saad elbahnasy, sr. planning Engineer

saad elbahnasy

sr. planning Engineer

4th dimenstion

Location
Egypt - Cairo
Education
Bachelor's degree, IT And Spatial Management
Experience
20 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :20 years, 3 Months

sr. planning Engineer at 4th dimenstion
  • Iraq - Al Najaf
  • November 2019 to April 2020

• Prepared based on the Overall Project Schedule according to the Sub-contract jointly with Clint the Baseline Schedule ( using Primavera P6 for EPC project )
• Elaborate the Project monitoring system with respect to WBS & allocating weightage
• Prepared the Overall Schedule of Level 4 for all activities and constantly focus on the possible optimization of durations of individual activities, their sequencing etc. in line with actual progress of the Works thus to observe the potential time contingency .
• Regularly monitored the Overall project progress with respect to approved schedule and measurement system including the individual milestones of DTO, CTO, MHO, TOP
• Prepared S-curves for the Overall Project and monitor the progress of the Works with respect to the same and up-date in line with the actual Progress achieved in different Areas.
• Evaluated and control the Construction productivity of individual disciplines

Planning Engineer at Jurmat Group
  • Iraq - Basra
  • May 2015 to October 2019

• Prepared based on the Overall Project Schedule according to the Sub-contract jointly with Clint the Baseline Schedule ( using Primavera P6 for EPC project )
• Elaborate the Project monitoring system with respect to WBS & allocating weightage
• Prepared the Overall Schedule of Level 4 for all activities and constantly focus on the possible optimization of durations of individual activities, their sequencing etc. in line with actual progress of the Works thus to observe the potential time contingency
• Maintain the Look-ahead three months forecast Program and to alert and share with Project and Construction Manager any potential critical areas/activities together with the proposed variants of the resolutions or mitigation to prevent the noncompliance to meet main Sub-contractual milestones
• Permanently monitored the Overall Time Schedule & Critical Path to avoid any slippage
• Prepared the Action Plan & Risk evaluation including the solution accelerate the Works in the areas/activities with the slippage observed
• Regularly monitored the Overall project progress with respect to approved schedule and measurement system including the individual milestones of DTO, CTO, MHO, TOP
• Prepared S-curves for the Overall Project and monitor the progress of the Works with respect to the same and up-date in line with the actual Progress achieved in different Areas
• Prepared and maintain the Critical Path Schedule its analyses including the proposed manner of the resolution and mitigation
• Prepared regular reports like MR, WR, SDR
• Reported and highlight to the Project and Construction Managers with no delay any substantial accidental slippages that may result in the Work Progress disturbance
• Evaluated and control the Construction productivity of individual disciplines

Planning Engineer at Jurmat Group
  • Iraq - Basra
  • May 2015 to October 2019

• Prepared based on the Overall Project Schedule according to the Sub-contract jointly with Clint the Baseline Schedule ( using Primavera P6 for EPC project )
• Elaborate the Project monitoring system with respect to WBS & allocating weightage
• Prepared the Overall Schedule of Level 4 for all activities and constantly focus on the possible optimization of durations of individual activities, their sequencing etc. in line with actual progress of the Works thus to observe the potential time contingency
• Maintain the Look-ahead three months forecast Program and to alert and share with Project and Construction Manager any potential critical areas/activities together with the proposed variants of the resolutions or mitigation to prevent the noncompliance to meet main Sub-contractual milestones
• Permanently monitored the Overall Time Schedule & Critical Path to avoid any slippage
• Prepared the Action Plan & Risk evaluation including the solution accelerate the Works in the areas/activities with the slippage observed
• Regularly monitored the Overall project progress with respect to approved schedule and measurement system including the individual milestones of DTO, CTO, MHO, TOP
• Prepared S-curves for the Overall Project and monitor the progress of the Works with respect to the same and up-date in line with the actual Progress achieved in different Areas
• Prepared and maintain the Critical Path Schedule its analyses including the proposed manner of the resolution and mitigation
• Prepared regular reports like MR, WR, SDR
• Reported and highlight to the Project and Construction Managers with no delay any substantial accidental slippages that may result in the Work Progress disturbance
• Evaluated and control the Construction productivity of individual disciplines

Planner at Hussein Atieh & Sons LLC for Construction & Contracting (HAE).
  • Jordan - Amman
  • February 2000 to April 2015

• Prepared based on the Overall Project Schedule according to the Sub-contract jointly with Clint the Baseline Schedule ( using Primavera P6 for EPC project )
• Elaborate the Project monitoring system with respect to WBS & allocating weightage
• Prepared the Overall Schedule of Level 4 for all activities and constantly focus on the possible optimization of durations of individual activities, their sequencing etc. in line with actual progress of the Works thus to observe the potential time contingency
• Maintain the Look-ahead three months forecast Program and to alert and share with Project and Construction Manager any potential critical areas/activities together with the proposed variants of the resolutions or mitigation to prevent the noncompliance to meet main Sub-contractual milestones
• Permanently monitored the Overall Time Schedule & Critical Path to avoid any slippage
• Prepared the Action Plan & Risk evaluation including the solution accelerate the Works in the areas/activities with the slippage observed
• Regularly monitored the Overall project progress with respect to approved schedule and measurement system including the individual milestones of DTO, CTO, MHO, TOP
• Prepared S-curves for the Overall Project and monitor the progress of the Works with respect to the same and up-date in line with the actual Progress achieved in different Areas
• Prepared and maintain the Critical Path Schedule its analyses including the proposed manner of the resolution and mitigation
• Prepared regular reports like MR, WR, SDR
• Reported and highlight to the Project and Construction Managers with no delay any substantial accidental slippages that may result in the Work Progress disturbance
• Evaluated and control the Construction productivity of individual disciplines
• In the close coordination with the Construction Manager and Lead Site Engineers to regularly control the Work Progress of compare to the L4 Schedule and if needed to jointly the debottlenecking contingency Plan to catch the Scheduled Progress and/or to minimize the impacts to the subsequent activities.
• Monthly invoicing of the Directs Works and control all necessary the Invoices to be ready for Clint approval.
• Follow and control the status of monthly Invoices issued towards Clint & to up-date regularly the S-curve with respect to Overall Budget and its Breakdown to the Main Portions of the Sub-Contract Price.

Education

Bachelor's degree, IT And Spatial Management
  • at Ain Shams University
  • February 1995

Specialties & Skills

العمل الجماعي
حساب الكميات
الادارة / التخطيط / الحاسوب
الاظهار المعماري
التصميم ثنائي الابعاد / ثلاثي الابعاد
تنسيق الاجتماعات وعرض اجندة الاجتماع

Languages

Arabic
Native Speaker

Training and Certifications

ادارة المشروعات (Training)
Training Institute:
مؤسسة حسين عطية
Date Attended:
January 2015
Duration:
40 hours

Hobbies

  • الشطرنج - السباحة - الافلام الاجنبية