مهندس ثالث كهرباء
arabcontractors
Total years of experience :14 years, 4 Months
1.inestellation of trays, Cables with multiple sections, Collecting electricalcontrol panals, Connecting cables to the electrical panals, operation for all (three&single)phase motors&pumps&vans&compressors&blowers
2.operating numbers of filter control disks contain plcs and regulation of limitswitches which move the feedback signals to the plc addition to control all the selonoid valves 24vdc installed on the actuators existed in the pneumatic system and calibrate(4-20 ma) valves
3.calibration for aumamatic electrical valves & Different measuring devices such as Turbiditymeter, phmeter, levelswitches, ultrasoniclevelmeter, magneticflowmeter, and clorine analyser
4.connecting the transformers and disel generators to the main distrbution board
5.earthing system for the Water purification station
6.instellation of several kinds of pumps like centerfugal&Submersible&wells&booster&screw and piston pumps
7.inestellation of all electrical cranes with (one move or twomove)
Courses & Software 1. Electrical engineering 2. Control engineering. 3. Electrical and electronic measurements. 4. Micro controllers (MOTOROLLA products). 5. Programmable logic controllers (plc) [nano-micro-zelio]. 6. Industrial automation system (scada-dcs). 7. Intelligent control system (fuzzy neural networks and its applications). 8. Industrial electronics and applications of industrial electronics. 9. Real time control system and digital control system 10 .Power distribution system course