Civil Project Engineer
Tristar Engineer & Construction
مجموع سنوات الخبرة :12 years, 7 أشهر
Project: Riyadh City South - Phase 03
Client: MODON Employer: KBR Consultant: ATKINS
Work Period: October/2020: till now
Position: Senior Project engineer at Tristar Engineer & Construction
Responsibilities:
All infra-structure and asphalt activities.
(sewerage network 75500 m, storm network 69600 m, water network 106100 m, irrigation 5500m and roadworks 543300m2)
Project : Ghayathi East &south infrastructure
Client : Department of urban planning and municipalties
Employer : Musanada
Consultant : Altorath International
Work Period : October/2019: october/2020
Position : Project engineer at Bin Hafeez Gen. Cont. l. l. c.
Responsibilities:
All infra-structure and asphalt activities (Sewer 5447 m, storm water 10786 m, Water 8116 m, , Communications 3000 irrigation 6809m, curbstone 8000m and interlock 7000m2)
Project : Ghweifat Border post
Client : General Authority of Ports, Borders and free zone security
Client engineer: Musanada
Consultant : Salfo
Work Period : September / 2018: octoper 2019
Budget : 340, 000, 000 UED
Position : Senior site engineer at Bin Hafeez Gen. Cont. l. l. c.
Responsibilities
All infra-structure and asphalt activities (Sewer 2000 m, storm water 13000 m, Water 2400 m, , Communications 5500 m, cctv 4000m, curbstone 50000m and interlock 40000m2)
6 ) Project : vida EL alamein hotel
Client : Emaar Dubai
Client engineer: Mirage
Consultant : AN& Partners
Work Period : October / 2017: september /2018
Budget : 500, 000, 000 LE
Position : Senior site engineer at
Responsibilities
Managing 10 mega chalet (Partially Demolishing, Repair, Finishing)
Coordination between shore activities and Egyptian Army authority (coast guard)
Plan, order and supervise the execution of works
Implement project quality and safety plan.
- ) Project : Army Terminal West
Client : Egyptian air force
Client engineer: Egyptian Army corps of engineer
Consultant : Engineering Consultant Group (ECG)
Work Period : September / 2015:November/2017
Position : Senior site engineer at
Responsibilities
All infra-structure activities (Sewer 5437 m, firefighting 6829 m, Water 6535 m, Irrigation pipe line 6841
m and MV 39000 m, LV 41630 m, Communications + navigation network 53000 m Street light system
48440 m and 543 Ball light column ), 6000 m reinforcement & metal security fence and 6600 m2 waste water pond .
Coordination between road activities and landscape activities and infrastructure activities.
Coordination between security fence activities and Egyptian Army authority
Civil works (excavation, pipe setup, testing, RFT, Casting, Repair).
Review all design and shop drawings, Specifications, and project requirements.
Plan, order and supervise the execution of worksPosition : senior Site Engineer
- ) Project : King Abdullah Economic City
Client : EmaarMisr
Consultant : Engineering Consultant Group (ECG)
Budget :120, 000, 000 LE
Period: November / 2014: may/2015
Position : Site Engineer at Peaks Construction
Responsibilities
E#1 - Infra structure (storm, Sewer, Water and irrigation pipe line
• Civil works (excavation, pipe setup, testing, RFT, Casting & Repair).
all asphalt work
• Administration work (coordinate between all activities and clams).
• Review all design and shop drawings, Specifications, and project requirements.
• Plan, order and supervise the execution of works.
Project : Developing Hurghada International Airport
Client : Egyptian Airports Company
Consultant : Dar Al-Handasah
Budget : 2, 600, 000, 000 LE
Work Period : December/ 2013 to October/2014
Position : Site Engineer at
Responsibilities
12 pipe culvert prestressed concrete pipes (about 2500 m) & 1 box culvert (500m) from excavation to finishing work including :
• civil works ( pipe setup, Formwork, RFT, Casting, Repair & pipe tastes ) .
• Administration work (prepare invoice, coordinate between all activities).
• Review all design and shop drawings, Specifications, and project requirements.
• Prepare daily reports for work progress.
• Implement project quality and safety plan.
Client : Arabian centers
Consultant : Engineering Consultant Group (ECG)
Budget : 2, 819, 000, 000 LE
Work Period : August/2013 - till now
Position : Site Engineer at STM
Responsibilities
• 2nd Phase in mall of Arabia from excavation to finishing work including
• civil works (Formwork, RFT, Casting & Repair)
• finishing work ( Masonary, Plaster, Ceramic, Marble, Painting )
• Administration work (prepare invoice, coordinate between all activities)
• Review all design and shop drawings, Specifications, and project requirements.
• Plan, order and supervise the execution of works.
• Implement project quality and safety plan.
Project : Marassi - Sidi Abdel Rahman Resort Community
Client : Emaar Misr
Consultant : Engineering Consultant Group (ECG)
Budget : LE 240, 000, 000
Work Period : October / 2011: August/2013
Position : J Site Engineer
Responsibilities:
All the civil and finishing works.
Review all design and shop drawings, Specifications, and project requirements.
Plan, order and supervise the execution of works.
Prepare daily reports for work progress.
Implement project quality and safety plan.