CONSULTANT ELECTRICAL ENGINEER
AL-TERAZ KIKLOP
Total years of experience :11 years, 10 Months
Evaluates electrical systems, products, components, and applications by designing and conducting research programs; applying knowledge of electricity and materials.
Confirms system's and components' capabilities by designing testing methods; testing properties.
Develops electrical products by studying customer requirements; researching and testing manufacturing and assembly methods and materials.
Develops manufacturing processes by designing and modifying equipment for building and assembling electrical components; soliciting observations from operators.
Assures product quality by designing electrical testing methods; testing finished products and system capabilities.
Prepares product reports by collecting, analyzing, and summarizing information and trends.
Provides engineering information by answering questions and requests
Coca-Cola Multan Green Field Project, Electrical Operations Engineer
• The primary responsibility is to ensure compliance of construction works to the standards of quality defined in the Contract Documents including, but not limited to, drawings, specifications, bills of quantities (BoQ), RFI( Ready for inspections ).
• To oversee and manage the entire site construction with regard to quality and time
• Assure full compliance to the project objectives, policies, procedures and performance standard
• Day-to-day monitoring of quality and progress of works.
• Power Distribution Network of whole Plant
• Commissioning of Low and Medium Voltage Substations Siemens (Sivacon) Panels
• Power Cable laying for Low and Medium Voltage
• Installation of Cable Tray and Ladders
• Installation of 3000 KVA Transformers
• Installation of 2000 KVA Generators
• Installation of 500 KVA UPS
• Provision of Lighting Systems for whole plant
• Installation of CCTV System
• Installation of Fire Alarm and Detection System(Honeywell and Bosch)
• Passive Networking, Fiber system and Spicing.
• Underground, and within building cabling system,
• Power Factor Improvement and capacitor bank installation
• Single line Diagram
• As Build drawing and handover to client,
Resident Engineer (Operation and Management)
• Deployment and Management of system.
• Designs Economically Justified Modifications and improvements to the Existing Plant/Equipment
• Supports Maintenance and Operations teams during planned and Emergency Shutdowns
• Explored new technologies for improved performance, cost effectiveness and optimized designs
• Provide supports
installing, supporting and maintaining new systems
Infrastructure monitoring providing support.
Eensuring that all equipment complies with industry
Standards planning and implementing.
Installation and commissioning of safety switches of Belt Conveyor.
Installation and commissioning of Magnetic separator and belt weigher system.
Maintenance of transformers installed in HMC (11MVA)
with Major: Electrical machines, system design, control system design Embedded system design, Power calculation , Electrical system, Electrical system management. best project of the Year,
P.B.T.E (LAHORE) (2005-2008) S.S.C (Science) from Govt High school Pehure Hamlet