Project : SANTOS Wortel Field Development Detail Design Project
Location : Sampang Madura, East Java
Client : SANTOS (Sampang) LTD PTY
Project Description :
The Development plan for Wortel will involve the drilling and completion of two wells through a minimum Facility wellhead platform, which will be tied back to the existing Oyong wellhead platform with a 10” diameter pipeline. Wortel production will then flow directly into the Oyong gas export pipeline and delivered
To the Oyong onshore gas plant at Grati for processing and onward sale.
Responsibilities :
• Developed instrument Specification such as Specification for Instrument Cable, Specification for Instrument Calibration & Test Procedure, Specification for Loop Check Procedure, Specification for Process Control System, Specification for Emergency Shutdown System, Specification for Fire & Gas System, Specification for Allocation Meter for Production Barge.
• Generated preliminary instrument calculation for cable sizing, power consumption heat dissipation.
• Developed instrument data sheet for instrument devices such as pressure and level device including Pressure & Diff Pressure Transmitter, Displacer and Radar type level transmitter.
• Prepared a instrumentation deliverables including but not limited to instrument index, as data base for instrument I/O count for DCS, SIS and FGS, cause and effect and other deliverables.
Project : Minimized Shutdown Project
Location : Betara Complex Development, Onshore Jambi South Sumatera Indonesia
Client : Petrochina International Jabung LTD
Responsibilities:
• Developed detailed design engineering, these including developed various instrument data sheet such as, Control Valve, Actuated Ball Valve, Level Transmitter DP & Displacer Type, Pressure & DP Type Transmitter, Restriction Orifice Plate, and Pressure Safety Valve to ensure the correct data and other relevant information that vendors and users alike will clearly informative.
• Generated preliminary instrument calculation for online instrument such as, Control Valve, Pressure Safety Valve, and Restriction Orifice.
• Generated & Reviewed detail drawing for construction activities reference such as, Instrument Loop Diagram, Wiring & interconnection Diagram, Hook Up Diagram, Instrument Location Plan Lay Out.
• Performing to review of instrument Material Take Off (MTO) such as Instrument Bulk Material, Cable & Accessories, Cable Tray, JB, etc.
Project : Void Oil Tank Conversion to Oil Surge Tank Project
Location : Off Shore West Seno, East Borneo, Indonesia
Client : CHEVRON Makassar Limited
Project Description:
Chevron Makassar Limited (CML) is undertaking a study to modify the crude oil export facilities in the West Seno FPU. The produced crude oil from West Seno is exported via 12” export pipeline to Onshore Santan Terminal. The crude oil production from West Seno has decreased significantly from around 60000 BPD during initial production to around 5000 BPD.
CML is intending to operate the export pipeline batch wise in such a way that the minimum oil velocity in the export pipeline can be maintained. The required oil export facilities modifications are:
• Converting 2 void tanks to be surge oil tanks
• Modifying oil filling and transfer lines
• Modifying control and shut down systems for batch wise operation
Responsibilities:
• Prepared Instrument Control System (PCDAS & SSS) Modification Scope Of Work
• Developed & Reviewed instrument data sheet for instrument devices such as, Control Valve ( Self Regulator), Actuated Ball Valve (On-Off Valve), Level Transmitter Radar Type, Pressure & DP Type Transmitter, Pressure Gauge, Pressure Safety Valve
• Developed detail engineering and designed including Cause & Effect Diagram, preliminary calculation to instrument device within project scope such as calculation/sizing for Control Valve & Pressure Safety Valve.
- مجال الشركة:
- النفط والغاز
- الدور الوظيفي:
-
الهندسة