ياسر KHOKHAR, Electrical Foreman at King Khalid International Airport

ياسر KHOKHAR

Electrical Foreman at King Khalid International Airport

Al Qussie International

البلد
المملكة العربية السعودية
التعليم
بكالوريوس, Bachelor of Arts
الخبرة
22 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 5 أشهر

Electrical Foreman at King Khalid International Airport في Al Qussie International
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ فبراير 2015

 As Electrical Low Voltage Foreman look after all activity of Airport Operation and Maintenance of Transformer, Circuit Breaker, Batteries, Switchgears Low Voltage, Operation and Maintenance of 13.8KVA /480 Volts Sub Station. Estimation and Costing of electrical equipment of substation. Preparing total load calculation of Substation. Quality Control of manufacturing material. To ensures all work is completed in a safe, timely & cost. Effective manner and according to the planned schedules. Utilizing preventive maintenance procedures to reduce unscheduled downtime. Ensuring adherence to all applicable safety policies and procedures. Extensive knowledge of preventive and predictive maintenance methods.

Electrical Engineer في Wadi Mramer Group ( United Mining Company)
  • المملكة العربية السعودية - الرياض
  • أبريل 2011 إلى يونيو 2014

 As a Electrical Engineer and Plant Operation / Maintenance In charge look after all activity of the Plant .Like Production, Operation, Maintenance of Electrical and Mechanical Related Work, Preparing duty rooster, handle a team of subordinates. Complete the task of Production and Quality given by Chief Engineer.
 03 Years &02 Month worked. Supervise all electrical Erection. Commissioning. Repair. Maintenance and troubleshooting of all Plant electrical system and Generator work .Like HT.LT Motors. Power Transformer, Breakers, Contactor Relays, MCC Control, DCS and PLC system., Estimation for different E & I Proposal for different capacity and types of Grinding & Screening Plant, Erection & Commissioning of 04 Vertical Roller Mill, 02 Ball Mill Grinding Plants (Capacity each plant 400 &100 Tons per Day), Vertical Classifier, Buckt Elevator and Conveyor Belt, 02 GEN Set CAT Capacity 1000 KVA, 1800 KVA each. Installation & Erection of main Bus Bars, Breakers, Change over Switches and Control Systems. Power & Control cable lying and Terminations at both ends up to 04 Grinding Plants. Diagnosing & Rectification of Various fault during Operation of Plants. Maintenance of Caterpillar Diesel Engine (Alternator and Engine), Modification and Designing of Electrical System as per Requirements. Installation, Erection and Operation of AC Motors, Frequency Invertors 132 KW, 90 KW, 37 KW, 11KW & 7.5 KW, PLC Based automatic Plant. Minimize Electrical faults downtime virtually to Increased Production capacity of the Plant.

Assistant Engineer Electrical في Adam Sugar Mill
  • باكستان
  • يناير 2004 إلى ديسمبر 2009

06 Years Worked for Adam Sugar Mill Chishtian as a Assistant Engineer Power House in Combined Cycle Power plant (Power House)
 Responsible for all Types of Power House activity as well as a Working in Power House for maintaining, LV, MV Switchgear, LT, HT Transformer, Termination of Cables, Diesel Generator and Gas Turbine Control System, AVR, . Which include all types of Safeties, Sensors, Transmitters, Receivers, PLC system, Pressure gauge/Meters, Frequency meters, Power factor meters, and Synchronizing System for Gas Turbine & Diesel generators?
 As a Power House Assistant Engineer worked on 7MW and 4MW Gas Turbine and 450 KVA and 750 KVA Diesel Engine.
 Responsible for looking after loop checking, function checking and pre commissioning, commissioning Erection & start-up activity of Gas Turbine, Engines,
 Pre startup Activity's for each sub system and Carried out Operational Test of all Sub System Instruments with DCS and Emergency Shutdown Logic System.
 Project milestones and commissioning methodology for ready for start-up

High Skilled Grade Man في Pakistan Navy Dockyard
  • باكستان - كراتشي
  • يناير 2000 إلى ديسمبر 2003

04 Years Worked for Pakistan Navy Control Shop
 Worked for Pakistan Navy Ship Control System.
 Worked as per ISO 9001 and 9000 Standards
 Working on Engine Control System. Engine Safeties Controllable Pitch Propeller System. Ship Steering System. Tank level Indicator, Auto Voltage Regulator ( AVR) Fire Alarm System (Fire detector), Engine radar and telegraphs System and Portable Cranes ( Electrical and Electronics).
 Working in PN Control Shop be able to do work in Diesel Generator Control System DCS System (Distribution Control System of Navel Ships), AVR, Main Engine Control System. Which include all types of Safeties, Control Valves, Sensors, Transmitters, Receivers, PLC system, Pressure gauge/Meters, Frequency meters, Power factor meters, and Synchronizing System for diesel Generators.

الخلفية التعليمية

بكالوريوس, Bachelor of Arts
  • في Islamiya Univeristy
  • أغسطس 2006

English,International Relation.Islamic History,Persion.

دبلوم, Electrical Engineering
  • في Pakistan Navy Polytechnic Collage
  • ديسمبر 1999

Electrical Transmission and Distribution,AC Machines,Advance Electronics,Power Plants,Transformer,Application of Electrical Energy,Energy Conversion,DC Machines

الثانوية العامة أو ما يعادلها, Matric
  • في Govt High School Chak no 117/M Chishtian Pakistan
  • يوليو 1995

English, Math,Physics,Chemistry,Biology.

Specialties & Skills

Inspection
Electrical Installation
Power Plants
Plant Commissioning
Quality Inspection
Plant Erection
Computor

اللغات

الأوردو
متمرّس
الانجليزية
متوسط
العربية
متوسط

التدريب و الشهادات

Appreciation Letter from GM of United Mining Compnay (الشهادة)
تاريخ الدورة:
January 2014
صالحة لغاية:
January 9999

الهوايات

  • Learning about new Invention
    Now a days the field of Electrical Engineering much advanced than Previous.So now a days must touch with Technology.