  • janvier 1988

SECONDARY: Maryknoll High School of Lupon Lupon, Davao Oriental, Philippines (1984-1988)

Etudes secondaires ou équivalent, Elementary
  • à Piso Camp Elementary School
  • janvier 1984

ELEMENTARY: Piso Camp Elementary School Calubihan, Banaybanay, Davao Oriental, Philippines (1978-1984)

Specialties & Skills

Primavera P6
Project Management
Coordination
Estimating
MS Office tools
PLANNING
CONCRETE
COST ESTIMATES
DOCUMENTATION
ENGINEER
INSPECTION
PROPOSALS

Langues

Arabe
Débutant
Anglais
Expert

Adhésions

Project Management Institute (PMI) with I.D. No. 2017635, Arabian Gulf Chapter
  • Member
Rotary Club of Kidapawan East (Member)
  • Member

Formation et Diplômes

Employee Orientation on Policies and Geothermal Operation (Formation)
Institut de formation:
Philippine National Oil Company - EDC
Date de la formation:
July 2001
Basic and Use of Project Management Software (Formation)
Institut de formation:
Philippine National Oil Company - EDC
Date de la formation:
April 2006
Problem Solving and Decision Making (Formation)
Institut de formation:
Kepner Tregoe
Date de la formation:
November 2003
Project Management Workshop (Formation)
Institut de formation:
Kepner Tregoe
Date de la formation:
September 2001

Loisirs

  • Tennis
    Just for physical fitness.