kareem abboud, PLANNING ENGINEER

kareem abboud

PLANNING ENGINEER

TOUBAR CONTRACTING (Egypt branch)

البلد
المملكة العربية السعودية - جدة
التعليم
بكالوريوس,
الخبرات
4 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :4 years, 2 أشهر

PLANNING ENGINEER في TOUBAR CONTRACTING (Egypt branch)
  • مصر - القاهرة
  • مايو 2012 إلى يونيو 2014

- Defined project scope of work and WBS
- Develop Time schedule (Different Levels)
- Resources & Budget Loading on schedule
- Establish Performance Measurement metrics
- Monitoring & collect actual performance data
- Use Earned Value Technique to evaluate projects status
- Recommend Suitable Correction Action
- Report Status of Projects to top management

SITE ENGINEER في Karawia Contracting Company
  • مصر - بورسعيد
  • أغسطس 2005 إلى يوليو 2007

Karawia Contracting is located in port-said and have a lot of main projects in there

My responsibilities are:
• Studying the work plan submitted by the contactor and suggests any modifications.
• To watch and inspect the construction work and assure that it is done in full accordance with the drawings, technical specifications and bills of quantities.
• Supervising the works on site in accordance with the contract documents and using the template and procedure established by the consultant.
• Inspecting and testing materials prior to their use at site as per sample approved by the consultant and ensuring removal of rejected material out from site.
• Checking and testing of completed works before they are covered by the contractor.
• Checking and ensuring that the site is arranged as per the site management plan and that all measures are taken for site safety and the safety of the third parties in the vicinity of the site
• Ensuring that health and safety measures are adopted and followed to the full extent and
• prepare weekly report and suggest and instruct additional safety measures if needed

I was a Site Engineer for these project:-

• Construction of Al-Fauroz Resort (32 typical building, 2 swimming pool, administration and reception building, Landscape)

• Construction of Al-Krawan Resort (40 typical building, Hotel, 2 swimming pool, Administration and reception building, Landscape)

الخلفية التعليمية

بكالوريوس,
  • في suez canal unviersity
  • يوليو 2005

Specialties & Skills

Management
Cost Control
Planning
Primavera P6
AutoCAD
surveying work and using Total Station
Planning program:- Primavera P6 – Micrsoft Project
Micrsoft package:- Word – Excel – Access – Powr Point
PHOTOSHOP
Anylsis program:- Sap – Etab – Staad – Safe – Reward - Proken
Autocad 2D
Survying program:- sdr mapping- autodesk land desktop

اللغات

الانجليزية
متوسط

التدريب و الشهادات

SITE ENGINEER (تدريب)
معهد التدريب:
AL ARAB CONTRACTORS COMPANY
تاريخ الدورة:
July 2003