Additional Deputy Director (PMU)
Genco Holding Company Limited (GHCL)
Total years of experience :14 years, 4 Months
Currently working in PMU team of 1, 320 MW, Coal Fired Power Project, Jamshoro.
Liaison with Project Implementation Unit (PIU), Contractor, Consultant, ADB (donor), Ministry of Energy (Power Division) and other government stake holders i.e. PEPCO/PPMC, Planning Commission.
Dealing with NCRs, change requests, site visits to measure/physical project progress, preparation of project progress reports
Working as a member of Project Management Unit (PMU) for 2*660 MW Coal Fired Power Project, Jamshoro. Also working as Quality Control Engineer.
Working on Integrated Energy Planning (IEP) Tool on behalf of GHCL launched by Ministry of Planning funded by USAID.
Experience of Heat Rate Tender execution and implementation for improvements / remedial measures to enhance Heat Rate as recommended by Contractor for all GENCO’s.
Worked as “Member of Fact Finding Inquiry Committee” on Fire Incident at Lakhra Coal Fired Power Plant from 24-28 July, 2017.
Worked with the Company Secretary and have an experience to call BoD, preparation of minutes of meetings, extracts of meetings.
Tender Preparation, management of Tender Opening & Evaluation.
Coordinate between CEO, GENCO Holding Co. Ltd and all CEO’s of GENCO-I, GENCO-II, GENCO-III, GENCO-IV & RE/CE Nandipur Power Project regarding technical matters (e.g. Plant Overhauling/Major Inspection, Minor Inspection, Procurement and Fuel etc).
Represent GHCL in briefings to Minister of State of Water & Power, Government of Pakistan about questions arises in National Assembly and Senate regarding Thermal Power Plants working under Ministry of Water & Power.
Responsible to prepare Minutes of meeting conducted with foreign delegates, contractors or among CEO's of Thermal Power Plants.
GENCO-II, Power Generation Co, 415MW CCPP, Thermal Power Station, Guddu (GHC)
Working as “I&C Engineer”, January 2011 - Present
Responsibilities:
I&C maintenance work at Siemens Gas Turbine Model V94.2, HRSG’s with High Pressure Boilers, DCS Base Control System,
Steam Turbine, chemical plant and pump house.
Worked on pressure/proximity switches, pressure/level/flow transmitters, vibration sensors, flame sensors, signal conditioners, thermocouples, RTD’s, solenoid/pneumatic valves and actuators
Worked on Honeywell recorders, Endress+Hauser transmitters, functional/circuit drawings regarding I&C and electrical scope of work. Assist in the development and maintenance of operational standards and procedures
Well versed experience in maintenance of Power and Distribution Transformers, SIEMENS TELEPRM ME, ISKAMATIC and SIMATIC S5 Control Systems
Conduct calibration, testing and servicing of power plant instruments in accordance with manufacturer’s procedures and plant-established intervals and acceptance criteria
Plan and execute projects from development and operations perspective. Ensure smooth operation, safe start up & shut down
Diagnose malfunctions at equipments/plant auxiliaries & effectively communicate to Deputy Manager (Operation) and also to concerned maintenance sectional heads
Review of the physical layout of I&C equipment, raceway and grounding plans related to the various facilities within the plant.
Worked on washing of Gas Turbine Compressor
Maintain isolation of equipments for planed & emergency maintenance and normalization of plant
Coordinate and issue instruction to the maintenance staff during normal and emergency condition
Provide leadership accountability for facility engineering issues and ensure resolution by coordinating resources that may include various in-house technical staff and/or consultants or contractors.
Provide technical support and guidance on operations validation, development and implementation and facilitate maintenance team in achieving business goals. Document current and future configuration processes and policies
Collect and review system data for capacity and planning purposes
Plan, test, maintain and support smooth backup and recovery, business continuity and disaster recovery solutions
Ensure correct implementation of the work according to the technical specifications
Draft daily and monthly operations report
Key Achievements
Minimized the tripping via timely attending faults without any delay and guiding the maintenance staff
Rectified the Gas Turbine Control Valve fault
Helped the other maintenance sections by timely indicated the faults after consulting the control drawings
Independently performed the minor inspections of Gas Turbine
Efficiently traced the different cycles e.g. Feed water cycle, lube oil cycle
Assist the operation section by working along with them
SIEMENS Pakistan Engineering Co. (Pvt.) Ltd
Worked as “Sales Engineer”, December 2009 - January 2011
Responsibilities:
Identified and followed up sales activities that are necessary for the achievement of the determined targets. Provided technical back up from initial enquiry stage to contract completion
Handled public tender issued by WAPDA for Transformers and Switchgear
Analyzed tender requirements issued by WAPDA/clients and prepared Bill of Quantities (BOQ) for tender
Handled enquiries/technical discussions with customer regarding scope of work/projects and developed appropriate sales channels, technical and maintained commercial support and followed up according to the sales plan
Liaison with Production Department and designed commercials and technical offers
Knowledge of Wapda & Siemens standards operating procedures regarding Power, Distribution & Instrument Transformers, LV, MV & HV Switchgears, Circuit Breakers and Surge Arrestors
Knowledge of Network Study (Short Circuit Calculations and Load Flow Analysis)
Development and strengthening of business relationships with customers, agents and distributors
Reported to the management about actions and situations regarding customers and sales channels
Identified and created new business opportunities for business growth
Provided technical support to customers in terms of pre-installation, designing dialysis hall with electrical specifications and post installation services on break down call
Key Achievements
In 2009 fiscal year, sales were 24 million. After my joining at Transformer Department, sales in 2010 fiscal year were 104 million.
Converted all hard sales data in soft format
Prepared list of potential customers of Pakistan in soft format
3 months orientation at Switchgear Department
University of Engineering & Technology Lahore, Pakistan Bachelor of Science in Electrical (Power) Engineering, %age: 71
Higher Secondary School Certificate, 2004 %age: 75