LAND SURVEYOR
RAMSIS ENGINEERING
Total years of experience :8 years, 7 Months
setting out the line for pipe lines using survey equipment total station & gps. giving the design level for carrying out of foundation work for pipe support, test separator support. topography survey to purposed design level for well pad construction before drilling. preparing asbuilt drawing of pipe lines using by autocad. attending the weekly progress meeting with tatweer petroleum ( client ).
working in ALKOMED as a Land Surveyor doing Preliminary, Topographic and Cadastral surveys for planning, route designing, execution, as built surveys & earthwork quantity calculations for all underground 66 KV Transmission and 11kV distribution cable and other utility works.
➢ To follow daily work program for timely and smooth execution of assigned job
➢ To study the scheme drawing for understanding and better execution of job.
➢ To carry out detail Topographic and Cadastral surveys in three dimensional systems.
➢ Carrying out Trial hole survey works for underground utilities
➢ Preparation of sectional drawings
➢ Underground cable route designing with the help of data collected from Topographic and trial hole survey works
➢ Responsible for carrying out Traverse survey for fixing new Bench Marks.
➢ Preparing profile drawings, inspection and implementation of HDD jobs.
➢ Carrying out asbuilt survey works for laid underground utilities in all regards.
➢ Managing DATA transfer from GPS and Total station for quick job execution.
➢ Having weekly safety tool box talk for safe working environment.
➢ From April 2009 to April 2011
Company: Khalid Electrical & Mechanical Company (KEMCO) Doha-Qatar, Reputed Leading Electro-mechanical Contracting Company in Doha, State of Qatar.
Designation: LAND SURVEYOR
PROJECT ACCOMPLISHMENT
I. Project: KAHRAMAA
Electricity Power cable project, Doha, Qatar
Qatar Transmission System Expansion Phase VI
Worked in KEMCO as an approved Surveyor cum Draughtsman by KAHRAMAA (Qatar General Electricity & Water Corporation) for all KAHRAMAA Projects and handled Level, theodolite & total station instruments (Leica 303, Leica 405, Nikon 562 & Nikon 362 Series)
As a Surveyor did preliminary, topographic and cadastral surveys for planning, route designing & execution of work with asbuilts for 66KV, 132KV & 220 KV underground Cables for Mitsubishi-Japan & Marubeni-Japan respectively.
Carried out route survey and design works for electricity Over Head Lines.
Preparation of drawings with as built records using AUTOCAD in GIS.
• Conducted and supervised research of site records related to construction.
• Conducted and supervised field surveys associated with land surveys.
• Detail survey of construction work in three dimensional systems.
• Performed and supervised various engineering functions related to civil engineering construction and design.
• Monitored and pro-actively identified and corrected technical, schedule and financial issues through effective communication with the Project Manager and other management staff.
• Participated in preparation of engineering services proposals, including the calculation/estimation of time schedules and costs of the proposed work.
• Independently communicated on technical matters with the client.
• Conducted and supervised research of site records related to construction.
• Conducted and supervised field surveys associated with land surveys.
• Detail survey of construction work in three dimensional systems.
• Performed and supervised various engineering functions related to civil engineering construction and design.
• Monitored and pro-actively identified and corrected technical, schedule and financial issues through effective communication with the Project Manager and other management staff.
• Participated in preparation of engineering services proposals, including the calculation/estimation of time schedules and costs of the proposed work.
• Independently communicated on technical matters with the client.
➢ Topography survey report prepared with angular measurement system using theodolite and level machine.
➢ Stake out the alignment of three kilometer WBM road for Karnali village based on survey.
Client - Qatar General Electricity and Water Corporation
Consultant - ENERGOPROJEKT- FICHTNER CONSORTIUM
Main Contractor - ABB Germany - GTC / 116 / 2006 - 66kV
- GTC / 05 / 2004 - 66kV
- GTC / 57 / 2005 - 220kV
Main Contractor - Mitsubishi Corporation - GTC/124B/2006 - 220kV
III. Project: KAHRAMAA
IV. Electricity Power cable project, Doha, Qatar
Qatar Transmission System Expansion Phase VIII
Client - Qatar General Electricity and Water Corporation
Consultant - ENERGOPROJEKT- ENTEL
Main Contractor - LS CABLE - GTC/142C/2006 - 220kV
Main Contractor - Viscas Corporation - GTC/142H/2006 - 66kV & 220kV
Main Contractor - Taihan Electric Wire Co. Ltd. - GTC/142H/2006 - 220kV
Job Description: • Detail survey of cable route in three dimensional systems.
• Topography survey of land and related property using latest surveying technology.
• Setting out of cable route alignment using geometric co-ordinate system.
• TBM fixing with reference to QND ( Qatar national Datum) PBM.
• Preparing profile drawings, inspection and implementation of HDD jobs.
• As-built surveyed in three dimensional system.
• Involved in different types of surveying works such as building and landscaping as per need and necessity of works.
• Managing and coordinating the survey department having complete knowledge of survey instruments and manpower in related field.
V. Project: KAHRAMAA
Electricity Power cable project, Doha, Qatar
Qatar Electricity Distribution Network (MV & EHV)
Main Contractor - KEMCO
Job Description: • Setting out of distribution power project as per scheme drawing in site.
• Survey of MV & HV Cable circuits distribution for as-built record.
• Field book preparation and submittal to KAHRAMAA.
Main Contractor - Mitsubishi Corporation - GTC / 22 / 2004 -132kV
Main Contractor - SIEMENS - GTC /05/2004 - 66kV
II. Project: KAHRAMAA
Electricity Power cable project, Doha, Qatar
Qatar Transmission System Expansion Phase VII
Client - Qatar General Electricity and Water Corporation
Consultant - ENERGOPROJEKT- FICHTNER CONSORTIUM
Main Contractor - SAUDI CABLE - GTC/124D/2006 - 66kV, 132kV & 220kV
➢ B. Tech in Civil Engineering [Runing from JCRC India
[Diploma in Survey Engineering in 2007] ➢ AUTOCAD (R 10)
➢ Saraswati Secondary School, Kailali, Nepal [School leaving Certificate in 2004 ] Academic Qualification