Project manager
RIO Company for trading and contracting
مجموع سنوات الخبرة :0 years, 0 أشهر
2012 to 2015
Following duties shows my updated responsibilities and duties in the above mentioned company through mentioned period as follows:
All office works (reports, inspection requests, concrete pouring cards, special/event reports, time schedules, charts, curves, pictured reports, E-mails.. etc.).
Quantity surveying, invoices preparation and check and as built drawings.
Site engineer (supervision and management).
Project manager for water tank project with full responsibility and authority. This project had several activities such as concrete works, asphalt works, ties & kerbstone works, lighting poles and bollards, pumps and P.W networks, irrigation networks, external and internal finishing and many other activities.
2011 to 2012
As a fresh engineer at that time, I have challenged myself and decide to be deeply involved with following duties in the above mentioned company through mentioned interval:
Civil / site engineer with supervision on 5 on-going projects in the same time.
Survey control.
Reports, quantities, shop drawings and E-mails.
Irrigation and Hydraulics Branch (Hydrology Project)