Technical Manager
MAROGAB S.R.L.
مجموع سنوات الخبرة :7 years, 4 أشهر
▪ ensuring that a project runs smoothly and that the structure is completed on time and within budget;
▪ correcting any project deficiencies that affect production, quality and safety requirements before final evaluation and project reviews.
▪ supervising tendering procedures and putting together proposals;
▪ managing, supervising and visiting contractors on site and advising on civil engineering issues;
▪ communicating and liaising effectively with colleagues and architects, subcontractors, contracting civil engineers, consultants, co-workers and clients;
▪ Analyze survey reports, maps, drawings, blueprints, aerial photography, and other topographical or geologic data to plan projects.
▪ Inspect project sites to monitor progress and ensure conformance to design specifications and safety or sanitation standards
▪ Direct construction, operations, and maintenance activities at project site.
▪ Direct or participate in surveying to lay out installations and establish reference points, grades, and elevations to guide construction.
▪ responsible for the good performance of subcontractors
▪ working progress control on tunnel form construction ( Building of 35 floors)
▪ assessing the potential risks of specific projects, as well as undertaking risk management in specialist roles
▪ thinking both creatively and logically to resolve design and development problems
▪ managing change, as the client may change their mind about the design, and ensuring relevant parties are notified of changes in the project;
▪ leading teams of other engineers, perhaps from other organisations or firms
▪ compiling, checking and approving reports
▪ using computer-aided design (CAD) packages for designing projects;
▪ engineer's leader in Samawah Bridges and Roads Construction Project ( Samawah bridge And Al mahdi Bridge)
▪ .site engineer in Samawah Bridges and Roads Construction Project ( Hilal bridge) .
▪ progress control for the certification of the subcontractors.
▪ maintenance on the site, arrangement of meetings with stakeholders for problem solving.
▪ negociations of changes with architects and consulting engineers.
▪ inspection of engineering elements (before and after construction) for compliance to drawings/specifications as required contract and Int. specifications.
▪ installation of Precast Pre-stressed Concrete Girders.
▪ record of daily activities and final accounts preparing of the project
▪ site manger in project for water treatment 750 m3/h (chlorine basin, distribution chamber and three clarifies )
▪ installing statues made by the notable artist Mohamed Ghani
▪ installing bridge crane
▪ installing pipes
▪ geotechnical engineering
▪ Quantity survey
▪ fair face work using formwork for Doka com.
▪ casting concrete reinforcement
▪ reinforcement shop drawing