الخبرات
20 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :20 years, 1 أشهر

Deputy Site Manager في Al-Baraka Oil Feilds Services SAOC - Oman PDO
  • عمان - هيماء
  • أغسطس 2018 إلى مايو 2021

AREAS OF EXPERTISE

Civil Construction
Project Management
Quality Assurance & Quality Control
Operation & Maintenance
Client Relationship
Site Selection & Layout
Site Supervision
Progress Vs. Plan Tracking
Methods Statement
Pre-commissioning & Commissioning
Team Leadership & Management

PROFESSIONAL SYNOPSIS

•A keen strategist, planner and implementer with expertise in organizing & devising construction management strategies to deliver high end projects and thereby contributing for enhancing overall organizational growth and sustained profitability.
•Demonstrated excellence in managing & handling finance, human resource, business development, administration & operational departments and focusing on financial and strategic growth of organization.
•Highly skilled in executing the Project planning & scheduling including material, equipment & manpower planning and Micro scheduling of activities into weighted steps for effective progress tracking.
•Comfortable working with people of all levels and having an excellent practical approach to solve problems and develop business processes; also skilled in analyzing processes, identifying areas of improvement and improving/re-designing business processes for enhancing customer service delivery.
•Outstanding skills in interacting with clients, understanding their requirements and accordingly providing customized solutions/services, thereby maintaining complete client satisfaction and creating repeat business opportunities.
PRINCIPAL ACCOUNTABILITIES:
•Site Safety including personnel, contractors and other onsite personnel
•Construction Quality regarding the Works, Review contractor submittals including equipment, Work Plans and QA/QC Plans
•Management of all Construction resources in their various activities; Constructability in design, Scheduling of Construction, Yards suitability, Resource planning
•Risk identification and Mitigation, Construction cost estimating, Monitor proper documentation of construction activities
•Monthly construction reports prepared by field staff, Interface with MISC clients, Class, Regulatory Bodies and other stakeholders
•Manage Contractors and onsite personnel for compliance with project designs, specifications and contract requirements throughout construction

Construction Manager في SunEdison Solar Energy
  • الهند - تشيناي
  • يوليو 2015 إلى يوليو 2018

Project : 44.8MW Dominicus Project, 36 MW Green Flash Project, Aditi, Bheem & Suryashakti-100MW Project

Sr. Construction Engineer في Brunel India Private Limited
  • الهند
  • أكتوبر 2012 إلى يونيو 2015

Project : M204- Ashiwarya Well Pad Development

Construction Manager في UHDE India Pvt. Ltd. (Thyssen Krupp Uhde German Company)
  • الهند
  • أغسطس 2011 إلى سبتمبر 2012

Project : 8.75 TPH Hydrogen + 16000 NM3/ On BOO Basis for Pradip Refinery

Construction Engineer في Worley Parsons Arabian Industries
  • عمان
  • يونيو 2009 إلى مايو 2011

Key Responsibilities:

o Implemented and monitor WPAI & PDO Quality Standards and Specifications as per ASTM/BS code based.
o Inside Nimr gathering station and OHL line Black top road- 142KM, Liaise with Construction Supervisors on day to day issues.
o To attend daily/weekly progress meetings and generate status reports as requested.
o Review and acceptance of final mechanical system handover documentation on behalf of the project
o Responsible for overall control of Project / Site QC matters, both during pre-order and post order stages until successful commissioning and final handover to client Adhered to strong emphasis for implementation of Corporate Quality Policy and Corporate Integrated Management System (IMS).
o Responsible for maintaining the quality of ready-mix concrete to strictly comply with client’s requirement.
o Executed & Controlled Quality aspects of LCC subcontractors and ensured high level of Quality performance at site.
o Ensured compliance to WPAI Contract Quality Plan and Liaised with client quality & construction personnel.
o Provided Quality control & inspection of Concrete works and Pre-casting activities for different type of works.
o Supervised the excavation & backfilling works of trenches for LV, HV & Inst Cable and block works for different activities.
o Used judgment in establishing appropriate Controls beyond Quality management system to specific project and activity.

o Significant Achievements:
o Main Control Room Building construction, 05 No's of Substations (Each 11 kiva) Switch yard, Bay extension works.
o Successfully commissioned multiple projects at Nimr Field at South Oman PDO Projects, well ahead of schedule:
o Construction of 36” Bulk Header flow line, gas line and pump replacement
o Modification of Tank base plate which involved removal & replacement of foundations, foundation repairing & grouting of Tank Base plate & structural foundation inside NIMR Production station
o Control room shutdown for 56Hrs which was Biggest shut Down in NIMR (Oman)
o PAIP-339N-construction of Drain Pit for Shut down
o PAIP-179-132 KV. Breaker replacement at various locations Black Top Road resheeting works completed successfully
o Also worked PAIP- 182- Flow line rationalization project (GRE LINE 4’’& 6’’). PAIP-156-Al Noor MFM Project work (Multifunction Power&. Energy Monitor with Modbus RTU Protocol). PAIP-163-T4818 De-bottle necking Project (Petroleum Refinery Crude Distillation Unit).
o Cellar Pits, Waste water pit, burn pits, RCC/Duct bank/Manhole Trenches, RMU, electrical transformer foundations, High security fencing, Equipment, sleeper, pipe support RTU, Scada JBS, Light pole, instrument/Electrical/Telecom/Scada foundations. Foundation completion, handover, punch list, pre-commissioning and commissioning.
o Cross country pipeline for all the projects of 36” Bulk Header flow line for MINR 'A, B, C' to Nir guttering station-total 46km

Construction Engineer في Larsen & Toubro - United Arab Emirates
  • الهند
  • مايو 2006 إلى مايو 2009

Key Responsibilities:
o Coordinated with QA/QC and QS (Client) regarding quality matters and checked the records for legibility, readability, Traceability/arrangement.
o Planned and reviewed project work and took all safety measures as per risk assessment plan.
o Review and acceptance of final mechanical system handover documentation on behalf of the project
o Coordinated and monitored activities of subcontractors and suppliers. Liaise with Construction Supervisors on day-to-day issues.
o To attend daily/weekly progress meetings and generate status reports as requested.
o Provided input on jobsite logistics, plant layout, equipment and manpower utilization.
o Assisted in establishing and maintaining good safety and security practices for the entire project.
o Assisted Project Engineer in scheduling and expediting delivery of materials and equipment for the job site.
o Transformer foundations, High security fencing, foundations. Foundation completion, handover, punch list, pre-commissioning and commissioning.

Significant Achievements:

o The office development consists of two intersecting elliptically shaped towers on a sculptured 3-storey podium. The taller tower is 360m high and has 65 stored above ground and the smaller tower is 240 m high with 54 stored above ground. There are 4 basement levels containing car parks and plant and equipment rooms

Construction Engineer في Awdiat Al- Wasta Trade & Constructions
  • عمان
  • مايو 2004 إلى أبريل 2006

Key Responsibilities:

o Ensured all changes to specifications, work scope and drawings are properly documented
o Defined clear roles & responsibilities and deliverable requirements in terms of both scope and contract management.
o Performing site visits and day to day monitoring of progress, quality & procedures. Preparing Project Quality plan (PQP), Inspection & test plans and related formats for necessary inspections & tests as per customer spec and codes.
o Complying QMS & Quality objectives: Complying with PQP WP 01 Inspection & testing and control of non-conforming products -PQP WP 17.
o Gathered the supply sources of various materials & maintained the record of the sources and submitted to client on monthly basis. Responsible for maintaining the quality of concrete cube test and getting it certified by client. Liaise with Construction Supervisors on day to day issues.
o Review and acceptance of final mechanical system handover documentation on behalf of the project
o Maintained quality procedures & records in accordance with quality management system.
o Main Control room building, 07 No's of Substations (Each 11 kiva) Switch yard, Bay extension works.
o Cellar Pits, Waste water pit, burn pits, RCC/Duct bank/Manhole Trenches, RMU, electrical transformer foundations, High security fencing, Equipment, sleeper, pipe support RTU, Scada JBS, Light pole, instrument/Electrical/Telecom/Scada foundations. foundation completion, handover, punch list, pre-commissioning and commissioning
o Executed Civil project works as per engineering drawings and handed over the site to Mechanical, instrument, electrical and pre- commission group.

Civil Site Engineer في Afcons Infrastructure Pvt Ltd
  • الهند
  • مارس 2001 إلى أبريل 2004

o Maintaining the Project test records as per ISO 9001 and customer specifications Liaise with Construction Supervisors on day to day issues.
o Assist in preparing the required progress reports Manage the activities of subcontractors
o Review and acceptance of final mechanical system handover documentation on behalf of the project.
o Assist in preparing construction schedules & Bar Banding schedules, monitor progress against established schedules.
o Personally, ensuring the identification of site problems liaising with the project of work with safety standards.
o Work with the Project Manager to ensure any spend outside of the approved budget is monitored and controlled.
o Manage the work at the project site and coordinate between subcontractors to ensure execution of project phases on time.
o Identify manpower, equipment needs required for completion of work. Develop & monitor the implementation of quality control programs.
o Review subcontractors and suppliers’ invoices and submit to the Project Manager for approval On-going evaluation of construction methods and continuous improvement implementation.
o Construction of Multi selective valve Flat forms foundation, Pump foundations (Depth of Foundation 4mts)
o Construction of Transformer foundations inside gathering station and control room for upgrading.
o The work comprised Construction of two nos. of cryogenic tank for LNG storage. Each tank was supported on 578 nos. of 1000 mm die bored cast-in-situ concrete piles of average depth of 36m. Base slab was 83.80m die & 1000 mm thick. Concrete walls were 81m die, 800mm thick & 34.35m height.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Mahamaya Technical UniversityMTU CAMPUS
  • يونيو 2000

’s Degree in

الثانوية العامة أو ما يعادلها, Civil Engineering
  • في Board Of intermediate Education Narayana Juniour College
  • يناير 1996

-

الثانوية العامة أو ما يعادلها, Civil Engineering
  • في Board of Secondary Education Siddhartha Public School
  • يناير 1993

-

Specialties & Skills

Inspection
Quality Management
Testing
Materials
An active listener with the ability to focus on customer requirements
Having Sound supervisory and organizational skills with good interpersonal skills.DOCUMENTATION
Motivating the contractor on the importance of safety. Familiar with ISO and OHSAS standards.
M S office
Priavera p6
M S Project
project Monitoring skills

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الهندية
متمرّس

التدريب و الشهادات

Lead Auditor (الشهادة)
تاريخ الدورة:
March 2018
QMS Foundation & Internal QMS Auditor (الشهادة)
تاريخ الدورة:
January 2013
PMP certified (ID- 3190833) with above target Scoring passing (الشهادة)
تاريخ الدورة:
November 2021
صالحة لغاية:
November 2024