Job Responsibilities :
• Supporting the Maintenance activities by providing specialist engineering knowledge and advice, associated with the full range of building services.
• Preparing Annual Maintenance Contract (AMC) for MEP works.
• Maintaining good and harmonious relationships with the client, tenants, and visitors and respond to any complaints promptly.
• Preparing Quotations and Bidding for Clients.
• Following up payments with The Costumers.
• Providing analysis and comment technically upon maintenance feedback from both in-house and specialist service partners.
• Scheduling the planned preventive maintenance (PPM) and General maintenance(GM) program to get customer satisfaction also, ensure high-efficiency performance.
• Coordinating with the Client and contractor to avoid delaying the project.
• Ensure implementation of quality, environmental safety, health rules, and regulation at the project site, Manage the day to day work of the MEP team.
Job Responsibilities :
• Reviewing and checking the detailed design prepared by the designed contractor & subcontractor before submission to the client for approval.
• Carrying out an inspection for construction activities and grant approvals upon compliance with drawings, specifications, codes, and standards.
• Reviewing materials submittals and grant approvals compliance with drawings, specifications, codes and standards discrepancies observed.
• Coordinating with the client & contractor to avoid delaying the project.
• Ensuring implementation of quality, environmental safety, health rules, and regulation at the project site. & Manage the day to day work of the MEP team.
• Monitoring and promoting health and safety on the site. Recording and reporting any breaches to the Project Manager. If required stop the construction works if unsafe practices are being followed.
• Reviewing and commenting on the Contractor’s Operation and Maintenance manuals.
• Preparing draft site/engineer’s instructions, relating to the building mechanical services, as required and issue to the Project Manager.
• Witness on-site piped system pressure test, air conditioning duct leakage testing and another testing that may be required during the first fix works and advise the Project Director accordingly.
• Maintaining an on-going list of mechanical services defects for the contractor’s remedial action.
• Undertaking final project snagging and prepare a list of defects for the Contractor’s action.
• witness mechanical system final testing and commissioning.
• Monitoring mainline pumps essentially, flowrate, pressure, temperature, density, pump raves (R.P.M), start-up, and shutdown.
• Communications with other station operators.
• Pumping products through the line.
• Measuring the collecting and issuing quantities, by dipping positive displace meter (P.D meter) according to the American Society for Testing and Materials (ASTM).
• Coordinate with the maintenance department to solve problems
through the work order.
• Issues daily report the monthly report also annual report.