عزيز عبد العزيز, Field Operator

عزيز عبد العزيز

Field Operator

Petro Rabigh Refining and Petrochemical Company KSA

البلد
باكستان
التعليم
بكالوريوس, engineering
الخبرات
21 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :21 years, 7 أشهر

Field Operator في Petro Rabigh Refining and Petrochemical Company KSA
  • المملكة العربية السعودية
  • أشغل هذه الوظيفة منذ مايو 2015
Senior Operator CCR Operator في Socar Aurora Fujairah
  • الإمارات العربية المتحدة - الفجيرة
  • ديسمبر 2012 إلى مارس 2015

CCR Operator, Field operator

Production Operator في Engro
  • باكستان - كراتشي
  • يوليو 2007 إلى ديسمبر 2012

Responsible for the Field / Control Room Panel Operations, Coordination & Supervision of Central & Satellite “Engro Vopak Terminal Ltd is an ISO 9001 QMS, EMS 14001, OHSAH 18001, CDI-T & ISPS certified state of the Art Bulk liquid chemicals & Gaseous products storage Terminal at port Qasim Karachi.
EVTL have its own sophisticated Jetty and 20 storage tanks, spheres, tanker loading bays, Nitrogen distribution network, direct pipe line transfer to local customer’s network and weight bridge system at the following facilities to load unload cargo ships, road tankers in safe and efficient manners.
Ethylene Storage & Jetty operations.
 Vinyl Chloride Monomer storage & Jetty operations (VCM).
Liquefied Petroleum Gas Storage & Jetty operations (LPG).
 Acrylo Nitryle Storage & Jetty Operations. (ACN )
 Mono Ethylene Glycol Storage & Jetty operations (MEG).
 Paraxylene/ Acetic Acid Storage & Jetty operations (PX/AA).
 Utilities sections.
Multiplex Boil-off Gas Compressor (3 Stages), Glycol Water Exchanger, Main Cryogenic Heat Exchanger, , Vaporizers & Condensers, Back Up Section having Vaporizers & Multi Stages Cryogenic Centrifugal Pumps, Liquefied Gases Storage Section, Analyzer Shelter, Loading Pumps.

PLANT OPERATOR في Oil and Gas Development Company OGDCL
  • باكستان
  • سبتمبر 2002 إلى يوليو 2007

Oil &Gas Development Company LTD (OGDCL) Qadirpur Pakistan
September 2002 - July 2007 (4years 9 months) Pakistan
 Worked as Plant Operator (Operations & Commissioning operator) with during commissioning, start up & operations phase at OGDCL Qadirpur Pakistan, Natural Gas Treatment Plant, Capacity enhancement activities of Qadirpur gas processing plant started in Jan. 2003. I took part an active process representative in the erection, pre-commissioning and commissioning activities with UOP experts. The new plant taken from UOP used modern pre-treatment technology.
 Each Unit has the following Features:
 A gathering system of slug catcher to collect fluids from the well side.
 Two gas turbines of 10MW each used for driving 4 stages Permeate Compressors (Nouvo Pig none) equipped with modern PLC control system (Suvimac II)
 Natural Gas Dehydration through Tri Ethylene Glycol (TEG).
 Condensate stabilization production of 1200 barrels/day.
 Instrument air compressor, power generators with capacity 824 kw of each.
 Refrigeration package with chilling capacity of 14.2MMBTU/Hr.
High Speed & Pressure Reciprocating Compressor, Gas Engine 1680 HP/1348 kW (Waukesha, VHP Series Four, 12 Cylinders), Separators / Scrubbers, Heat Exchangers (Radiators / Fin fan Coolers) Having Flow / Pressure of 600 MMSCFD / 1200 Psig.

الخلفية التعليمية

بكالوريوس, engineering
  • في SALU
  • يوليو 2006

➢ 1997-1998- Higher Secondary Certificate (Pre-engineering) in 2nd Division. ➢ B.Sc with (Physics, Chem, Math's) SALU SINDH

الثانوية العامة أو ما يعادلها, Eng,Chemistry,Maths
  • في BISE SUKKUR
  • سبتمبر 1998

Specialties & Skills

Operators
Field/Utility Operator
Plant Operator Control Room Operator
AIR COMPRESSOR
CIRCULATION
COLLECTION
COMPRESSORS
CONTROL ROOM
CONVEYOR

اللغات

الأوردو
متمرّس
الانجليزية
متوسط

العضويات

Engro
  • Fire Squad Member
  • July 2007

التدريب و الشهادات

Apprenticeship (الشهادة)
تاريخ الدورة:
September 2001
صالحة لغاية:
July 2002
RECEIVED CERTIFICATE (الشهادة)
تاريخ الدورة:
April 2011
صالحة لغاية:
April 2011
Received (الشهادة)
تاريخ الدورة:
June 2010
صالحة لغاية:
June 2010