Supervising Contractors installation works of HVAC, PDFF & Tunnel Ventilation system for underground stations, elevated stations, Annex’s & tunnels in accordance with approved method statement & approved drawings
Carrying out all Inspections of works for HVAC, firefighting, plumbing, drainage, tunnel ventilation systems & conveying systems in accordance with the acceptance criteria
Ensuring the work is completed in accordance with the specified Quality Management and Control system and in a safe manner
Review of Design Submittals ( DCP-0 to DCP-04 )
Reviewing & approving of shop drawings, As-built drawings related to HVAC, PDFF & TVS Services
Review & Approving of Material submittals, Technical submittals, Prequalification of Sub Contractor and Suppliers
Method Statements, Inspection Test Plan, Factory Acceptance Test Procedures, Site Acceptance Tests, etc…
Attending weekly meeting for material & technical discussions with contractors/sub-contractors & client
Review site works and prepare constructability review reporting
Does regular site visits to ensure that the Contractor is complying with the project specifications, local and international codes and standards, and other regulations set forth by the Authorities having jurisdiction.
Prepares progress reports on a daily, weekly, and monthly basis.
Manages a team of Inspectors and allocates them to daily tasks based on Inspection and Test Request and Material Inspection Requests raised by the Contractor.
Raise Non Conformance Notice (NCN) where works are proceeding without compliance to project specification requirements or proper QA/QC procedures.
Overseeing complete gamut of installation works of Tunnel Ventilation system for Underground Stations, Elevated Stations & Tunnels
Manage and coordinate all on site TVS construction related activities for TVS sub-contractor and with other sub-contractors, contractors and with clients
Supervise and coordinate sub-contractors works in accordance with approved method statement, specifications, approved drawings and health and safety procedures
Review and Approving TVS Shop drawings
Coordinate and submit on site change requests
Carry out inspection works of TVS equipment’s delivery, pre-installation, installation and T&C
Preparing of daily & weekly site progress reports
Review on site works and prepare constructability review reporting
Selection of ventilation equipment: Axial fans, jet fans and motorized dampers
Checking and verifying the Specifications for Ventilation equipment’s.
Review of material submittals, method statements & equipment delivery routing related documents submitted by sub-contractor
Closely monitor safety plan of the project in coordination with Safety Manager
Assist Manager in liaising with departmental heads and external parties on organization issues relevant to implementation and maintenance of the Quality Management System
Create, maintain and evaluate product/process trends and participating in process and quality improvement plans.
Investigate, analyze and correct non conformances (internal, external and process NCRs) by conducting root cause analysis, providing corrective action and ensure their effectiveness.
Provide inspection assistance to operations team to execute work as per client requirement.
Assist in documentation and implementation of Company Quality Management System and ISO: 9001:2008 Business Management System.
Ensure the subcontractors comply with MS Construction Quality Management System.
Ensure all Method Statements and Inspection Test Plans are being progressed as planned and approvals obtained where required.
Review and comment on inspection requests, materials inspections, test results, method statements, submitted by Sub-contractors.
Understand the requirements of Drawings / Specifications / MEP Coordination Drawings.
Raise Internal Non-conformance reports (INCRs)/reports, Site Observations (SO’s) identify quality deficiencies in conjunction with the Project Manager / Project Quality Manager
Assist in carrying out audits in accordance with the audit schedule.
Monitor close-out of corrective actions and implementation of preventive actions.
Attending bi-weekly technical meetings with consultant / contractors / subcontractors
Preparing Visuals for MEP works before start of activity and provide trainings to supervisors / workers / QA/QC Engineers / Site engineers as per visuals
Preparing & submitting material submittals for Fire Fighting System as per project specification to the clients for approvals
Preparing Method statements, ITP’s & other QA/QC documents that was requested by project manager and ensure that all quality control procedures are as per clients expectations
Ensuring that construction, installation and testing confirm to specifications and customer requirements.
Inspecting sites daily with Consultants / Main contractors
Carrying out material inspections with Main Contractor and Consultant before use of materials at site
Review comments received from Clients / Consultants on material & technical submittals. Prepare and organize re-submittals by incorporating as required
Closing the NCR’s in co-ordination with management representative / Quality Manager
Interacting with project team in quality requirements
Maintaining all QA and QC documents legible
Ensuring &checking the quality of all Fire Fighting works at site as per the specifications, method statements, Shop drawings & Engineering standards
Provides site specific Quality training and regularly audit safety aspects to ensure conformity.
Review & Revise material submittals, Technical submittals, IR’s, MIR’s, Method Statements & ITP’s for consultant comments
Preparing & submitting material submittals for Fire Fighting System as per project specification to the clients for approvals
•Preparing Method statements, ITP’s & other QA/QC documents that was requested by project manager and ensure that all quality control procedures are as per clients expectations
•Ensuring that construction, installation and testing confirm to specifications and customer requirements.
•Inspecting sites daily with Consultants / Main contractors
•Carrying out material inspections with Main Contractor and Consultant before use of materials at site
•Review comments received from Clients / Consultants on material & technical submittals. Prepare and organize re-submittals by incorporating as required
•Closing the NCR’s in co-ordination with management representative / Quality Manager
•Interacting with project team in quality requirements
•Maintaining all QA and QC documents legible
•Ensuring &checking the quality of all Fire Fighting works at site as per the specifications, method statements, Shop drawings & Engineering standards
•Provides site specific Quality training and regularly audit safety aspects to ensure conformity.
•Review & Revise material submittals, Technical submittals, IR’s, MIR’s, Method Statements & ITP’s for consultant comments
Key Credentials: North Gate Mall Project - Phase -1
•Looking after Incoming Material Inspection to verify the purchased product confirm with specified requirements of the project and also looking after materials storage, handling & storage inspections.
•Liaison with Consultant / Main Contractor for Inspection activities and status briefing with project team.
•Ensuring &checking the quality of all HVAC, PDFF works at site as per the specifications, method statements, Shop drawings & Engineering standards.
•Preparing Method statements, ITP’s procedures for HVAC, PDFF Works and ensure that all quality control procedures are as per clients expectation
•Shouldering the responsibility of preparing Material / Technical submittals of HVAC as per project specification& submitting to the Consultants / Clients for approvals
•Managing actual ESP (External Static Pressure) for Blower selections.
•Looking after Actual Pump Head Calculations for CHW, SCHW & CW Pumps
•Handling take-off material quantities from approved drawings and preparing material requisition.
•Looking after vendor shop/ Factory inspections of all HVAC materials & Equipments.
•Liable for dealing with Suppliers and Manufacturers for material related issues. Taking Quotations of HVAC materials from Client approved manufacturers list & reviewing. Coordination with suppliers for the best price in the market for cost control of the project.
•Review comments received from Clients / Consultants on material & technical submittals. Prepare and organize re-submittals by incorporating as required.
•Coordination with Main Contractor’s MEP Coordinator and Civil Team regarding all aspects of MEP works at site. Main Initiator for giving all Clearance to Main Contractor.
•Prepares Purchase Request & Purchase Order with the coordination of Procurement.
•Coordinate with the supplier regarding Technical discussion & delivery of materials to site.
•Ensuring all materials are ordered in time so that progress on site is not delayed.
•Prepared various reporting formats of daily use (Like Work Progress, RFI, NCR, Weekly, Monthly, Punch list, material procurement log etc.)
•Coordination of all activities at site and resolving day to day technical issues at site with site engineers.
•Carried out all inspections of works from materials, installations & testing and commissioning activities as per project specifications.
Liable to carry out all Inspections of works as per requirements of quality plan, undertake inspection of materials, installations, site work, project planning &Execution (Testing &commissioning) Anchoring on site commissioning activities for HVAC, Fire fighting, plumbing, tunnel ventilation systems, domestic water services, conveying systems and to ensure completion of project with in time & test/equipment & monitor for compliance with approved drawings, specifications, witnessing tests, as required by the specifications.
Planned & coordinated quality control activities & conducted sessions to explain to workers the importance of following quality norms/rule/regulations.
Implemented & monitored quality procedures, monitor, and control & supervised inspection activities. Identified the activities where improvement can be done.
Ensured & checked the quality of all mechanical works at site as per the specifications, method statements, drawings & Engineering standards.
Ensured that all equipments used are calibrated & with valid certificates at proper location for delivery inspection activities.
Done impact study on materials, installations due change in design drawing, DAS and FCR.
Prepared various Periodical Reports regarding Design & Shop Drawings Approval Status, Materials Procurement Status & Site Progress of works.
Reviewed As-Built Drawings as per Specifications, Codes/Standards & Requirements.
Reviewing & approving of method statements, ITP’s submitted by contractor for all mechanical works.
Controlled of NCR (non-conformance report &corrective as well as preventive action &also focus assessment for probable quality losses.
Conducted Internal Quality Audits.
Prepared Quality Manuals, Quality Procedures, Process Manuals.
Conducted Follow up audits/ Surprise audits etc, to ensure non-compliance reported is properly closed, as well as assisting the management for continual improvement of the QMS.
Attending weekly meeting for material & technical discussions with Contractors/sub-contractors
Key Credentials: IVRCL Gates Project
•Checking the Quality, Production of M.S. PIPES & Maintenance of rolling machine, SAW machine & Hydro static test at designed pressure.
•Inspections of works from materials, installations including welding & testing which is going on as per the requirement& specifications.
•In process inspection, dimensional inspection, welding &final inspections
•Quantity Take-off & Ordering of required materials
•Review & Approving of method statements, ITP’s prepared by sub-contractors
•Monitoring of Initial to final Inspection stages for SAWH Pipes.
•Coordination of client Inspections.
•Prepares regular work reports - Daily reports, Equipment failure reports, Incident/Accident reports, Monthly reports, staff/contractor appraisal reports, indicating activities carried out, problems encountered and produces analysis reports of a technical nature indicating failures and recommendations to alleviate recurring problems
Trained by consultants from Dynagro Private Limited, Sri Lanka about Industrial Engineering Concepts.
Key Credentials:
•Line Balancing, Preparing Layouts, Making Operation Bullet-in, Work Study, Time Study, Standardization of Work Stations and Work Methods, Designing work aids.
•Implemented and maintained new engineered methods for better productivity and reduced operational cost
•Operator performance development & Support production in all changing projects
•Planned & coordinated quality control activities & conduct sessions to explain to workers the importance of quality.
•Carried out Quality inspections at three stages including final audit.
•Resolved quality issues; maintain proper inspection records, in accordance to ensure compliance as per requirements
•Planned & coordinated quality control activities & conduct sessions to explain to workers the importance of quality.
•Carried out Quality inspections at three stages including final audit.
•Resolved quality issues; maintain proper inspection records, in accordance to ensure compliance as per requirements
courses: Certificate Courses: •Certified QA/QC Engineer-Mechanical from SEA,Hyderabad. •Certified in Design, Erection, Maintenance & Estimation of HVAC Project Works, Fire Fighting & Plumbing Services at Technolco Institute, Hyderabad. •Certified PRO/Engineer at Esquire Engg Solutions , Chennai