Total des années d'expérience: 2 Années, 8 Mois
décembre 2016
A octobre 2016
Project Manager
à DRC
Lieu :
Ethiopie
Project : “Exploitation of methane gas from Kivu lake for the purpose of electricity production”.
Company : Hydrocarbon Ministry of
Company : Hydrocarbon Ministry of
février 2016
A août 2016
Project Management Coordinator
Project : " EPC FOR THE INSTALLATION OF A DESALINATION PLANT".
Client : LIFECO LIBYA
Scope of work :
To build a new Desalination Unit Reverse Osmosis in the industrial area of Marsa El Brega, Libya.
The new Desalination Unit Reverse Osmosis shall be used for 2 Ammonia and 2 Urea plants.
The project consists of the Desalination Unit Reverse Osmosis (also referred to as Water Treatment Plant), a Substation and a Local Technical Building (Ammonia Storage Area), and all the needed connections in-between.
Client : LIFECO LIBYA
Scope of work :
To build a new Desalination Unit Reverse Osmosis in the industrial area of Marsa El Brega, Libya.
The new Desalination Unit Reverse Osmosis shall be used for 2 Ammonia and 2 Urea plants.
The project consists of the Desalination Unit Reverse Osmosis (also referred to as Water Treatment Plant), a Substation and a Local Technical Building (Ammonia Storage Area), and all the needed connections in-between.
août 2014
A juin 2014
Project Management Coordinator
Project : “DETAILED DESIGN, PROCUREMENT, INSTALLATION, CONSTRUCTION & PRE-COMMISSIONING OF SIBA PIPELINES”.
Client : KEIL IRAQ
Function : Project Management assistance according PMBOK : Project initiation, cost and time controlling, scope management, contract and variation orders monitoring and Procurement follow up.
Scope of work :
- Dry gas export pipeline 20" ~44 Km (with PIG L&R)
- LPG export pipeline 4" ~44 Km (with PIG L&R)
- Condensate export pipeline 6" ~14 Km (with PIG L&R)
- Installation of the required FOC, TCP, PCP, BVS, SDV, MOVs and all related instrument bulk material.
Client : KEIL IRAQ
Function : Project Management assistance according PMBOK : Project initiation, cost and time controlling, scope management, contract and variation orders monitoring and Procurement follow up.
Scope of work :
- Dry gas export pipeline 20" ~44 Km (with PIG L&R)
- LPG export pipeline 4" ~44 Km (with PIG L&R)
- Condensate export pipeline 6" ~14 Km (with PIG L&R)
- Installation of the required FOC, TCP, PCP, BVS, SDV, MOVs and all related instrument bulk material.
septembre 2012
A janvier 2012
Project Management Coordinator
Project : Provision of EPCC for Diesel Storage Tank and Associated Work at FCP and GBC for PCIHBV Carigali Iraq Holding B.V.
Client : PETRONAS IRAQ
Function : Project Management Coordinator according PMI : Procurement; Risk; Progress and scope management. Total project control implemented to ensure in an efficient manner the completion of the project with respecting the deadlines.
Scope of work:
- Two Diesel Storage Tanks with a total net working capacity: 2000m3
- Three diesel skid tanks with a total net capacity: 105m3
- Diesel Transfer and loading Pumps with 100% redundancy capacity
- A diesel dispensing fuel pump station consisting of three dispensing units together with its shelter
- Drain Pit Submersible Pumps
- Firefighting system.
Client : PETRONAS IRAQ
Function : Project Management Coordinator according PMI : Procurement; Risk; Progress and scope management. Total project control implemented to ensure in an efficient manner the completion of the project with respecting the deadlines.
Scope of work:
- Two Diesel Storage Tanks with a total net working capacity: 2000m3
- Three diesel skid tanks with a total net capacity: 105m3
- Diesel Transfer and loading Pumps with 100% redundancy capacity
- A diesel dispensing fuel pump station consisting of three dispensing units together with its shelter
- Drain Pit Submersible Pumps
- Firefighting system.
août 2010
A décembre 2010
Project Manager
à EPPM
Lieu :
Arabie Saoudite
décembre 2008
A août 2010
Procurement Engineer
Project: Gas of torches collecting in ROM, Algeria:
Engineering endorsement, Procurement, construction supervision, Commissionning, Start-Up and Training.
Client : Groupement SONATRACH-AGIP/ENI ALGERIA.
Scope of work:
The work involved include all necessary facilities for gas recovering which is flared and to pump it to CTH unit.
This project facilities comprises:
•Multiphase pumps and accessories,
•Multiphase counting unit,
•Chemical Injection units,
•Drain and blowdown system,
•Service water and air system;
•Cabins substations : electrical and instrumentation rooms,
•Final camp Base,
•Firefighting system...
Engineering endorsement, Procurement, construction supervision, Commissionning, Start-Up and Training.
Client : Groupement SONATRACH-AGIP/ENI ALGERIA.
Scope of work:
The work involved include all necessary facilities for gas recovering which is flared and to pump it to CTH unit.
This project facilities comprises:
•Multiphase pumps and accessories,
•Multiphase counting unit,
•Chemical Injection units,
•Drain and blowdown system,
•Service water and air system;
•Cabins substations : electrical and instrumentation rooms,
•Final camp Base,
•Firefighting system...
Project Manager
Project : “Fire water network : Station and water tanks at Ohanet- In Aminas”.
Company : SONATRACH/RTI.
Scope of work :
The project involves the engineering, procurement and construction of a new complete fire protection system for the hydrocarbon storage tanks of SONATRACH as well as the decommissioning and dismantling of the existing fire water network.
Company : SONATRACH/RTI.
Scope of work :
The project involves the engineering, procurement and construction of a new complete fire protection system for the hydrocarbon storage tanks of SONATRACH as well as the decommissioning and dismantling of the existing fire water network.
Project
The design, manufacture and supply of fifty (50) sand traps, and the supply, installation and construction of twelve (12) methanol injection pumps and twelve jibs on (12) existing sand traps».
Client : SONATRACH ALGERIA
Scope of work :
- Engineering, procurement and fabrication of 50 sand traps including strainers and cyclones mounted on skids with all connecting accessories on gas-lift wells in Hassi Messaoud.
- Engineering, procurement and installation of 12 methanol injection skids including pneumatic pumps and accessories to be operating during severe winter conditions to eliminate hydrates from gas-lift.
Client : SONATRACH ALGERIA
Scope of work :
- Engineering, procurement and fabrication of 50 sand traps including strainers and cyclones mounted on skids with all connecting accessories on gas-lift wells in Hassi Messaoud.
- Engineering, procurement and installation of 12 methanol injection skids including pneumatic pumps and accessories to be operating during severe winter conditions to eliminate hydrates from gas-lift.