yasser lotfy mahmoud shiple shiple, مدير انتاج

yasser lotfy mahmoud shiple shiple

مدير انتاج

شركة الغندوره لصناعة البلاستيك /مجموعة شركات توشيبا شارب & جمجوم للصناعات الطبيه بجده

Location
Egypt
Education
Bachelor's degree, Engineering
Experience
17 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 4 Months

مدير انتاج at شركة الغندوره لصناعة البلاستيك /مجموعة شركات توشيبا شارب & جمجوم للصناعات الطبيه بجده
  • Egypt - Cairo
  • My current job since February 2007

I works in Toshiba - Sharp Elaraby from 2007 To 2013.
In 1st &2nd years I worked a production Engineer I learned and applied how to mange the production operation "Injection molding M/C"(Mold Change "Change Over"- Setting Programing"Robot &Mold"-Six Sigma- Lean Manufacturing.....And So on)? After that in 3rd &4th &5th years I have aim we want get on (Zero Accident -Zero Breakdown) and try to achieve that. I'm putted plan to Decrease or reduce the (Cost-Wastes-Change Over-Defects-Breakdown), Increase the (OEE-Availability-Productivity-Performance Rate), improve the Quality and prevent the (Accident-Problem).
In Jamjoom Medical.
1- Optimizing number of labors in all departments.
2- Increase Productivity to more than 70 %.
3- Production Process Improvement by Lean.
4- Eliminate the Wastes.
5- Action plan to achieve the productivity in time.
6- Improve the working environment.
7- Work on the production line.

Education

Bachelor's degree, Engineering
  • at Ain Shams Univ
  • October 2006
Bachelor's degree, Mechanical Power
  • at Ain Shams Univ
  • January 2006

I works in Toshiba – Sharp Elaraby from 2007 To 2013. In 1st &2nd years I worked a production Engineer I learned and applied how to mange the production operation "Injection molding M/C"(Mold Change "Change Over"- Setting Programing"Robot &Mold"-Six Sigma- Lean Manufacturing.....And So on)? After that in 3rd &4th &5th years I have aim we want get on (Zero Accident –Zero Breakdown) and try to achieve that. I'm putted plan to Decrease or reduce the (Cost-Wastes-Change Over-Defects-Breakdown), Increase the (OEE-Availability-Productivity-Performance Rate), improve the Quality and prevent the (Accident-Problem). In Jamjoom Medical. 1- Optimizing number of labors in all departments. 2- Increase Productivity to more than 70 %. 3- Production Process Improvement by Lean. 4- Eliminate the Wastes. 5- Action plan to achieve the productivity in time. 6- Improve the working environment. 7- Work on the production line.

Specialties & Skills

Lean Manufacturing
Process Improvement
INJECTION MOLDING
LEADERSHIP SKILLS
MOLDING MACHINE
PRESENTATION SKILLS
SELF MOTIVATED
الصبر- تحمل المسؤوليه - القياده

Languages

English
Expert
Arabic
Native Speaker

Training and Certifications

Managing the Quality Function Training course (Training)
Training Institute:
SGS
Date Attended:
January 2008
Duration:
32 hours
Training of Trainers (Training)
Training Institute:
Totality
Date Attended:
January 2012
Duration:
32 hours
Performance Measurement and Processes Improvement (Training)
Training Institute:
Quality Experts Group
Date Attended:
March 2009
Duration:
40 hours
EFQM (Training)
Training Institute:
Quality Experts Group
Date Attended:
March 2009
Duration:
32 hours
FMEA (Training)
Training Institute:
Quality Experts Group
Date Attended:
February 2009
Duration:
32 hours
Lean Manufacturing (Training)
Training Institute:
Gemba Research
Date Attended:
February 2009
Duration:
1600 hours
تويوتا - نيسان - أومرن - هوكس - توتو (Training)
Training Institute:
مركز تحديث الصناعه
Date Attended:
January 2009
Duration:
40 hours