Project Manager
SPD Contracting
Total years of experience :12 years, 4 Months
Project Manager
SPD Contracting - Interior & Exterior Specialist & SPD Landscaping.
During this tenure I worked with different Consultant /Clients on the following projects:
Ecru Interiors - Complete villa renovation, extension and landscape work at Palm Jumeriah.
Ecru Interiors - Complete villa renovation at Palm Jumeriah.
Private Client - Villa (Mansion) at Dubai Hills.
Blush Interiors International- Villa (Mansion) at MBR City.
Projects Details:
Starting from the blockwork stage, till the handing over to the client, dealing with all authorities, subcontractors, design team, and suppliers, and coordinating all the project resources, Activities (Block, Plaster, Paint, Tiles, Façade, MEP, Swimming Pool, Water Feature, Fish Point, Vertical Garden, Structural Elements Extension,
Design and Supervision private Villas.
PROJECT DETAIL: District1- Mohammed Bin Rashid Al Maktoum City, is an ambitious upcoming project in Dubai undertaken by Meydan Sobha Construction LLC
Project Cost : 35 Billion Dirhams (AED) , Client : Meydan Sobha Developers LLC, Dubai Main Contractor : Meydan Sobha Construction LLC, Dubai , Consultant : AE7.
Job Description :
• Managing & Executing Procurement of Subcontract packages & Material for the Project.
• Strategizing, Preparing & Monitoring pre-subcontracting work packages including scope, quantity, drawings & delivery schedule for all the materials.
• Floating, follow-up & review for submission of quotations & compliance statement and responding to queries.
• Preparing & review of post sub-contracting documents such as method statements, shop drawings, material submittal, finishes selection & RFI’s and ensuring quality of material supplied as per specifications.
• Liaise with client, consultant & subcontractors to ensure the best agreements are set for the business in terms of commercial and technical performance.
• Involved in the early stage development, review and coordinate of the design provided by the consultant.
• Follow up and confirm that all technical documents are sufficed to proceed with all work during - post tender stage.
• Leading the Engineering work for the project. (Shop drawing, Subcontractors prequalification, Material Submittals, Method Statement, RFIs, And As Built Drawing )
• Supporting Project Management in preparing Claim studies / where applicable.
site engineer in volnate tower ( high rise tower in Dubai )
G+35 floor, using Doka system . Meva system for horizontal shutter .
semi hydraulic jumping system for core walls 1, 2, and 3 ( Doka system ) .
doka shutter for columns and retaining walls .
all stairs are precast , post tension slabs .
• Job Description
o Leading & monitoring site construction team
o Contributing & follow up HSE procedure, implementation a task as per HSE standards & regulations.
o Planning for all site activities
o Arrange all site requirements (Material, Equipment, Drawing & Manpower)
o Coordinate with subcontractors & other departments (Technical, Quality control, Procurement, Consultant & Quantity surveyor)
o Follow up with finishing activity (Block, Plaster, Paint, Tiles, Façade, etc...).
o Review the RFIs, IRs, & shop drawings.
Helton project hotel and residence ( one of the biggest projects in Saudi Arabia consist from 2 towers ( 4 B + 3G + 25 floors for each )
2 billion S.R.
using future tables system for horizontal shutter .
full hydraulic jumping system for core walls 1, 2, 3, and 4 ( doka system ) .
doka shutter for columns and retaining walls .
tow way solid slabs .
supervision engineering offices work and inspect new drawing form offices to check it .