Senior Electrical Engineer
RRC & Power line contracting Co.
مجموع سنوات الخبرة :15 years, 11 أشهر
- Power Lines Contracting Company (PLC), Technical & tendering Department Senior Engineer, Riyadh, Saudi Arabia, February 01, 2018 - until now.
- Renewable Resources consultancy (RRC), Projects & Technical Senior Engineer, Riyadh, Saudi Arabia, February 01, 2018 - until now.
• MEP & Infrastructure Electrical Senior Engineer, Design & execution.
• Senior Technical Design (HV, MV, Solar Plant, Street Lighting).
• MEP & Infrastructure projects design & shop drawing, MEP, HV, MV, LV, Solar, Street lighting, etc.
• MEP & Infrastructure projects cost estimation, LV, HV, MV, low current, internal lighting, Solar systems (small Scall & large scale) & Street lighting, etc.
• Senior technical manager for Solar Energy Department.
• Solar projects EPC contracting Department Senior Engineer.
• Project Senior Engineer - Aramco Projects - SPARK Project (Solar & Conventional Street Lighting).
• Manage Contract Details with client & identifying the modification of scope, cost and/or schedule based on cooperation with the construction contractor and/or other entities.
• Define projects scope, goals and deliverable that support goals.
• Oversee the project execution with complete coordination with all relevant departments.
• Coordinate with vendors and installation contractors for feasibility and execution of proposed projects.
• Monitor the execute projects and evaluate/report back for the results.
• Conduct training for engineering team.
• Provide technical support for the internal company departments, customers and partners in the regions and other countries remotely or through business trips.
• Providing Consultancy service & energy audit studies for customer (Design, Studies, shop drawing, Method Statement, ITP, etc.)
• Manage Equipment, Material & tools purchase request.
• Providing technical proposals of renewable energy for small and Large scale projects.
• Managing Joint Venture with international Companies.
UCCC &, Riyadh Metro Project-Line 1, Riyadh, Saudi Arabia.
MEP Manager - RML1 - BACS- Station 1A2.
•Managing Shop drawing for MEP Activity.
•Managing MEP time schedule.
•Managing Project HR plan.
•Managing Material Supply & Material Supply Plan.
•Contact the suppliers & arranging Material Submittals.
•Following site activity as per time schedule.
•Making sure that all activity running as per contract conditions.
•Making sure that All site activity running under QA/QC plan.
•Following Client Requirements.
•Execution of Construction Method Statement.
•Coordinate between site & head office.
- Responsible of Managing All Electrical Activity, HV, MV, LV & Street Lighting.
- Responsible of the Electrical Activity Work Plane.
- Site Survey for the Design of LV 13.8KV & 33KV, HV 132KV & Overhead Line 380KV.
- Design For MV & HV Cables, & MV Substation As Per SCECO SPECS.
- Managing Budget for Electrical Activity ( Cost, Selling Price ).
- Following Material Supplying ( Cable’s, Substations … etc. )
- Electrical Activity & Budget Calculation & Contract’s Managing.
- Managing Over 150 Million SAR Subcontractor Contract’s, Invoices, claims, payment … etc.
- Design of Traffic Plane & submission in order to get approval’s.
- Following site Activity, Mobilization, Equipment, Engineering, laborers, Excavation, Safety…etc.
- Coordination Consultant (RMTC) & SCECO for Approval.
- Coordination With Traffic Department, Municipality, AMANA, NGSA, SCECO.
- Submission of Claim, Invoices, and Revising of Project BOQ.
- Submission Of IR and handover of the Completed Works.
• Responsible of too many projects, Hospitals, Data Centers, University Building, Infrastructure.
• Correction and Redesign of power single line diagram.
• Submit Technical Presentation & Training For Consultant & Contractor.
• Site Survey & Problem Troubleshooting.
• Study Project’s SPECS & SLD and Following it With Estimation Department.
• Coordination Responsibility Between Customer & Our Factory, Technically & Commercially.
• Making Coordination Study & Compliance Statement For Projects.
• Revise Technical Submittal, Commercial Offer.
• Preparing Technical Submittal & Following Approval with consultant.
• Shop Drawing Revising, Auditing before production.
Electrical Project Engineer, Al-Hazim Club & Al Ekhdood Club & King Abdullah Sport City Projects.
Replace the existing mast with new one.
Responsibility:
• Project Manager and site manager.
• Site Mobilization.
• Load Calculation, Voltage Drop, Cable Selection Short Circuit Calculation & Electrical Design.
• Procurement for the 3-project with all Connected Responsibility.
• Follow the submittal and the approvals with the consultant & Owner.
• Arrange the work & Monitoring it in the sites.
Project Engineer
• Revise Project’s SPECS & SLD and Forwarding Summary to the Estimation
• Preparing Technical Submittal & Following Approval with consultant, Owner & Price Negotiation.
• Short Circuit Study by Using Ecodial ( Schneider )
• Shop Drawing Revising & Following Manufacturing process.
• Project Time management & finalizing.
Al Dhahry Group, General Contractors Branch, SAPTCO New Headquarter Project, Riyadh, Saudi Arabia. http://www.al-dhahry-group.com/
https://maps.google.com/?ll=24.499079, 46.793647&spn=0.005536, 0.010568&t=h&z=17
November 18, 2008 - June 10, 2010
The Project Consist of Seven Building. As A Workshops For Buss Maintenance Purposes And Fuel Station & this Building Designed Based on High Standard & Latest Technology.
SAPTCO Project Divided into Two Stage:
1) Infrastructure Project ( Stage 1 ): Witch Contained, Asphalt Work, Street Lighting, & Electrical Supply Feeding.
My Responsibility In SAPTCO Infrastructure Project Include:
• Electrical Site Engineer.
• Coordinator between Contractor & Consultant, & Getting Materials Approval Responsibility.
• Insure Works Completion Within Cost and Schedules.
• Organize All Electrical Activities In The Site, & Coordinating Between Other Engineering In Site.
• 13.8KV Metal Enclosed Switchgear Implementation.
• 1MVA/13.8KV/380-220V 3φ Out Door Compact Substation With MERLIN GERIN RMU & L.B.S 360A SF6 CB & 1600A Air Blast Draw Out Motorized Type CB Installation.
• Medium Voltage, Voltage Drop Calculation, Choosing Cable Size, Specification & Length With least Cost To Insure Minimum Voltage Drop.
• 3-Core 300 mm2 Embedded Medium Voltage Cable Installation, & Applying Megger & Hipot Test.
• Medium Voltage Cabling Work & Jointing MV & LV XLPE Cable (300mm2 - 6 mm2)
2) Electromechanical Work ( Stage 2 ): Witch Include Low Voltage, Low Current & Air-conditioning Work Inside Buildings.
Working in SAPTCO Project Gave Me a Great Chance to Discover a New Experience in Many Fields:
• Low Voltage, Voltage Drop Calculation, Load Distribution & Load Calculation And Studies.
• Conduits, Wiring Works & Distribution Panels Installation Along With Cable Tray Establish.
• Out Door Compact Substations implementation.
• UPS-Uninterrupted Power Supply Systems Design Dry Type Transformers 380/220-110 Installation.
• Conventional, Addressable Fire Alarm & Smoke Detector Systems.
• Lighting Studies & Lighting Fixtures.
• Voice and Data Structure Cable Network.
• Civil & Mechanical Work Background.
Maintenance of electrical power equipments
2) Operation of the combined cycle power station.
3) Attending the erection of a part of a new unit.
4) I gained within team to maintain one of the generating unit (first stage overhaul and second stage) for compressor and chamber and overall check on the generator and transformers
Rating GOOD