Total Years of Experience: 10 Years, 6 Months
December 2014
To April 2015
Technical Manager
at MAROGAB S.R.L.
Location :
Iraq - Erbil
▪ ensuring that a project runs smoothly and that the structure is completed on time and within budget;
▪ correcting any project deficiencies that affect production, quality and safety requirements before final evaluation and project reviews.
▪ supervising tendering procedures and putting together proposals;
▪ managing, supervising and visiting contractors on site and advising on civil engineering issues;
▪ communicating and liaising effectively with colleagues and architects, subcontractors, contracting civil engineers, consultants, co-workers and clients;
▪ Analyze survey reports, maps, drawings, blueprints, aerial photography, and other topographical or geologic data to plan projects.
▪ Inspect project sites to monitor progress and ensure conformance to design specifications and safety or sanitation standards
▪ Direct construction, operations, and maintenance activities at project site.
▪ Direct or participate in surveying to lay out installations and establish reference points, grades, and elevations to guide construction.
▪ correcting any project deficiencies that affect production, quality and safety requirements before final evaluation and project reviews.
▪ supervising tendering procedures and putting together proposals;
▪ managing, supervising and visiting contractors on site and advising on civil engineering issues;
▪ communicating and liaising effectively with colleagues and architects, subcontractors, contracting civil engineers, consultants, co-workers and clients;
▪ Analyze survey reports, maps, drawings, blueprints, aerial photography, and other topographical or geologic data to plan projects.
▪ Inspect project sites to monitor progress and ensure conformance to design specifications and safety or sanitation standards
▪ Direct construction, operations, and maintenance activities at project site.
▪ Direct or participate in surveying to lay out installations and establish reference points, grades, and elevations to guide construction.
December 2013
To November 2014
Civil engineer
at N.R.N. GROUP Ltd., Erbil (Iraq)
Location :
Iraq - Erbil
▪ responsible for the good performance of subcontractors
▪ working progress control on tunnel form construction ( Building of 35 floors)
▪ assessing the potential risks of specific projects, as well as undertaking risk management in specialist roles
▪ thinking both creatively and logically to resolve design and development problems
▪ managing change, as the client may change their mind about the design, and ensuring relevant parties are notified of changes in the project;
▪ leading teams of other engineers, perhaps from other organisations or firms
▪ compiling, checking and approving reports
▪ using computer-aided design (CAD) packages for designing projects;
▪ working progress control on tunnel form construction ( Building of 35 floors)
▪ assessing the potential risks of specific projects, as well as undertaking risk management in specialist roles
▪ thinking both creatively and logically to resolve design and development problems
▪ managing change, as the client may change their mind about the design, and ensuring relevant parties are notified of changes in the project;
▪ leading teams of other engineers, perhaps from other organisations or firms
▪ compiling, checking and approving reports
▪ using computer-aided design (CAD) packages for designing projects;
December 2012
To December 2013
Engineer's leader and Site Engineer
at DAAR ENGINEERING (USA Company), Samawah (Iraq)
Location :
Iraq - Baghdad
▪ engineer's leader in Samawah Bridges and Roads Construction Project ( Samawah bridge And Al mahdi Bridge)
▪ .site engineer in Samawah Bridges and Roads Construction Project ( Hilal bridge) .
▪ progress control for the certification of the subcontractors.
▪ maintenance on the site, arrangement of meetings with stakeholders for problem solving.
▪ negociations of changes with architects and consulting engineers.
▪ inspection of engineering elements (before and after construction) for compliance to drawings/specifications as required contract and Int. specifications.
▪ installation of Precast Pre-stressed Concrete Girders.
▪ record of daily activities and final accounts preparing of the project
▪ .site engineer in Samawah Bridges and Roads Construction Project ( Hilal bridge) .
▪ progress control for the certification of the subcontractors.
▪ maintenance on the site, arrangement of meetings with stakeholders for problem solving.
▪ negociations of changes with architects and consulting engineers.
▪ inspection of engineering elements (before and after construction) for compliance to drawings/specifications as required contract and Int. specifications.
▪ installation of Precast Pre-stressed Concrete Girders.
▪ record of daily activities and final accounts preparing of the project
January 2008
To November 2012
Site Manager and Executive Engineer
at ADNAN ALMOSAWI CO., Bagdad (Iraq)
Location :
Iraq - Baghdad
▪ site manger in project for water treatment 750 m3/h (chlorine basin, distribution chamber and three clarifies )
▪ installing statues made by the notable artist Mohamed Ghani
▪ installing bridge crane
▪ installing pipes
▪ geotechnical engineering
▪ Quantity survey
▪ fair face work using formwork for Doka com.
▪ casting concrete reinforcement
▪ reinforcement shop drawing
▪ installing statues made by the notable artist Mohamed Ghani
▪ installing bridge crane
▪ installing pipes
▪ geotechnical engineering
▪ Quantity survey
▪ fair face work using formwork for Doka com.
▪ casting concrete reinforcement
▪ reinforcement shop drawing
Share on Facebook
Share on Twitter
Share Via Email