Job Responsibilities:
Define an appropriate Work Breakdown Structure (WBS) in
accordance with the Client and project requirement.
Prepare the Estimate Plan to establish the estimating
methodology and cost estimating principles applicable to the
estimate preparation, This may include the development of
Basis of Cost Estimate.
Review design scope criteria and quantities for completeness
and reasonableness and coordinate with the project to develop
additional estimating bases when information is incomplete.
Supervise the collection, verification and integration of work
scope into the cost estimate including labour rate derivation,
installation rates, productivity analysis, and associated
engineering and construction costs.
Compare and analyse scope, quantities, and cost data between
projects. Benchmark estimates by carrying out validation and
verification of previous estimates, outcome costs and vendor
prices using high level norms and industry standards.
Reviewing and checking Bill of Quantities (B.O.Q) submitted by
the Consultant for Approved Design Packages
Develop escalation model where required and assist with the
development of owners cost.
Support development estimating standards and procedures.
Compiles, summarizes, updates and maintain estimate and
historical cost data.
Reviewing and checking revised B.O.Q submitted by the
contractors and Evaluate unit price of new items.
Reviewing and assessment the variation requests and claims
submitted by the contractors.
Make cost estimate for the incomplete works and contractual
obligations for applying Penalties.
Review or assist in reviewing schedule/cost engineering and
material control related provisions or proposals and develops
supporting data for contract negotiations. Participates in
establishing pricing structures to be applied to quantities for
estimates.
Define project needs for cost control in accordance with
contractual requirements, objectives, and procedures.
6 of 15
Attendance and representation at commercial meetings
Project Extension of El. Rain - Besha High Way Phase3
Job Responsibilities:
Include one Bridge with 200m length & 44 Box Culvert & 6 Pipe
Culvert with total budget 66 million Riyal. Worked as Chief Survey
Engineer and Site Engineer in the aforementioned project and he
Was Responsible for :
Make coordination between all utilities in the project
Directing the surveyors team on how to check the work in site
Coordination for Delivery of all the works to the Engineer of
Consultant
Write daily report for the work that has been done in site
Check for (plan and profile) to road
Maintain a rolling quantity and cost forecast by maintaining and
updating the Contract Basis Bills of Quantity to reflect o
approved sub-contractor claims o Bill of Quantity updates
issued by Construction Estimating Team for Issued for
Construction engineering information addendums