Mazen Al Nuaimy, Resident Engineer

Mazen Al Nuaimy

Resident Engineer

Hill international

Location
United Arab Emirates - Dubai
Education
Bachelor's degree, Civil Engineering
Experience
28 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :28 years, 7 Months

Resident Engineer at Hill international
  • Oman
  • December 2012 to June 2012

Project Development of Salalah Airport RO 294, 000, 000.00
Details For construction of new airport north to existing one, with passenger terminal building with space to accommodate 2 mppa at an IATA Level of Service (LOS) A and aerodrome to ICAO standards, utility buildings, Air Traffic Control, VHF Towers, Fuel Farm.
External services including Storm water 4.5 Km of main wadi 200, 000 m³/sec, 15 Km of RC underground storm water drains, 46, 000 m² of riprap channels, 7000 m³ RC water tank, 7.5 Km of potable water lines (5.5 Km 450 mm water main HDPE by Project for authority), 1.7 Km diversion of existing potable water line (600 mm DI), 5.5 Km fire pipe lines, 3000 m³ TSE Irrigation tank, 3 Km 280 mm HDPE pipe for TSE, Irrigation pipe lines, chiller plant, 5000 m³ TES tank, 3.8 Km chilled water pipes, 21.25 Km LV, 48 Km MV, 29 Km IT, 6.8 Km sewage lines, 7 lifting stations, 5 bridges, 40 Km roads, airport interchange slip roads, 210, 000 m³ asphalt pavement for runway & taxiways, 61, 000 m² apron concrete, 1300 covered and uncovered car park, landscape and 17 Km security fence.
Refurbishment of existing aerodrome.
Contractor Larsen and Toubro Galfar Consortium
Role Leading consultancy services team for the following:
Supervision of external services, roads, 5 voided deck post-tensioned bridges, access road from airport interchange, slip roads, runway, taxiways, apron concrete, flood drainage channels, car park, hardscape granite flooring and stone cladding, landscape and security fence.
Supervision of terminal building and other buildings structural steel including 4 link boarding bridges, kalzip roofing and partly involved in ACP cladding, and curtain wall.
Design review of structural and civil works of the following:
passenger terminal, air traffic management, air traffic control, fuel farm, ancillary and utility buildings, external services, runway, taxiways and apron concrete.
Coordination with other disciplines including contract department.
Involved in quality and risk management.
Participated in ORAT sessions.
Responsible of as-built drawings review and involved in CAD compliance.
Review of O&M for Bridges, Roads, Storm water drainage, runway, taxiways and apron concrete.
Evaluation and rehabilitation of existing 39 years old runway & taxiways, using HWD and GPR method of assessment, refurbishment works includes milling and overlaying of 200, 000 m² of old aerodrome asphalt pavement.
Involved in Planned Preventive Maintenance during defects liability period.
Closing out and handing over of the Project.
Project Dhofar Beach Resort (Five-star resort / 300 rooms) as PMC for project management services.
Pre-contract Involved in the process of authority approvals supporting the client for managing appointed consulting firm as a part of project management services.
Post-contract Phase 1 for soil improvement using GRSM (Geosynthtic Reinforced Soil Mat) from Heusker to replace 1000 secant piles initial design.

Associate at Osman Audeh Consulting Engineers
  • United Arab Emirates
  • May 2011 to November 2011
at RTA
  • United Arab Emirates
  • May 2010 to May 2011

Project 4 nos villas in Dubai & Fujairah, & industrial buildings in Abu Dhabi and Ras Al Khaima.
Freelance works for supervision and contractual consultation for 4 villas in Dubai & Fujairah, & industrial buildings Dubai, Abu Dhabi and Ras Al Khaima, including short assignment as Acting RE for

Construction Manager at System Construc
  • December 2011 to February 2011

Project New Ruwais Hospital (and its extension), 50+75 beds
Contractor Al Meraiki &

Project Manager at Emirates Central Cooling Systems Corporation a.k.a. Empower
  • United Arab Emirates
  • April 2007 to May 2010
Resident Engineer at WSP
  • United Arab Emirates
  • June 2005 to April 2007

Project Burj Khalifa Development - Old Town Residence - Site A - Phase II
Details Total build up area: 112, 000 m², Contract Price: AED 437, 000, 000
The Project comprised of 13 residential buildings, 3 to 11 storey, including infrastructure, landscaping and district cooling works within the development.

Contractor at Al Futaim Carillon
  • United Arab Emirates
  • January 2007 to April 2007
Resident Engineer at Al Gurg Consultants
  • United Arab Emirates
  • August 2004 to June 2005
Project Manager at Mohammed
  • January 2002 to August 2004

Project Projects for Office fit-outs
Details Office fit-out for staff and IT class rooms, facility management for 42 IT classes in Dubai and Abu Dhabi for His Highness Sheik

Contractor at Tibah Media FZ LLC
  • United Arab Emirates
  • May 2001 to January 2002

Project Multi-Story Car Parking for Dubai Media City B+G+7, RCC pre-cast structure
Details Multi-Story Car Parking for Dubai Media City B+G+7; Pile cap foundation on bored piles, RCC pre-cast structure - Precast reinforced concrete including precast columns, beams and slabs. Total built up are: 45, 000 m2. Contract price: AED 54, 000, 000.

Project ENOC Petrol Filling Station # 1507 at AL Hurairah, Fujairah
ENOC Petrol Filling Station # 1401 at Nad Al Sali, Ras Al Khaima

Bridge Engineer at Al Khodari International Contracting
  • United Arab Emirates
  • May 2000 to May 2001

Project Maintenance, improvement and Upgrading of Roads, Bridges and Culverts Group 6 (Phase1)
Details Rehabilitation & maintenance of 26 bridges & 5 culverts including replacement of existing asphalt pavement
Consultant Hyder Consulting
Role •Managed teams to perform refurbishment works for bridges and culverts.
•Managed specialized subcontractors for concrete repair, painting and waterproofing repair works.
•Liaised structural evaluation consultant and Main consultant.
•Assigned daily works to teams to meet schedule requirements in coordination with planning engineer, providing data for Expedition-Primavera software.
•Liaised with material supplier and sought technical support before proceeding with repair works.
•Led team for production of diversion drawing in conformance with authority requirements.
Proven track of long lasting workmanship for refurbishment of expansion joint (modular type) installed at Dhaid Fujairah road.

Assistant Resident Engineer at Osman Audeh & Associates Engineers & Architects
  • United Arab Emirates
  • November 1998 to March 2000

Project Project TD 120 GSEM Complex and FCM Complex at Dubai International Airport
Details GSEM (Ground Support Equipment Maintenance) 40 m span, 10000 sq. m steel structure workshop with mezzanine offices, and ancillary buildings: including 1) Oil Changing Bay Building 2) Vehicle Washing and Cleaning 3) Bus Parking and Washing 4) Mosque 5) Chiller Building 6) FCM: Foreign Carrier Maintenance 7) Terminal 2 Shed 8) Sewerage Pump Stations 9) 2.5 Km Services lines included chilled water pipes passed under taxiway using directional boring crossing method 10) Aviation School.

Contractor Ascon
Role •Supervision of works in connection with buildings and external works.
•Liaising with airport operator.
•Review of shop drawings.
•Review materials submission.
•Review method statement.
•Participate in compilation of monthly report.
•Ensure compliance with Project’s HSE requirements.
•Oversee contractor’s progress of works.

Assistant Project Manager at C-Ampy Construction Sdn. Bhd
  • Malaysia
  • March 1997 to April 1998
Teacher at Al Khums Engineering Construction Institute
  • United Arab Emirates
  • February 1996 to August 1996

Responsible for teaching materials and method of construction subjects at Al Khums Engineering construction institute, education grade equivalent to grade 11 secondary school.

  • February 1992 to January 1996

works for renovation & supervision of houses & commercial building
Project Projects for small assignment
Role •Produced drawings for renovation of houses.
•Managed workmanship of contractors for renovation works.
•Reviewed structural drawings for residential & commercial buildings.

Ministry of Irrigation - General Corporation of Dams, Iraq

Project Engineer
  • May 1991 to January 1992
Bridge Engineer at CSCEC
  • United Arab Emirates
  • September 1985 to May 1991

Project New Hindya Barrage Project
Details Project for construction of barrage across Euphrates river (2, 500 m³/sec), 3 regulator gates upstream, 15 MW power plant, navigation lock, fish ladder, office and residential buildings.
•Three Motorway bridges; each bridge comprises of 3 piers on large diameter pile, posttensioned I beams on cross beam, decking, waterproofing and asphalt works.
•One railway bridge across Euphrates river; pile cap foundation on large diameter piles, single pier with cross head, posttensioned I beams on across head, the construction included walling and cofferdam works, and temporary bridge across river, testing included vertical and horizontal pile test.
•Headed taking over and quantity surveying of the bridges, residential & office building, barrage, hydropower plant, navigation lock, fish ladder, upstream regulators.
Contractor

Site Engineer at Government Authority
  • Iraq
  • December 1981 to April 1985

Project Suwairah Airbase
Details Project for long span steel structure hangers on bored piled foundation, utility buildings, apron concrete, infrastructures including asphalt works.
Contractor FDSP
Role Supervision of contractor’s construction activities for; earth works, excavation, foundation, inspection, structural steel, finishing works, review of materials submission, review of method statement, certify of monthly payment certificate.

Contractor at Eastern Contracting LLC
  • to

Led Supervision staff for structural works for buildings and external works.
•Liaised with Architectural & MEP Consultant, and Project Manager.
•Verified Coordination of design with other disciplines within process of production of shop drawings.
•Reviewed materials submission.
•Reviewed method statement.
•Ensured compliance with Project’s HSE manual.
•Oversee contractor’s progress of works, monitored work performed by building and external construction team.

Project •Ampang at Bangsar-PJ
  • United Arab Emirates
  • to

Details Respectively;
(863 m

Project Salamiat Irrigation Project
  • to

Iraq
Details Project for irrigation and soil rehabilitation drainage system
Role Responsibilities and Duties:
•Liaising with design review team.
•Oversee day to day contractor’s construction activities for irrigation and field water course drainage system.

Education

Bachelor's degree, Civil Engineering
  • at University of Baghdad
  • January 1981

Specialties & Skills

Administration
Mentoring
Industrial Buildings
BRIDGES
CONSULTING
CUSTOMER RELATIONS
ENGINEERING
GRAPHIC DESIGN
MATERIALS MANAGEMENT
MICROSOFT OFFICE
MICROSOFT WORKS
SUPERVISORY SKILLS

Languages

Arabic
Expert
English
Expert