ANAND CHENDKE, PROJECT PLANNER

ANAND CHENDKE

PROJECT PLANNER

ALSTOM POWER ASIA PACIFIC

Location
Malaysia
Education
Diploma, THERMAL POWER PLANT ENGINEERING
Experience
20 years, 6 Months

Share My Profile

Block User


Work Experience

Total years of experience :20 years, 6 Months

PROJECT PLANNER at ALSTOM POWER ASIA PACIFIC
  • Malaysia
  • My current job since October 2003

DETAIL CV IS ATTACHED IN THIS WEBSITE FOR PROFESSIONAL CAREER RELATED EXPERIENCE.

PROJECT PLANNER at ALSTOM POWER ASIA PACIFIC
  • Malaysia
  • My current job since October 2003

DETAIL CV ATTACHED FOR DETAIL PROFESSIONAL EXPERIENCE

Project Planner at Global Support
  • Malaysia
  • March 2014 to July 2014

Duration - 01 Mar 2014 to till date

Role & Designation - Project Planner (Global Support)

Location - Head Office, Kuala Lumpur, Malaysia
Responsibilities

• Preparation of Tender Schedule for Geothermal Plant, Solar Plant and Biomass Plant as per
Alstom standard procedures.
• Global Support to execution team in Kuala Lumpur, Baden (Switzerland) and Mexico team.
• Generated following Geothermal Project Tender Schedule.
a. 1x30 MW Karaha GPP, Indonesia.
b. 1x6 MW Northern Negros, Philippines.
• Generated different scenarios and their analysis for tender schedule.
• Efficiently utilized Activity codes, Group, Sort, Layout, Critical Path analysis with the help of
Primavera version 8.2.
• S curve generation for tender schedule.

2.

PROJECT PLANNER at Renewable Steam Plant
  • Malaysia
  • March 2014 to July 2014

Alstom Power Asia Pacific, Kuala Lumpur, Malaysia (From - 12 March 2012 to till date)

1.
Company - Renewable Steam Plant
st

Lead Tender Planner at Thermal Power - Gas
  • Malaysia
  • April 2013 to February 2014

Company - Thermal Power - Gas
st th
Duration - 01 April 13 to 28 Feb 2014

Role - Lead Tender Planner

Designation - Planning Manager

Location - Head Office, Kuala Lumpur, Malaysia

Responsibilities
• Preparation of Tender Schedule for Combined and Open Cycle Gas Project as per Alstom standard
procedures.
• Tendering schedule - GT 26 X 6 Units for PETRONAS CPP Malaysia, GT-13E2X 2 Units Grati
MS CCP Indonesia, and KA24-1 MS Trans Asia Philippines.
• Generated different scenarios and their analysis for tender schedule.
• Efficiently utilized Activity codes, Group, Sort, Layout, Critical Path analysis with the help of
Primavera version 8.2
• S Curve generation for Tender schedule.
• Achieved "Best Project of the Year" award for my idea of "Net Plan of Commissioning" for improvement of the planning process under Alstom's "Experience Response System (ERS) "
initiative.
• Involved in basic initial set up of worksheet of "Earn Value Management for Engineering" project under ERS. This project was awarded "Best Project of the Month".
3.
Project Name - 1 x 400 MW CCPP, site at Singapore, TUAS Power.

Project Cost - 300 Million EURO.
th

Lead Project Planner at Thermal Power - Gas
  • Malaysia
  • March 2012 to March 2013

Duration - 12 March 2012 to 31-Mar 2013

Role - Lead Project Planner

Designation - Planning Manager

Location - Head Office, Kuala Lumpur, Malaysia
Responsibilities

• Updation and scheduling of approximately 10, 000 activities with quality checks for internal project
schedule. Client schedule Updation.
• Critical path analysis according total float and critical path wise.
• Planning, organizing and coordinating skills in international environment.
• Implementation of commissioning Net Logic.
• Monitoring of Piping (Inch dia) and Electrical cabling activities (Cable pulling, Termination and testing activities)
• Monitoring and controlling of DTO, CTO, MHO, and TOP. Management of TOPs in schedule.
• Integration of contractor's schedule in Main project schedule.
• Effective utilization of WBS, Activity codes, Filters, Layouts, Group and Sort, User defined fields,
Baselines.
• Smooth & Continuous coordination with site planner and other EPC team members across different
countries in Alstom.
• Piping schedule integration of Large bore and Small bore. Electrical cabling activities (Power cable,
LV Cable, I&C cable and MV cable) addition to main project schedule for monitoring purpose.
• Biweekly and Monthly report preparation.
• Preparation of STECO report for Top Management.
• Monitoring, Controlling and Gap Analysis of Payment milestones, IFRS milestone and Project Key
dates.
• Monitoring & controlling key milestone dates to avoid contractor claims (Civil handover,
Mechanical handover, Material handover and Commissioning handover)
• Tendering schedule - GT 26 X 6 Units For PETRONAS CPP Malaysia, GT-13E2X 2 Units Grati MS
CCP Indonesia, KA24-1 MS Trans Asia Philippines
• On time performance (OTP), EV analysis, Dashboards, Quality Audit Document for Planning.


th

at Thermax Limited
  • India
  • April 2010 to January 2012

Thermax Limited, Pune (From - 06 April 2010 to 30-Jan 12)
1.
Project Name - 2 x 60 MW Indian Metal Ferro Alloys TPP

Project Cost - 100 Million USD
th

Planning & Project Control Engineer (Project Mgmt Group - EPC) at Project Mgmt Group
  • April 2010 to January 2012
at Reliance Infrastructure Ltd
  • India
  • October 2003 to February 2010

Reliance Infrastructure Ltd (From - 20 Oct 2003 to 05 Feb 2010)

2.
Project Name - 2 x 300 MW Coal Based Butibori GCPP, Nagpur

Planning & Project Control Engineer (Project Mgmt Group - EPC) at Project Mgmt Group
  • March 2008 to February 2010
Lead Tender Planner at Project Mgmt Group
  • India
  • April 2007 to March 2008

Role - Lead Tender Planner

Designation - Planning Manager

Location - Head Office, Kuala Lumpur, Malaysia

Responsibilities
• Preparation of Tender Schedule for Combined and Open Cycle Gas Project as per Alstom standard
procedures.
• Tendering schedule - GT 26 X 6 Units for PETRONAS CPP Malaysia, GT-13E2X 2 Units Grati
MS CCP Indonesia, and KA24-1 MS Trans Asia Philippines.
• Generated different scenarios and their analysis for tender schedule.
• Efficiently utilized Activity codes, Group, Sort, Layout, Critical Path analysis with the help of
Primavera version 8.2
• S Curve generation for Tender schedule.
• Achieved "Best Project of the Year" award for my idea of "Net Plan of Commissioning" for improvement of the planning process under Alstom's "Experience Response System (ERS) "
initiative.
• Involved in basic initial set up of worksheet of "Earn Value Management for Engineering" project under ERS. This project was awarded "Best Project of the Month".
3.
Project Name - 1 x 400 MW CCPP, site at Singapore, TUAS Power.

Project Cost - 300 Million EURO.
th
Duration - 12 March 2012 to 31-Mar 2013

Role - Lead Project Planner

Designation - Planning Manager

Location - Head Office, Kuala Lumpur, Malaysia
Responsibilities

• Updation and scheduling of approximately 10, 000 activities with quality checks for internal project
schedule. Client schedule Updation.
• Critical path analysis according total float and critical path wise.
• Planning, organizing and coordinating skills in international environment.
• Implementation of commissioning Net Logic.
• Monitoring of Piping (Inch dia) and Electrical cabling activities (Cable pulling, Termination and testing activities)
• Monitoring and controlling of DTO, CTO, MHO, and TOP. Management of TOPs in schedule.
• Integration of contractor's schedule in Main project schedule.
• Effective utilization of WBS, Activity codes, Filters, Layouts, Group and Sort, User defined fields,
Baselines.
• Smooth & Continuous coordination with site planner and other EPC team members across different
countries in Alstom.
• Piping schedule integration of Large bore and Small bore. Electrical cabling activities (Power cable,
LV Cable, I&C cable and MV cable) addition to main project schedule for monitoring purpose.
• Biweekly and Monthly report preparation.
• Preparation of STECO report for Top Management.
• Monitoring, Controlling and Gap Analysis of Payment milestones, IFRS milestone and Project Key
dates.
• Monitoring & controlling key milestone dates to avoid contractor claims (Civil handover,
Mechanical handover, Material handover and Commissioning handover)
• Tendering schedule - GT 26 X 6 Units For PETRONAS CPP Malaysia, GT-13E2X 2 Units Grati MS
CCP Indonesia, KA24-1 MS Trans Asia Philippines
• On time performance (OTP), EV analysis, Dashboards, Quality Audit Document for Planning.


th
Thermax Limited, Pune (From - 06 April 2010 to 30-Jan 12)
1.
Project Name - 2 x 60 MW Indian Metal Ferro Alloys TPP

Project Cost - 100 Million USD
th
Duration - 06 April 2010 to 30 Jan 2012

Role - Planning & Project Control Engineer (Project Mgmt Group - EPC)

Designation - Dy. Manager
Location - Old Thermax House, Pune

Responsibilities
• Concept development, Preparation, Updating & Scheduling of Thermal Power Project Activities (L1,
L2, L3, L4 schedule for ISBL 5000-7000 EPC activities including Civil, Mechanical, Electrical & C&I
discipline) on PRIMAVERA Software version 6.1 for internal customer & client.
• Critical path analysis for Steam Drum Erection, Boiler Hydro Test, Boiler Light Up, Synchronization,
DM Plant Commissioning, Compressed Air System, Raw Water Reservoir, Water Treatment Plant,
Cooling Tower & Backfeed charging in PRIMAVERA.
• One month look ahead plan for Steam Drum Erection, Boiler Hydro Test, Boiler Light Up,
Synchronization, DM Plant Commissioning, Compressed Air System, Raw Water Reservoir, Water
Treatment Plant, and Cooling Tower & Backfeed charging in PRIMAVERA.
• Variance analyses of one-month look ahead plans & package wise impact on overall project
schedule.
• Preparation & submission of Engineering, Procurement & Construction activities in PRIMAVERA for senior management review.
• Effective utilization of tools in PRIMVARA software like Filter, Group & Sorts, Layouts for better
Project Monitoring & Control.
• Preparation, monitoring & controlling of detail L3-L4 level schedule of 132 kV Switchyard & Backdeed charging, Water System including DM plant commissioning.
• Preparation of invoicing plan for Civil Works, Erection & Commissioning, Supplies for Boiler, ESP,
STG & other packages on basis of approved Billing Break up & PRIMAVERA schedule.
• Preparation of monthly progress report for client.
• Preparation & updation of EPC S Curve on basis of PRIMAVERA schedule.
• Actively involve in OPEX project wherein each individual is assigned short-term project to study, analysis & suggest corrective action to modify or upgrade existing project
management processes. Successfully completed Opex Project (Release of RFC drawings of
STG Building & Water System) and received appreciation from top management.
• Master drawing list preparation & updation of project packages.
• Procurement analysis of Project packages.
• Coordination among engineering, procurement & construction group.
• Preparation of Site Presentation for Project.
• Responsible for DCS, Fire Alarm, Instrument Cable, Generator Transformer, Field instruments
packages under project management.
• Involve in preparation of Water requirement, Fuel requirement & Power requirement for commissioning of system.
• Preparation of proposal schedule & Cash inflow & outflow for bidding purpose. (4x300 MW SKS
TPP, 1x300 MW MARUTI TPP, 2X300 MW JPGPL TPP, 2X60 MW PT TRIA TALANG EMAS
BATAM TPP)


th th
Reliance Infrastructure Ltd (From - 20 Oct 2003 to 05 Feb 2010)

2.
Project Name - 2 x 300 MW Coal Based Butibori GCPP, Nagpur
Project Cost - 320 Million USD
Duration - 25 March 2008 to 05 Feb 2010
Role - Planning & Project Control Engineer (Project Mgmt Group - EPC)
Designation - Manager
Location - Corporate Office, Santa Cruz (E) Mumbai
Responsibilities
-
• Concept development, Preparation, Updation & Scheduling of Thermal Power Project Activities (L1
& L2 schedule for OSBL, ISBL & EPC activities) on PRIMAVERA Software version 6.0 for internal
customer, external customer & Lender
• Involve in concept development & preparation of L3 level schedule of main BTG package for site
execution along with site team. (Concept of constructability for BTG package)
• Concept development, Generation & Updation of S curves for Engineering, Procurement,
Construction & Overall Progress for entire project
• Concept development, Generation & Updation of Construction plans along with Construction S
Curves & Concreting quantity S curves for BOP civil packages.
• Concept development, Generation, Automation & Updation of Engineering & Procurement
Schedule for 164 packages.
• Concept development, Generation, Automation & Updation to measure engineering deliverables.
• Involve in coordination among Engineering, Procurement & Construction groups & carry out coordination meetings on Daily, Weekly & Monthly basis.
• Involve in Preparation & Updation of Daily MIS, Weekly MIS, Weekly Construction MIS, Weekly
Exception MIS & Monthly Progress Report for Internal & External Customers.
• Involve in preparation of Top Management Presentations focusing on Critical Issues of EPC & Management Support.
• Involve in development of manpower in planning dept.
2.A
Project Name - 4 x 600 MW Coal Based TPP (Shahapur MEGL - Alibaug)
Project Cost - 2400 Million USD
th th

Assistant Manager at Project Mgmt Group
  • April 2007 to March 2008
Lead Tender Planner at Project Mgmt Group
  • India
  • July 2005 to April 2007

Role - Lead Tender Planner

Designation - Planning Manager

Location - Head Office, Kuala Lumpur, Malaysia

Responsibilities
• Preparation of Tender Schedule for Combined and Open Cycle Gas Project as per Alstom standard
procedures.
• Tendering schedule - GT 26 X 6 Units for PETRONAS CPP Malaysia, GT-13E2X 2 Units Grati
MS CCP Indonesia, and KA24-1 MS Trans Asia Philippines.
• Generated different scenarios and their analysis for tender schedule.
• Efficiently utilized Activity codes, Group, Sort, Layout, Critical Path analysis with the help of
Primavera version 8.2
• S Curve generation for Tender schedule.
• Achieved "Best Project of the Year" award for my idea of "Net Plan of Commissioning" for improvement of the planning process under Alstom's "Experience Response System (ERS) "
initiative.
• Involved in basic initial set up of worksheet of "Earn Value Management for Engineering" project under ERS. This project was awarded "Best Project of the Month".
3.
Project Name - 1 x 400 MW CCPP, site at Singapore, TUAS Power.

Project Cost - 300 Million EURO.
th
Duration - 12 March 2012 to 31-Mar 2013

Role - Lead Project Planner

Designation - Planning Manager

Location - Head Office, Kuala Lumpur, Malaysia
Responsibilities

• Updation and scheduling of approximately 10, 000 activities with quality checks for internal project
schedule. Client schedule Updation.
• Critical path analysis according total float and critical path wise.
• Planning, organizing and coordinating skills in international environment.
• Implementation of commissioning Net Logic.
• Monitoring of Piping (Inch dia) and Electrical cabling activities (Cable pulling, Termination and testing activities)
• Monitoring and controlling of DTO, CTO, MHO, and TOP. Management of TOPs in schedule.
• Integration of contractor's schedule in Main project schedule.
• Effective utilization of WBS, Activity codes, Filters, Layouts, Group and Sort, User defined fields,
Baselines.
• Smooth & Continuous coordination with site planner and other EPC team members across different
countries in Alstom.
• Piping schedule integration of Large bore and Small bore. Electrical cabling activities (Power cable,
LV Cable, I&C cable and MV cable) addition to main project schedule for monitoring purpose.
• Biweekly and Monthly report preparation.
• Preparation of STECO report for Top Management.
• Monitoring, Controlling and Gap Analysis of Payment milestones, IFRS milestone and Project Key
dates.
• Monitoring & controlling key milestone dates to avoid contractor claims (Civil handover,
Mechanical handover, Material handover and Commissioning handover)
• Tendering schedule - GT 26 X 6 Units For PETRONAS CPP Malaysia, GT-13E2X 2 Units Grati MS
CCP Indonesia, KA24-1 MS Trans Asia Philippines
• On time performance (OTP), EV analysis, Dashboards, Quality Audit Document for Planning.


th
Thermax Limited, Pune (From - 06 April 2010 to 30-Jan 12)
1.
Project Name - 2 x 60 MW Indian Metal Ferro Alloys TPP

Project Cost - 100 Million USD
th
Duration - 06 April 2010 to 30 Jan 2012

Role - Planning & Project Control Engineer (Project Mgmt Group - EPC)

Designation - Dy. Manager
Location - Old Thermax House, Pune

Responsibilities
• Concept development, Preparation, Updating & Scheduling of Thermal Power Project Activities (L1,
L2, L3, L4 schedule for ISBL 5000-7000 EPC activities including Civil, Mechanical, Electrical & C&I
discipline) on PRIMAVERA Software version 6.1 for internal customer & client.
• Critical path analysis for Steam Drum Erection, Boiler Hydro Test, Boiler Light Up, Synchronization,
DM Plant Commissioning, Compressed Air System, Raw Water Reservoir, Water Treatment Plant,
Cooling Tower & Backfeed charging in PRIMAVERA.
• One month look ahead plan for Steam Drum Erection, Boiler Hydro Test, Boiler Light Up,
Synchronization, DM Plant Commissioning, Compressed Air System, Raw Water Reservoir, Water
Treatment Plant, and Cooling Tower & Backfeed charging in PRIMAVERA.
• Variance analyses of one-month look ahead plans & package wise impact on overall project
schedule.
• Preparation & submission of Engineering, Procurement & Construction activities in PRIMAVERA for senior management review.
• Effective utilization of tools in PRIMVARA software like Filter, Group & Sorts, Layouts for better
Project Monitoring & Control.
• Preparation, monitoring & controlling of detail L3-L4 level schedule of 132 kV Switchyard & Backdeed charging, Water System including DM plant commissioning.
• Preparation of invoicing plan for Civil Works, Erection & Commissioning, Supplies for Boiler, ESP,
STG & other packages on basis of approved Billing Break up & PRIMAVERA schedule.
• Preparation of monthly progress report for client.
• Preparation & updation of EPC S Curve on basis of PRIMAVERA schedule.
• Actively involve in OPEX project wherein each individual is assigned short-term project to study, analysis & suggest corrective action to modify or upgrade existing project
management processes. Successfully completed Opex Project (Release of RFC drawings of
STG Building & Water System) and received appreciation from top management.
• Master drawing list preparation & updation of project packages.
• Procurement analysis of Project packages.
• Coordination among engineering, procurement & construction group.
• Preparation of Site Presentation for Project.
• Responsible for DCS, Fire Alarm, Instrument Cable, Generator Transformer, Field instruments
packages under project management.
• Involve in preparation of Water requirement, Fuel requirement & Power requirement for commissioning of system.
• Preparation of proposal schedule & Cash inflow & outflow for bidding purpose. (4x300 MW SKS
TPP, 1x300 MW MARUTI TPP, 2X300 MW JPGPL TPP, 2X60 MW PT TRIA TALANG EMAS
BATAM TPP)


th th
Reliance Infrastructure Ltd (From - 20 Oct 2003 to 05 Feb 2010)

2.
Project Name - 2 x 300 MW Coal Based Butibori GCPP, Nagpur
Project Cost - 320 Million USD
Duration - 25 March 2008 to 05 Feb 2010
Role - Planning & Project Control Engineer (Project Mgmt Group - EPC)
Designation - Manager
Location - Corporate Office, Santa Cruz (E) Mumbai
Responsibilities
-
• Concept development, Preparation, Updation & Scheduling of Thermal Power Project Activities (L1
& L2 schedule for OSBL, ISBL & EPC activities) on PRIMAVERA Software version 6.0 for internal
customer, external customer & Lender
• Involve in concept development & preparation of L3 level schedule of main BTG package for site
execution along with site team. (Concept of constructability for BTG package)
• Concept development, Generation & Updation of S curves for Engineering, Procurement,
Construction & Overall Progress for entire project
• Concept development, Generation & Updation of Construction plans along with Construction S
Curves & Concreting quantity S curves for BOP civil packages.
• Concept development, Generation, Automation & Updation of Engineering & Procurement
Schedule for 164 packages.
• Concept development, Generation, Automation & Updation to measure engineering deliverables.
• Involve in coordination among Engineering, Procurement & Construction groups & carry out coordination meetings on Daily, Weekly & Monthly basis.
• Involve in Preparation & Updation of Daily MIS, Weekly MIS, Weekly Construction MIS, Weekly
Exception MIS & Monthly Progress Report for Internal & External Customers.
• Involve in preparation of Top Management Presentations focusing on Critical Issues of EPC & Management Support.
• Involve in development of manpower in planning dept.
2.A
Project Name - 4 x 600 MW Coal Based TPP (Shahapur MEGL - Alibaug)
Project Cost - 2400 Million USD
th th
Duration - 20 April 2007 to 24 Mar 2008
Role - Planning & Project Control Engineer (Project Mgmt Group - EPC)
Designation - Assistant Manager
Location - Corporate Office, Santacruz (E) Mumbai
Responsibilities
• Preparation, Updation & Scheduling of Pre Project Activities (L1 & L2 schedule for OSBL, ISBL & EPC activities) on PRIMAVERA Software version 5.0
• Concept development & Generation of S curves for Engineering, Procurement & Construction
• Budget preparation, Material Planning & Forecasting, Cash Inflow & Outflow, cost control.
• Generation of Daily, Weekly, Monthly MIS & Critical issues to Top Management.


2.B
Project Name - 220 MW X 4 Units of NPCIL ( Kaiga & Rawatbhata)
Project Cost - 42 Million USD
th th

Assistant Manager at Project Mgmt Group
  • India
  • July 2005 to April 2007

Duration - 25 July 2005 to 19 April 2007
Role - Planning & Project Control Engineer (Project Mgmt Group - EPC)
Designation - Assistant Manager
Location - Corporate Office, Santacruz (E) Mumbai
Responsibilities
• Preparation, validation & scheduling of the entire planning process of the 27 nos Main Electrical
packages (In Primavera Software P3e 5.0 version, Supply & Erection networks for 4 units of NPCIL -
EPS, WBS, OBS & RESOURCES)
• Material Planning & forecasting, Material Reconciliation, Budget preparation, Turnover, Cash inflow
& Outflow, Project monitoring & Control, Billing of Projects Materials
• MIS generation (Weekly & Monthly) & reporting critical issues to Top Management and NPCIL,
Generation of Engineering, Procurement & Construction S - curves for 4 units of 220 MW NPCIL
Project.
2.C
I have worked in Central Planning & MIS group (CEO CELL- Corporate Planning) for REL Delhi Distribution
Projects (2100 Cr) in NOIDA. I was looking after project control & monitoring of 250 Crore-Meter
Modernization Project. I prepared Project plan for Meter replacement project in P3e version & scheduled it. I
was also involved in MIS generation & reporting critical issues to top management. Prepared Asking rate
curve & contractor performance curve for project.
th th

at Nuclear Power Plant
  • India
  • November 2004 to July 2005

Duration - 20 Nov 2004 to 24 July 2005
Location - (Corporate office, Noida)
2.D
I worked in Nuclear Power Initiative department under generation div. I have taken Nuclear Power Plant
Familiarization Training at Rawatbhata 220MW x 4 units of Nuclear Power Plant, NPCIL for 3 months. I
was involved in techno economic feasibility study of Nuclear Power Plant for REL. Studied various Nuclear
technology from all over the world. Also involved in tariff calculation for NPP under guidance from seniors.
th

at Corporate Office, Santacruz
  • India
  • October 2003 to November 2004

Duration - 20 Oct 2003 to 19 Nov 2004
Location - (Corporate Office, Santacruz (E) Mumbai)

PRIMAVERA PROJECT MANAGEMENT SOFTWARE

Dy. Manager at Old Thermax House
  • India
  • to

Total working experience in Power sector 10.8 years.
th
Alstom Power Asia Pacific, Kuala Lumpur, Malaysia (From - 12 March 2012 to till date)

1.
Company - Renewable Steam Plant
st
Duration - 01 Mar 2014 to till date

Role & Designation - Project Planner (Global Support)

Location - Head Office, Kuala Lumpur, Malaysia
Responsibilities

• Preparation of Tender Schedule for Geothermal Plant, Solar Plant and Biomass Plant as per
Alstom standard procedures.
• Global Support to execution team in Kuala Lumpur, Baden (Switzerland) and Mexico team.
• Generated following Geothermal Project Tender Schedule.
a. 1x30 MW Karaha GPP, Indonesia.
b. 1x6 MW Northern Negros, Philippines.
• Generated different scenarios and their analysis for tender schedule.
• Efficiently utilized Activity codes, Group, Sort, Layout, Critical Path analysis with the help of
Primavera version 8.2.
• S curve generation for tender schedule.

2.
Company - Thermal Power - Gas
st th
Duration - 01 April 13 to 28 Feb 2014

Lead Tender Planner at Group & Sorts
  • India
  • to

Role - Lead Tender Planner

Designation - Planning Manager

Location - Head Office, Kuala Lumpur, Malaysia

Responsibilities
• Preparation of Tender Schedule for Combined and Open Cycle Gas Project as per Alstom standard
procedures.
• Tendering schedule - GT 26 X 6 Units for PETRONAS CPP Malaysia, GT-13E2X 2 Units Grati
MS CCP Indonesia, and KA24-1 MS Trans Asia Philippines.
• Generated different scenarios and their analysis for tender schedule.
• Efficiently utilized Activity codes, Group, Sort, Layout, Critical Path analysis with the help of
Primavera version 8.2
• S Curve generation for Tender schedule.
• Achieved "Best Project of the Year" award for my idea of "Net Plan of Commissioning" for improvement of the planning process under Alstom's "Experience Response System (ERS) "
initiative.
• Involved in basic initial set up of worksheet of "Earn Value Management for Engineering" project under ERS. This project was awarded "Best Project of the Month".
3.
Project Name - 1 x 400 MW CCPP, site at Singapore, TUAS Power.

Project Cost - 300 Million EURO.
th
Duration - 12 March 2012 to 31-Mar 2013

Role - Lead Project Planner

Designation - Planning Manager

Location - Head Office, Kuala Lumpur, Malaysia
Responsibilities

• Updation and scheduling of approximately 10, 000 activities with quality checks for internal project
schedule. Client schedule Updation.
• Critical path analysis according total float and critical path wise.
• Planning, organizing and coordinating skills in international environment.
• Implementation of commissioning Net Logic.
• Monitoring of Piping (Inch dia) and Electrical cabling activities (Cable pulling, Termination and testing activities)
• Monitoring and controlling of DTO, CTO, MHO, and TOP. Management of TOPs in schedule.
• Integration of contractor's schedule in Main project schedule.
• Effective utilization of WBS, Activity codes, Filters, Layouts, Group and Sort, User defined fields,
Baselines.
• Smooth & Continuous coordination with site planner and other EPC team members across different
countries in Alstom.
• Piping schedule integration of Large bore and Small bore. Electrical cabling activities (Power cable,
LV Cable, I&C cable and MV cable) addition to main project schedule for monitoring purpose.
• Biweekly and Monthly report preparation.
• Preparation of STECO report for Top Management.
• Monitoring, Controlling and Gap Analysis of Payment milestones, IFRS milestone and Project Key
dates.
• Monitoring & controlling key milestone dates to avoid contractor claims (Civil handover,
Mechanical handover, Material handover and Commissioning handover)
• Tendering schedule - GT 26 X 6 Units For PETRONAS CPP Malaysia, GT-13E2X 2 Units Grati MS
CCP Indonesia, KA24-1 MS Trans Asia Philippines
• On time performance (OTP), EV analysis, Dashboards, Quality Audit Document for Planning.


th
Thermax Limited, Pune (From - 06 April 2010 to 30-Jan 12)
1.
Project Name - 2 x 60 MW Indian Metal Ferro Alloys TPP

Project Cost - 100 Million USD
th
Duration - 06 April 2010 to 30 Jan 2012

Role - Planning & Project Control Engineer (Project Mgmt Group - EPC)

Designation - Dy. Manager
Location - Old Thermax House, Pune

Responsibilities
• Concept development, Preparation, Updating & Scheduling of Thermal Power Project Activities (L1,
L2, L3, L4 schedule for ISBL 5000-7000 EPC activities including Civil, Mechanical, Electrical & C&I
discipline) on PRIMAVERA Software version 6.1 for internal customer & client.
• Critical path analysis for Steam Drum Erection, Boiler Hydro Test, Boiler Light Up, Synchronization,
DM Plant Commissioning, Compressed Air System, Raw Water Reservoir, Water Treatment Plant,
Cooling Tower & Backfeed charging in PRIMAVERA.
• One month look ahead plan for Steam Drum Erection, Boiler Hydro Test, Boiler Light Up,
Synchronization, DM Plant Commissioning, Compressed Air System, Raw Water Reservoir, Water
Treatment Plant, and Cooling Tower & Backfeed charging in PRIMAVERA.
• Variance analyses of one-month look ahead plans & package wise impact on overall project
schedule.
• Preparation & submission of Engineering, Procurement & Construction activities in PRIMAVERA for senior management review.
• Effective utilization of tools in PRIMVARA software like Filter, Group & Sorts, Layouts for better
Project Monitoring & Control.
• Preparation, monitoring & controlling of detail L3-L4 level schedule of 132 kV Switchyard & Backdeed charging, Water System including DM plant commissioning.
• Preparation of invoicing plan for Civil Works, Erection & Commissioning, Supplies for Boiler, ESP,
STG & other packages on basis of approved Billing Break up & PRIMAVERA schedule.
• Preparation of monthly progress report for client.
• Preparation & updation of EPC S Curve on basis of PRIMAVERA schedule.
• Actively involve in OPEX project wherein each individual is assigned short-term project to study, analysis & suggest corrective action to modify or upgrade existing project
management processes. Successfully completed Opex Project (Release of RFC drawings of
STG Building & Water System) and received appreciation from top management.
• Master drawing list preparation & updation of project packages.
• Procurement analysis of Project packages.
• Coordination among engineering, procurement & construction group.
• Preparation of Site Presentation for Project.
• Responsible for DCS, Fire Alarm, Instrument Cable, Generator Transformer, Field instruments
packages under project management.
• Involve in preparation of Water requirement, Fuel requirement & Power requirement for commissioning of system.
• Preparation of proposal schedule & Cash inflow & outflow for bidding purpose. (4x300 MW SKS
TPP, 1x300 MW MARUTI TPP, 2X300 MW JPGPL TPP, 2X60 MW PT TRIA TALANG EMAS
BATAM TPP)


th th

Manager at Corporate Office, Santa Cruz
  • India
  • to
Concept development, Generation & Updation of Construction plans at Construction & Overall Progress
  • to
Concept development at Generation & Updation of Construction
  • to
Concept development, Generation at Automation & Updation
  • to
Concept development, Generation, Automation & Updation at Procurement & Construction
  • to

Total working experience in Power sector 10.8 years.
th
Alstom Power Asia Pacific, Kuala Lumpur, Malaysia (From - 12 March 2012 to till date)

1.
Company - Renewable Steam Plant
st
Duration - 01 Mar 2014 to till date

Role & Designation - Project Planner (Global Support)

Location - Head Office, Kuala Lumpur, Malaysia
Responsibilities

• Preparation of Tender Schedule for Geothermal Plant, Solar Plant and Biomass Plant as per
Alstom standard procedures.
• Global Support to execution team in Kuala Lumpur, Baden (Switzerland) and Mexico team.
• Generated following Geothermal Project Tender Schedule.
a. 1x30 MW Karaha GPP, Indonesia.
b. 1x6 MW Northern Negros, Philippines.
• Generated different scenarios and their analysis for tender schedule.
• Efficiently utilized Activity codes, Group, Sort, Layout, Critical Path analysis with the help of
Primavera version 8.2.
• S curve generation for tender schedule.

2.
Company - Thermal Power - Gas
st th
Duration - 01 April 13 to 28 Feb 2014

Concept development & Generation of S curves at Procurement & Construction
  • to

Total working experience in Power sector 10.8 years.
th
Alstom Power Asia Pacific, Kuala Lumpur, Malaysia (From - 12 March 2012 to till date)

1.
Company - Renewable Steam Plant
st
Duration - 01 Mar 2014 to till date

Role & Designation - Project Planner (Global Support)

Location - Head Office, Kuala Lumpur, Malaysia
Responsibilities

• Preparation of Tender Schedule for Geothermal Plant, Solar Plant and Biomass Plant as per
Alstom standard procedures.
• Global Support to execution team in Kuala Lumpur, Baden (Switzerland) and Mexico team.
• Generated following Geothermal Project Tender Schedule.
a. 1x30 MW Karaha GPP, Indonesia.
b. 1x6 MW Northern Negros, Philippines.
• Generated different scenarios and their analysis for tender schedule.
• Efficiently utilized Activity codes, Group, Sort, Layout, Critical Path analysis with the help of
Primavera version 8.2.
• S curve generation for tender schedule.

2.
Company - Thermal Power - Gas
st th
Duration - 01 April 13 to 28 Feb 2014

Education

Diploma, THERMAL POWER PLANT ENGINEERING
  • at NATIONAL POWER TRAINING INSTITUTE
  • August 2003
Diploma, STEAM ENGINEERING
  • at Steam Engineering Center, Forbes Marshall, Pune
  • August 2001
Bachelor's degree, MECHANICAL ENGINEERING
  • at RAJIV GANDHI COLLEGE OF ENGINEERING RESEARCH TECHNOLOGY
  • September 2000
High school or equivalent, SCIENCE MATHS
  • at Nagpur University
  • June 1996

12TH SECONDARY SCHOOL

Specialties & Skills

Languages

English
Intermediate
Hindi
Expert