Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
yazan blasi, Section Engineer ~ Finishing Civil

yazan blasi

Section Engineer ~ Finishing Civil·Consolidated Contractors Company (CCC )

Qatar

Bachelor's degree, Civil engineering

Work experience

Total years of experience: 19 years, 1 months

Section Engineer ~ Finishing Civil

June 2015 - Present

Consolidated Contractors Company (CCC )

Doha, Qatar

June 2015 - Present

As a responsible section engineer in Sidra Medical & Research Hospital Center follow up all finishing works as, concrete self leveling, Linoleum floor covering, Gypsum wall partitions, wooden & Gypsum false ceiling, ceramic tiles, windows glass cladding, carpeting, epoxy flooring, Corian works, mill works, doors fixing, and many other finishing activities related to hospitals, with full coordination with all MEP departments.

Company industry:
Civil Engineering
Job role:
Management

Section engineer -high rise buildings

June 2012 - May 2015

Consolidated Contractors Company (CCC )

Algiers, Algeria

June 2012 - May 2015

In FORUM EL-DJAZAIR, ZONE 1 - RESIDENTIAL BUILDINGS project which include Construction of 4 residential high rise buildings (124 apartments), each comprising 3 basements, ground, mezzanine and 22 floors and terrace.
Built-up area - 211, 960m2 with total height of 100 M, the client is EMIRAL, the value of the project around 1 billion dollar. I am the responsible section engineer for tower 1, follow up all the construction works from the excavation, raft foundation casting with 8000 M3, walls & slabs casting, Up to 22 floor level concrete casting with some finishing works.

Company industry:
Civil Engineering
Job role:
Management

Site engineer -civil

April 2011 - April 2012

Consolidated contractors company (CCC )

Abu Dhabi, United Arab Emirates

April 2011 - April 2012

In Al-Shek Kalefa presidential palace project which include Construction of 3 wings of the President, Vice President and Crown Prince, and service tunnel. Construction of technical buildings with a total built-up area of 28, 815m2, the client is the Ministry of Presidential Affairs with value of 500 million dollar, I was Supervised the crown prince wing in the project with total area of(8000 m2), from piles, pile caps, slabs on grade, & top slabs in a high quality standers & a tight schedule.

Company industry:
Civil Engineering
Job role:
Civil Engineering

Utilities & roads engineer

October 2009 - February 2011

Consolidated contractor company (CCC )

Muscat, Oman

October 2009 - February 2011

Supervised (1) Concrete Water Tank (diameter=37M, Height=5.3M), & (19) Box Culvert-(500 meter length), & follow up 600DI potable water pipe line (Length=2.6 KM) with sub-contractor, in the Development of Muscat International Airport Project -DMIA Phase(3), by One Billion U$ Dollar, from Surcharge & stone columns, Varies Dewatering Systems by well points and submersible pumps, Lagoons Establishing, base walls top slabs & cutoff walls casting for the culverts, water proofing, rip rap, concrete boulders & gabion mattresses works. Pipe fixing & manholes casting & fittings installation for DI600 water pipe line.

Company industry:
Civil Engineering
Job role:
Engineering

Bridges & Roads Engineer

November 2008 - October 2009

Consolidated Contractors Company (CCC)

Oman

November 2008 - October 2009

After finishing the camp mobilization activities, I Supervised (13) Box Culvert, & (3) Bridges-(650 meter length) in Assela~ Ras Al-Had Rehabilitation Road, from Plat Form, Pilling, pilling load test, Pier Walls, Pier Columns, Dewatering System, Pier Caps, Cables Pre-Stressed Girders Casting & Erecting by Cranes, Diaphragms, Deck Slabs, Approach Slabs, Wing Walls, Side Barriers & Curbstone, precast slab panels, Interlocking Tiles, Water Proofing, water drainage system, ducts fixing, steel handrail fixing, Expansion Joint fixing, Asphalt Laying, Slop Protection By Armour Rock & Riprap, Road Marking, Guardrail and Sign Boards fixing, & Concrete Repair and Panting works for all the Bridges.

Company industry:
Construction & Building
Job role:
Engineering

Marine Engineer

June 2008 - November 2008

Consolidated Contractors Company (CCC)

Muscat, Oman

June 2008 - November 2008

As a Jr. Engineer in C.C.C. I work in several departments to know the company system, like: Survey, Planning, Quantity Survey & Contracts, Engineering, Cost Control & Estimation, Quality Control, Documents Control, & finally I work in the site as a marine site engineer supervised many of Marine works in Salam Resort and Spa-Yiti-Oman, phase(1) dredging, reclamation, and marines works, Such as Marina Beach, Beach Groyne, Marina Entrance Breakwater, Marina Headland Breakwater, Quay wall, and Dredging works. Which included follow up core filling, bunds establishing, Geotextile placing, Armour rock placing under and above water, beach sand filling, dredging by ship dredger, under water excavation by cranes and excavators, filling core materials under water with maintaining the required level using level frames, Block placing under water with a crow of scuba-divers, supervised a team of divers for block placing and under water works, and all proper coordination between precast yard, quarry, PMV, and site requirements.

Company industry:
Construction & Building
Job role:
Engineering

Structural site Engineer

June 2007 - June 2008

CAD International Constructions Company (CICC)

Amman, Jordan

June 2007 - June 2008

Follow up and supervised many of Constructions works in King Abdullah II Special Operation Training Center (KASOTC), like four Storage Facility, Clinic, Masjed, FF3, 8-Substations, FE4B, & two Office Complex from Excavations, foundations, piers, columns, beams, stairs, and slabs. Also follow up water proofing, isolation materials, CMU Blocks on American standers, plastering, tiling, concrete trawling, Painting, and concrete repair works. Paper works and quantity calculations for all site requirements.

Company industry:
Construction & Building
Job role:
Civil Engineering

Design Engineer

June 2006 - July 2006

RO Design Center ( )

Jordan

June 2006 - July 2006

Worked part time as a trainee structural design engineer, I have an idea about designing and analysis the slabs, beams, columns, stairs, and foundations by the latest structural design software's. And I have excellent knowledge in AutoCAD.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Materials Engineer

September 2005 - September 2005

Arab Center For Engineering Studies (Aces)

Jordan

September 2005 - September 2005

As a trainee materials engineer in laboratory: Worked on Asphalt, Aggregate, Tiles, Blocks, Rocks, Soil, Steel, Waste Water, and all of the Concrete Tests.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Education

University of Jordan

September 2007

September 2007

Bachelor's degree, Civil engineering

Jordan

GPA (point): 2.75 out of 4

GPA (point): 2.75 out of 4

Civil engineering

Skills

Time Management
Expert
Time Management
Expert
Leadership
Expert
Leadership
Expert
Primavera
Expert
Primavera
Expert
AutoCAD
Expert
AutoCAD
Expert
Project Management
Expert
Project Management
Expert
5. Excellent with most engineering's software's i.e. Matlab, AutoCAD, and excellent knowledge in Mic
Intermediate
5. Excellent with most engineering's software's i.e. Matlab, AutoCAD, and excellent knowledge in Mic
Intermediate
Risk & Hazard assessment at site & work places
Intermediate
Risk & Hazard assessment at site & work places
Intermediate
Problems solving & design making skills
Expert
Problems solving & design making skills
Expert
Communication Skills
Expert
Communication Skills
Expert
Technical report writing skills
Intermediate
Technical report writing skills
Intermediate
Stress management
Expert
Stress management
Expert
Work under pressure
Expert
Work under pressure
Expert
Team work
Expert
Team work
Expert
Project Management
Expert
Project Management
Expert
AutoCAD
Expert
AutoCAD
Expert
Primavera
Expert
Primavera
Expert
Leadership
Expert
Leadership
Expert
Time Management
Expert
Time Management
Expert

Languages

Arabic

Expert

English

Intermediate

French

Beginner

Urdu

Beginner

Memberships

Jordanian engineers association

Membership

June 2008

Training and Certifications

Training
Completion Database Management & Project Handover System (ATLAS),
CCC Training Center-Muscat,
Jan 2010
Autocad 2D
Ecc
Jan 2004
Total Quality Management for the projects,
CCC Training Center-Muscat,
Oct 2010
R.M.D Formworks Design and analysis ,
CCC Training Center-Abu Dhabi,
Sep 2011
Form work Design and concrete problems
in CCC Training Center-Abu Dhabi
Oct 2011
Quantity Survey Course,
OVES-Jordan,
Dec 2007

Hobbies and interests

Sports