Electrical Engineer
Engie Cofely Mannai
Total years of experience :14 years, 5 Months
• Coordinated with the clients, contractors and engineering departments for progressive of assigned works in order to achieve the KPI.
• Coordinated with OEM Vendors for Maintenance and troubleshooting of equipment’s with respect to the contract and KPI.
• Maintained Logs and Supervisory of PTW, Work request and RFE submittals in CAFM system.
• Attended site meeting and coordinated the activities in order to complete the assigned task with respect to the schedule.
• Carried out preventive maintenance activities for MV/LV panels, Transformers, UPS, CBS, Generators, Capacitor bank, Solar system, Electric motors and etc.,
• Analyzed equipment break downs, prepared/carried out immediate corrective actions and root cause analysis with respect to nature of the breakdown.
• Assisted in training of facility personnel in the use of new systems. Estimated required resources and manpower assigning for the required work/project.
• Carried out upgradation of north pumping stations, Installation of Power transformers in LAS building (1600KVA X 2 Nos - Dry Type Transformers) and Conversion of OFF grid to ON grid Solar system in North Infra Area.
• Carried out installation of street lights along the education city tramway including procurement, civil works, electrical works and erection of 12M Light poles.
Managed various contractor disciplines throughout the installation, equipment commissioning and startup of the facility (KFMMC - Dhahran)
• Negotiates, managed & maintained relations with vendors and subcontractors.
• Making decisions and solving problems - Analyzing information and evaluating results to choose the best solutions for solving problems.
• Carried out preventive maintenance activities for MV/LV panels, Transformers, UPS, CBS, Generators, Capacitor bank, Solar system, Electric motors and etc.,
• Analyzed equipment break downs, prepared/carried out immediate corrective actions and root cause analysis with respect to nature of the breakdown.
• Co-ordination with clients and clients representatives for shut down activities and to ensure the works are executing under regulation norms and safety standards.
• Prepared monthly progress report to client submissions and providing timely reports and information to higher management in order to resolve the issues.
• Managed and maintained equipment’s data and history.
• Carried out survey and inspection of new substations and evaluated cost for new transmission and distribution path.
• Prepared technical details, material estimation, layout for new substation, and Transmission & distribution path for client approval.
• Carried out joint inspection with clients over the execution procedures and standards.
• Carried out erection and stringing of New HT/LT Lines.
• Carried out strengthening of existing LT Lines.
• Individually handled the division of project BOQ execution and been in the part of billing process.
• Coordination and following up with subcontractors for completion of work within the stipulated time.
• Prepared daily and weekly reports.
• Estimated required materials, work force and equipment’s required for project execution.
• Prepared material submittals, RFI documents, Project completion documents/manuals and assisted drafting team to prepare final As-Built drawings for client submission and approval.
• Carried out upgradation of underground electrical distribution network for Yanbu Marafiq - Royal Commission Facility.
• Carried out maintenance activities for 11KV/3.3KV and 11KV/415V substation equipment maintenance such as transformers, switchgears (VCB & ACB), Auxiliary power systems, Batteries, pumps and emergency systems.
• Analyzed equipment break downs, prepared/carried out immediate corrective actions and root cause analysis with respect to nature of the breakdown.
• Co-ordination with clients and clients representatives for shut down activities and to ensure the works are executing under regulation norms and safety standards.
• Co-ordinated with subcontractors and vendors for work schedule, material delivery, work execution and conducted inspections for their work quality.
• Prepared and submission of daily and monthly reports to clients & higher management.
• Conducted weekly tool box meeting and Maintained material stock reports.
• Carried out daily routine inspection of HFO Engines operation, Oil and Fuel Level, Cooling Plant, Air intake plant, Electrical switch room and pump rooms.
• Maintained daily log of electrical parameters, oil & fuel consumption, Water levels.
• Maintained breakdown history of all generation plant equipment’s.
• Carried out preventive maintenance for transformers, Generators, Pumps, Switchgears and etc.,
• Analyzed equipment break downs, prepared/carried out immediate corrective actions and root cause analysis with respect to nature of the breakdown.
• Installed new transformers, switchgears and electrical distribution panel boards under plant expansion works.
• Prepared technical submittal and coordinated with Govt. sector (TNEB) for transformer, Electrical panel board approvals.
• Co-ordination with contractor for material deliver, work schedule and carried out daily inspection for work quality and progress.
• Prepared and submitted daily & monthly report to plant manager.
Bachelor of Engineering in Electrical through Anna University, Chennai
• Diploma In Electrical Engineering through Department of Technical Education, Chennai