جوني سامسون, Lead/Sr. Construction Engineer

جوني سامسون

Lead/Sr. Construction Engineer

Wood PLC

البلد
الكويت - الزور ميناء سعود
التعليم
بكالوريوس, Civil Engineering
الخبرات
35 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :35 years, 6 أشهر

Lead/Sr. Construction Engineer في Wood PLC
  • الكويت - الزور ميناء سعود
  • أشغل هذه الوظيفة منذ يناير 2017

• I was able to monitor the civil works construction contractor EPC-JV/Sub-contractor for the construction of these units, 3-ARDS units, 3-CDU units, 1-SGU unit, 3-DHT units, 2-NHT units, 2-KHT units & 1-HOC unit, with the following scope of responsibility

• Delegate civil work boundaries with my fellow Construction Engineers (Civil discipline)
• Assisting fellow civil works construction engineers with their respective reporting and progress mark-up
• Monitoring and coordinate activities of the construction contractors to ensure that all construction activities are in compliance with approved procedures, drawings, project shell DEP and applicable codes / standard practice.
• Monitor and mark-up the Contractor EPC-JV slip-page activities in-line with their Two (2) month look ahead schedule
• Assisting the EPC-JV / Sub-contractor functional responsibility for all supervision and Construction personnel.
• Review of EPC-JV monthly construction bill of quantities and verification against actual site condition
• Monitor and verification of de-watering activities on site
• Progress mark-up in plot plan drawing/s
• Monitor the contractor EPC-JV daily activities and up-dating it in share folder
• Monitor the contractor EPC-JV weekly activities and up-dating it in share folder
• Ensuring all civil & structural related activities are complete and in compliance with approved IFC/Standard drawings, Shell DEP Specifications, and Code of Practice.
• Ensuring the quality civil & structural construction activities and to monitor all activities in compliance with approved QA/QC Procedure & Inspection and Test Plan
• Ensuring record for Quality Observation/s for any non-compliance discovered in site and verification of their corrective action which is in in-line with Project QA/QC standard practice
• Ensuring all HSE site observation/s record are on the record, to be able to let contractor made aware of all HSE site issues and to rest-assured that, all their corrective measure, recommendation & action are in accordance with their approved HSE submitted procedure and in compliance with PMC/PMT HSE standard practice.
• Ensuring that HSE compliance with all construction related activities regardless of discipline are in compliance with the Project approved HSE procedure/plan and WOOD/KIPIC/KNPC HSE standard.
• Ensuring all HSE preventive measure at site and being vigilant against HSE project requirement/s

Construction Sup في Excelerate Energy
  • عمان - صلالة
  • يناير 2016 إلى أكتوبر 2016

I was able to monitor the construction contractor for the LNG Terminal Project activities ie., New LNG Platform(Pile/PC base/Cast in-situ Platform Slab & Catwalk), New LNG Mooring Dolphin (Pile/PC base/Cast in-situ Slab & Catwalk), Access Trestle(Pile/Pile cap/Cast in-situ pile cap/Trestle steel beams/PC slabs/Crash barriers), Pipe sleeper foundations, Metering skid foundation, Water bath heaters foundations, Road crossing foundations by type, Back pressure control valve, Marine civil works, Below ground road crossing works.
-Monitoring and coordinate activities of the construction contractors as to ensure that all construction activities are in compliance with approved procedures, drawings, project specs & applicable codes & standard.
-Monitoring and coordinate activities and assure in compliance with approved procedures, drawings, project specs & applicable codes & standard.
-Develop and maintain functional responsibility for all construction personnel.
-Monitors contractors Project quality and EHS performance.
-Technically assisting the contractor for any engineering field change vide TQ Technical Query;
-Review of construction documentation generated by the Construction contractors.
-coordinating with the contractor via, mechanical completion, functional checks and commissioning phases so that the systems will be fully functional and operational for start-up purpose.
- Prepare and explain the significant condition of the entire project

Construction Superintendent في Petrochina /Exida SP
  • يوليو 2013 إلى أبريل 2015

Construction Superintendent : Central Processing Facility-1 Brown Field (2-Crude Oil Tanks “30, 000CuM capacity each”, 2- Fire Water Tanks “5000CuM capacity each”, Gas Boot Foundation, Tank Dike Wall, Guard, Roads, Pump Station, 33 Kva Substation and Liquid Prepation Station ), Central Processing Facility-2 Green Field ( Evaporation Pond, OHTL-Over Head Transmission Lines, SWP/2-Service Water Plant, GRS-Gas Receiving Station, PWP-Produce Water Plant, FSF-Field Service Facility ) and Gas Processing Plant that composed of FCCU “Fluid Catalytic Cracking Unit” ie., Hydrocarbon convert/breaks into different characteristics of gasoline for cars, cooking gas and lubrication oil by means of chemical process.

Construction Superintendent في FLUOR MIDEAST LIMITED
  • الإمارات العربية المتحدة
  • يناير 2013 إلى يونيو 2013

Construction Engineer : For Package 2 - Units-0730 ( Central Refrigeration ), 0731, 0732, 0733 & 0734 ( Solvent Regeneration ), Unit-0751, 0752, 0753, 754 ( Sulphur Recovery and Tail Gas Treating Units - Fire Proofed Cracking Unit Equipment & Structures ) and Unit-780 ( Power Generation ) covered the following activities Buildings ie Substation & Instrument/Electrical Station ( HVAC, Fire Fighting, PC/Cast-in place Structures, Transformer yards, U/G Oily sewer piping & Fire Proofed Steel Structures ) and Civil ie. “Equipment foundations, Pipe racks, E/I & piping trenches, Paving, Oily Manholes, Catch basins, FW Valve pits, Pumps, Skids, Vessels, Exchanger Structures - Cracking”

Construction Supervisor في Qatar Petroleum supplied by NES Global Talen
  • يوليو 2009 إلى ديسمبر 2011

( Supervise HV & LV Substations buildings, Main office buildings, Communication tower building & steel works that compose of the following ie., HVAC, Fire Fighting & Alarm, Lost Prevention & Building Services interfaced with electrical equipment and central BAEMS controller )
I was able to assigned as Construction Supervisor in the Project, that composed of the following scope of responsibilities.

Supervising the EPIC Contractors during the execution phase of construction activities at construction project site.
Participating in reviewing detailed design drawings, method statements, material requisitions, and etc.
Coordinating mobilization of contractors on site.
Supervising and approve construction activities and co-ordinate various aspects of project construction including inspections, material submissions and working drawings from contractors, and processing documentation as required.
Daily monitoring on contractor’s staff and work carried out during the previous day in order to ensure compliance with prescribed contractual specifications.
Handling all aspects of Mechanical Construction activities including site investigations, site surveys and etc.
Supervising installation of Fire Electric/Diesel Pumps and Jockey pumps.
Supervising installation of deluge system piping works and underground fire fighting piping works.
Supervising installation of Fire water tanks.
Closely supervised the Sprinkler System.
Maintaining a daily record of progress (daily diary) noting special comments. Reports to supervisor work anomalies or contractual deviations committed by contractor personnel and recommend corrective actions.
Signing work permits on behalf of QP and to ensure that contractors compliance with conditions fixed on consolidated work permits
Participating in development of as-built drawings/documentation and dossiers
Preparing Punch list ie., MC/Pre-com/Commissioning for finished work prior to hand over to QP by contractor by paying special attention to all equipment including Quality checks.
Interfaced works with other QP Construction Supervisors (Elect./ Arch / Instrument).
Reporting to QP Lead Construction Supervisor on main issues, events at site, progress reporting, trends and recommendation for improvement.
Supervising contractor’s work that is in progress, inspecting work, reporting problems and preventing accidents occurring as a result of negligence, by enforcing QP safety standards on the work site.
Interfacing report with the QC Inspector on quality related matters.
Interfacing report with the HSE Supervisor on safety related matters.
Prepare daily report of activities and inform QP/asset holders( as per approved distribution matrix) of the progress/constraints and look ahead.
Physical checks to all Project permanent materials vide RFI/MRR in conformance to approved Material Approval Request & Material Requisition / Technical Bid Analysis.
Attending as client party inspection activity with manufacturer / vendor & equipment calibration.
Promote and drive the involvement of Construction in areas of schedule, preliminary execution planning, and cost estimating in line with the project scope of works.
Assisting the contractor with all related activities in Project Mechanical Completion, Pre-commissioning & Commissioning of the project.
Stands as reliever during rotation period of project colleagues.
Attended e-CPW training regularly

Construction Superintendent في FLUOR MIDEAST LIMITED
  • قطر
  • ديسمبر 2006 إلى يوليو 2009

RASGAS / FLUOR RL3 Common Off Plot Projects under
PM of RasGas located

Senior Project Engineer في KHARAFI NATIONAL
  • الإمارات العربية المتحدة
  • مايو 2006 إلى سبتمبر 2006

Construction of EG2 with Project No. of 01EG02 under the TKOC The Kuwait Olefins Company

Project Management في Construction of Effluent Water Disposal Plan
  • مايو 2005 إلى أبريل 2006

-1090 Project with transition lines through GC's under

Civil/Structural Engineer في PMC of PARSONS / FLUOR
  • الإمارات العربية المتحدة
  • مارس 2002 إلى أبريل 2005

Construction of New BS-131 with Interconnection lines through GC's & BS-130 under KOC

Civil/Structural Engineer في RPMAA Re-Construction Project of KNPC Mina Ahmadi Kuwait under PMC of Foster Wheeler Ltd
  • يوليو 2001 إلى مارس 2002

Responsible for Site Civil Construction / Eng'g work of the Crude Distillation Unit (CDU), Common Pipe Rack (CPR) and Continuous Catalitic Rheniformer Unit ( CCR ) Reinforced Concrete Foundations & Steel structures incorporating all Construction activities as per AFC Drawings., Project Specifications, Approved Procedures and Standard with the anticipation of delay with respect to Contract Schedule.

Human Resource
  • الفلبين
  • نوفمبر 2000 إلى يونيو 2001

Responsible for evaluating worker for an overseas agency such as Construction Staff & worker for Refinery Construction Project in the Middle east & Taiwan.

Project Engineer في Fluor International Limited Kuwait with KOC "Kuwait Oil Company
  • إلى يناير 2001

I was able handle Civil & Building works & to coordinate UG Piping, Mechanical, Electrical & Instrument works of the Project in relation with Civil works to the following Plant & Gathering Centres

Civil/Structural Engineer في Experienced with SAMSUNG Engineering & Construction Co., Ltd
  • أكتوبر 1999 إلى أكتوبر 2000

Ruwais Adnoc Sulphur Expansion Phase II Project Ruwais Abu-Dhabi UAE under PMC of Technip

Structural Engineer في MRT-NEL-C703 Mass Rail Transit Project Singapore under consultancy Land Transport Authority (LTA)
  • مارس 1998 إلى أغسطس 1999

Responsible for both Civil & Structural Construction work for the Construction of Sub - Structure Cut & Cover Tunnel

Project Engineer في Rigid System Incorporated PAOQ Phil. Army Officers Quarter 28 Units 4Storey Housing under Consulting of Techphil Inc
  • يناير 1998 إلى مارس 1998

Responsible for the Management of all Project Execution of 28 Units 4Storey Housing Project under PAOQ Housing Located at Fort Bonifacio Philippines with the Consulting of Techphil. Coordination is part of my duty as far as the whole Project is concerned Particular in making Project Detail schedule and anticipation of any Construction work delay.

QA/QC Engineer في Experienced with SHINWHA Engineering and Construction Co., Ltd
  • أغسطس 1996 إلى سبتمبر 1997

Responsible for Civil QA/QC Inspection & Engineering activity for the Construction of Pelleting & Silo Super Structure, Equipment Foundations, Pipe Racks Fdns. Pipe Supports Foundation, MH, Paving, U/V Ditch, Rds. and Fence Foundation ensuring all Construction activity are as per AFC Drawing, Project Spec., Approved Procedures and Standard codes with the Final Hand-over of the Project through clearing of Punch-list.

QA/QC Manager في EDC Brine Expansion Project of SADAF Jubail K.S.A. Under PMT/PMC Fluor Daniel and Brown & Root Saudi Ltd
  • أكتوبر 1994 إلى يوليو 1996

Responsible for Preparing QA/QC Manual of the Project corporate to Project Specification with all necessary Procedure required by the Project from Civil, Electrical and Piping by Managing Inspection for Civil, FW Pipeline, Electrical QA/QC Inspection/Documentation activity and Final Document Handover of the whole Project Ensuring all Construction activity are as per AFC Dwgs. Corporate to Project Specification & Standard.

QA/QC Engineer في Bechtel
  • الإمارات العربية المتحدة
  • ديسمبر 1993 إلى أكتوبر 1994

Polyester Plant Project of Ibn Rushd II Yanbu K.S.A under Managing Contract of Saudi Arabian

Construction Engineer في Nar-Sam Civil Construction Company National Panasonic
  • الإمارات العربية المتحدة
  • فبراير 1993 إلى نوفمبر 1993

Responsible for the Management of Sub-Contract Work Execution of the Aircon Manufacturing Building that composed of Carpentry work, Mason work, Steel work, Ceiling work &

QC Inspector في Consultancy of SAFCO Eng'g. & Chiyoda Corp
  • الإمارات العربية المتحدة
  • يوليو 1991 إلى ديسمبر 1992

Plant Project SAFCO

Chief Surveyor في Experienced with Abu Al
  • الإمارات العربية المتحدة
  • يوليو 1988 إلى يونيو 1991

Co., Ltd

Project في AM Oreta Engineers, Builders & Contractors
  • الإمارات العربية المتحدة
  • مارس 1991 إلى يونيو 1991
Surveyor في PIC A-1042 Utilities to Al-Nakheel & Al-Oyoun- under Directorate of Royal Commission & consultancy of Saudi Arabian Parsons
  • يونيو 1986 إلى يونيو 1988

Responsible for over-all Survey requirement of the whole Project Civil work that composed of the following Project workscope Potable water PVC Pipeline, FRP Sanitary Gravity line, Telecom/Electrical Duct bank w/ Manholes, Box Culverts, FRP Forcemain Sewer, FRP Reclaim water Pipeline, FRP Process water Pipeline, Pump Station M/H, Valve Boxes, Wash-out chamber & Asphalt Concrete roads. Ensuring all Project Survey Location and Level are as per AFC Drawings incorporating all changes to final Drawings for As-built.

Project Field Engineer في Novaliches Q.C. Philippines
  • إلى

Responsible for Project work Execution for the Construction of La-mesa Dam Phase II Project with the capacity of 900Million liters production of drinking H2O ensuring all Construction activity are as per AFC Drawings Corporate to the Project Specification.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في University of the Assumption
  • يناير 1985

Specialties & Skills

Quality Control
Engineering
Project Management
Consulting
Construction
CUSTOMER RELATIONS
DOCUMENTATION
ENGINEERING
ESTIMATING
GRAPHIC DESIGN
MICROSOFT WORKS
QUALITY CONTROL
SPECIFICATION
UTILITIES