yasser lotfy mahmoud shiple shiple, مدير انتاج

yasser lotfy mahmoud shiple shiple

مدير انتاج

شركة الغندوره لصناعة البلاستيك /مجموعة شركات توشيبا شارب & جمجوم للصناعات الطبيه بجده

Lieu
Egypte
Éducation
Baccalauréat, Engineering
Expérience
17 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :17 years, 4 Mois

مدير انتاج à شركة الغندوره لصناعة البلاستيك /مجموعة شركات توشيبا شارب & جمجوم للصناعات الطبيه بجده
  • Egypte - Le Caire
  • Je travaille ici depuis février 2007

I works in Toshiba - Sharp Elaraby from 2007 To 2013.
In 1st &2nd years I worked a production Engineer I learned and applied how to mange the production operation "Injection molding M/C"(Mold Change "Change Over"- Setting Programing"Robot &Mold"-Six Sigma- Lean Manufacturing.....And So on)? After that in 3rd &4th &5th years I have aim we want get on (Zero Accident -Zero Breakdown) and try to achieve that. I'm putted plan to Decrease or reduce the (Cost-Wastes-Change Over-Defects-Breakdown), Increase the (OEE-Availability-Productivity-Performance Rate), improve the Quality and prevent the (Accident-Problem).
In Jamjoom Medical.
1- Optimizing number of labors in all departments.
2- Increase Productivity to more than 70 %.
3- Production Process Improvement by Lean.
4- Eliminate the Wastes.
5- Action plan to achieve the productivity in time.
6- Improve the working environment.
7- Work on the production line.

Éducation

Baccalauréat, Engineering
  • à Ain Shams Univ
  • octobre 2006
Baccalauréat, Mechanical Power
  • à Ain Shams Univ
  • janvier 2006

I works in Toshiba – Sharp Elaraby from 2007 To 2013. In 1st &2nd years I worked a production Engineer I learned and applied how to mange the production operation "Injection molding M/C"(Mold Change "Change Over"- Setting Programing"Robot &Mold"-Six Sigma- Lean Manufacturing.....And So on)? After that in 3rd &4th &5th years I have aim we want get on (Zero Accident –Zero Breakdown) and try to achieve that. I'm putted plan to Decrease or reduce the (Cost-Wastes-Change Over-Defects-Breakdown), Increase the (OEE-Availability-Productivity-Performance Rate), improve the Quality and prevent the (Accident-Problem). In Jamjoom Medical. 1- Optimizing number of labors in all departments. 2- Increase Productivity to more than 70 %. 3- Production Process Improvement by Lean. 4- Eliminate the Wastes. 5- Action plan to achieve the productivity in time. 6- Improve the working environment. 7- Work on the production line.

Specialties & Skills

Lean Manufacturing
Process Improvement
INJECTION MOLDING
LEADERSHIP SKILLS
MOLDING MACHINE
PRESENTATION SKILLS
SELF MOTIVATED
الصبر- تحمل المسؤوليه - القياده

Langues

Anglais
Expert
Arabe
Langue Maternelle

Formation et Diplômes

Managing the Quality Function Training course (Formation)
Institut de formation:
SGS
Date de la formation:
January 2008
Durée:
32 heures
Training of Trainers (Formation)
Institut de formation:
Totality
Date de la formation:
January 2012
Durée:
32 heures
Performance Measurement and Processes Improvement (Formation)
Institut de formation:
Quality Experts Group
Date de la formation:
March 2009
Durée:
40 heures
EFQM (Formation)
Institut de formation:
Quality Experts Group
Date de la formation:
March 2009
Durée:
32 heures
FMEA (Formation)
Institut de formation:
Quality Experts Group
Date de la formation:
February 2009
Durée:
32 heures
Lean Manufacturing (Formation)
Institut de formation:
Gemba Research
Date de la formation:
February 2009
Durée:
1600 heures
تويوتا - نيسان - أومرن - هوكس - توتو (Formation)
Institut de formation:
مركز تحديث الصناعه
Date de la formation:
January 2009
Durée:
40 heures