QA/QC Manager
Manens Tifs
Total years of experience :22 years, 4 Months
• From : (4-2012) Till now Murray & Roberts -UAE
(Abu Dhabi-Al Mafraq Hospital-SEHA Projects)
Sr. QA/QC Engineer
(Al Mafraq Hospital, "2.25Billion AED")
• From : (4-2010) Till (3-2012) Murray & Roberts -UAE
(Abu Dhabi-Saadiyat Beach Resort Project-TDIC Projects)
Sr. QA/QC Engineer
(St.Rigis hotel, appartements, villas, "2 Billion AED")
• From : (12-2008) Till (3-2010) Murray & Roberts -UAE
( Abu Dhabi International Airport Expansion-Terminal 3-SCADIA Projects)
Sr. QA/QC Engineer
(Etihad Airways Interiem Terminal &Car Park"1.4 Billion AED")
.
Co-ordinate and assist for inspections and all the Technical requirements for ADM(Abu Dhabi municipality).
Implement and maintain the project quality control plan
Performs technical reviews of contractors’ shop drawings, product data, material samples, etc.
Assists in the implementation of the (PAI, RFI, SIN, field observations reports and Control of Non-Conforming Items) program.
Provides Field Quality reports.
Assists in resolution of interface issues.
Participates in constructability reviews.
Participates in periodic contractor progress meetings and daily constrctions meeting
Performs quality control of civil engineering and other functions as required.
Familiar with codes and standards Specs published by the following organizations:
• IBC -• ACI -• CRSI -• ASCE- • AISC -• ASTM -• AASHTO -BS
Inspect the works on site according to the planned procedures, ITP`s and method of statements
Carry out regular analyses of non conformances reports (NCR), PNCR and corrective actions notes to identify areas of increasing or decreasing risk.
To ensure and control that works are carried out according to the design defined by the Design Consultant.
Supervision of site QC activities (Hotel, Appartements Buildings, Villas, Banquet hall, S. pools, beach restaurant, Mango toast, kids club) for the following tasks:-
Checking RFT.steel detail as per approved shopdrawings
Checking insulation and the form works.
Checking Concreting and excavations works.
Checking the landscaping works
Checking the finishing works
Checking the structrual steel works
• From : (12-2006) to (11-2008) SKY ORYX JV (TAISEI - TAV Doha)
( New Doha International Airport-NDIA Projects) - QATAR STATE
Sr. QA/QC Engineer
(Construction of Passenger Terminal Complex -"1, 5 Billion U$D")
(Construction of Terminal Building no. 3 -"350, 000, 000 $")
Implement and maintain the project quality control plan.
Inspect the works on site according to the planned procedures and ITP`s and report these inspections to the head of department.
Carry out regular analyses of non conformances and corrective actions to identify areas of increasing or decreasing risk.
Carry out the identification, collection, disposition, filing, storage and handover of all project quality records.
To ensure and control that works are carried out according to the design defined by the Design Consultant.
Ensuring that a quality system is established and maintained in accordance with ISO 9001
Reporting on the performance of the quality system to the management for review and as a basis for improvement of the quality system and expediently resolve any non-conformances associated with the effective implementation of this policy and the approved Project Quality Management System.
Follow up concrete production include supervision QC batch plant and lab activities.
Perparation of precedures and ITP's.
Preparation and folow up IRF, NCR, RFI, CTQ.
Supervision of site QC activities (Main Building, Fingers Buildings, TB3 Bridge, Power plant structure, Substations no.10, 11, 12, Pre-Cast Beams yard, Upron towers, Remote park area, Utilities Tunnels and Infrastructure Works) for the following tasks:-
Checking RFT.steel detail as per approved shopdrawings
Checking insulation and the form works.
Checking Concreting and excavations works.
Checking lab procedure and testing in the site
Checking and inspecting pre cast units and its installation.
To sure elctro-mechanical works coincide with civil works
Woeking as Civil Engineer in EEG-SIMECSOL Consulting & Technical office Engineer
Project of constructing the extension of grain berth no.13 (600 m length- "110, 000, 000.E.P" at Damietta Port)
(Samsung/Arab Contractors : Concrete works follow up and testing, backfill follow up and testing, Renovation the access roads, checking monitoring measurements, review all Documentations and ITP's)
Stockyard preparation of grain berths no. 15 and 16 (Damietta Port)
Cell (13-3) repair for sheet piles (cellular cofferdame -concrete and welding under water and grout injection ) of grain berth no.15 (Damietta Port)
Laboratory Engineer (Q.C)
Appliance the lab. testings and audits due to standard specifications (ASTM-B.S-AASHTO-E.S-ACI….. and project's specifications)
Quality control on backfilling and asphalt works for stockyard preparation of grain berth no. 13
Quality control on concrete works for project of extension of berth 13
Quality control on backfill and pavement works for Segaz LNG plant parking and access road to the plant from new Damietta road.
Access road to Segaz LNG plant (Arab Contractors)
Quality control on concrete works for deep & shallow foundations and for site preparation of UGDC - NGL Port Said Project.
\{ Project of PORT SAID - EAST PORT\}
Woeking as Superindendent Q.C. Engineer in Construction of Quay wall (1200 m length, Diaphragm walls 63 m depth and Dredged canal "280, 000, 000 $")
Panels / Barrettes excavation and geometry checking using (echo sound equipment)
Steel cages inspection and installation, Slurry tests of bentonite and concrete testing follow up
Checking the instrumentation (cathodic protection, inclinometers, piezometer)
Appliance the inspections and audits due to project's specifications and ITP'S
Check the RFT. Detail as per shop drawings of the super-structure of the quay wall ( it consist of copping beam, capping beam, main girder, pre-cast slabs, transition slabs and cast in situ slabs, fenders, bollards )
Check of the surveying works on site \[ Quay wall surveying - Formwork survey- Dredging surveying (Hydrographic survey)\].
Check of concrete laboratory procedure (auditing-testing-….)
Make the daily, weekly and monthly update reports in order to send it to the main office of HAMZA ASSOCIATES.