Road/Highway Design Engineer
Prime Engineering & Testing Consultants.
Total years of experience :1 years, 10 Months
Till now worked on Lahore-Sialkot Motorway Project, M-4 motorway project (Gojra-Khanewal). Also, worked with Dohwa Engineering Co. pvt Ltd (Korean top consulting design firm ) in JV for M-4 motorway project.
Client: National Highway Authority, Government of Pakistan. (NHA)
Responsibilities include:
1. Responsible of data collection, studying, organizing and compiling Survey Data given by survey team for preliminary and after detailed survey.
2. Final alignment base map and complete preparation of preliminary report.
3.Making Alignments, profiles, by defining surfaces with scope of work encompassing defining Assemblies, and finally making Corridors on Civil 3D.
4. Making cut and fill Volume computations by drawing Section Views.
5. Designed independently Interchanges partial-clover leaf and Full clover leaf as part of assignment.
6.Design optimized profile made for M-4 (Gojra-Khanewal) motorway project.
7.Drainage design of route, Bridge and Culverts Scour Analysis and Flood Design using HEC-RAS.
8. Doing mapping on Arc-GIS v.10 for locating Canals/Drains using Index plans given By Irrigation Departments and showing hydraulic labels and legends.
Expertise using AutoCAD Civil-3D, HEC-RAS and Arc-GIS.
Park One Mix use High Rise building Project. Piling, 2B+18 floors.
Structural Design: Mushtaq and Bilal.
Architecture: Icon Architecture.
Responsibilities Include:
1. Technical Co-ordination between design consultant and site-staff for execution, schedule preparation, pre-planning and resource forecasting for engineering and other technical activities relating to the project. Monitoring performance management of vendors. Ensuring project to be completed according to project plans.Making Complete Execution schedule on Primavera p6 and assisting the Project Manager (PM) on execution.
2. Overall management of construction works, labour, materials, equipment movement and proper distribution of such resources.
3.Make daily workshop report/notes of work being done, any specials. Ensure productions of work is being carried out in accordance with scheduled programme provided.
4.Develop and maintain accurate project schedules and plans at various phases of Projects; analyse and review the progress, review and comment on planning and progress procedures and reports.
1. Assisted Design Department generating design and supervision team on site, Supervised structural steel and civil works on site.
2. Using Sap2000 for Structural designing of the Villas/Mosques.
3. SewerCAD for sewer system design including dry loads and wet load analysis for designing manholes, Carrying out hydrological studies.
4. EPANET for hydrological studies and water network demand analysis.
5. EPA-SWMM 5.1 for calculating water quantity and quality analysis.
6. Basic knowledge of carrying out utility pipe laying work in execution considering the factors like %age slope, Invert level, lengths of pipes and locating from survey drawings.
1. Managing several road maintenances projects, making their time schedules using Primavera p6 and doing progress presentations
before NHA.
2. Involved in doing site meetings with the NHA representatives.
Primary task was to learn the execution of work on site for construction of 104 parliamentary lodges and 700 servant quarters. The activities learned were civil works, structural works, bar bending schedules, about contracts specially FIDIC contracts, planning and project management.
Registered Engineer with Pakistan engineering Council.
2009 HSSC A Grade Federal Board, Islamabad