Naji Fares دبابنة, Traffic Engineer

Naji Fares دبابنة

Traffic Engineer

The Burke Group - KLOA INC

البلد
الولايات المتحدة
التعليم
بكالوريوس, Civil and Materials Engineering
الخبرة
3 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :3 years, 2 أشهر

Traffic Engineer في The Burke Group - KLOA INC
  • يونيو 2013 إلى نوفمبر 2013

The Burke Group - KLOA INC June 2013 to November 2013
Traffic Engineer

Transportation Plans and Corridor Studies for numerous studies of residential, commercial, industrial, institutional, and mixed-use developments throughout greater Chicago area, including Cook, DuPage, Lake and Kendall Counties with reference to codes and standards.
Traffic Impact Studies using engineering software for numerous studies of residential, commercial, industrial, institutional, and mixed-use developments throughout greater Chicago area, including Cook, DuPage, Lake and Kendall Counties.

Data collection: Traffic counts and transportation data collection throughout the greater Chicago area.

Transportation Engineer Urban Development Engineer في The Burke Group- KLOA Inc
  • الولايات المتحدة
  • يونيو 2013 إلى نوفمبر 2013

Transportation Plans and Corridor Studies for numerous studies of residential, commercial, industrial, institutional, and mixed-use developments throughout greater Chicago area, including Cook, DuPage, Lake and Kendall Counties with reference to codes and standards.
Traffic Impact Studies using engineering software for numerous studies of residential, commercial, industrial, institutional, and mixed-use developments throughout greater Chicago area, including Cook, DuPage, Lake and Kendall Counties.
Data collection: Traffic counts and transportation data collection throughout the greater Chicago area.

Design Engineer في EJM Engineering
  • أغسطس 2012 إلى يونيو 2013

EJM Engineering August 2012 to June 2013
Design Engineer

I 80, Phase I, from Ridge Road to US Route 30, Illinois Department of Transportation, Will County- Project Engineer
Responsible for performing crash analysis after reviewing four years of data with updates for an additional two years. Identified crash patterns, analyzed probable causes of crashes and also represented them in crash diagrams and excel spreadsheets.
Elgin-O'Hare West Bypass-Illinois Department of Transportation- Project Engineer
Performed temporary and permanent barrier warrant analysis on potential hazards, identified hazards requiring shielding in the field, determined whether the existing guardrail was sufficient for MOT conditions, and performed analysis on stand alone and summary locations.

Wacker Drive Reconstruction Program Management, Chicago Department of Transportation-Project Engineer

EJM provided traffic engineering services to ease traffic congestion resulting from the simultaneous construction of the Wacker Drive reconstruction. I was responsible for CADD corrections of signal timing sheets for 85 intersections throughout the loop. In addition, he monitored and identified traffic issues and analyzed traffic flow.

Transportation Engineer Construction ENgineer Civil Engineer في EJM Engineering Inc
  • الولايات المتحدة
  • أغسطس 2012 إلى يونيو 2013

I-80, Phase I, from Ridge Road to US Route 30, Illinois Department of Transportation, Will County- Project Engineer
Responsible for performing crash analysis after reviewing four years of data with updates for an additional two years. Identified crash patterns, analyzed probable causes of crashes and also represented them in crash diagrams and excel spreadsheets.
Elgin-O’Hare West Bypass-Illinois Department of Transportation- Project Engineer
Performed temporary and permanent barrier warrant analysis on potential hazards, identified hazards requiring shielding in the field, determined whether the existing guardrail was sufficient for MOT conditions, and performed analysis on stand alone and summary locations.

Wacker Drive Reconstruction Program Management, Chicago Department of Transportation-Project Engineer

EJM provided traffic engineering services to ease traffic congestion resulting from the simultaneous construction of the Wacker Drive reconstruction. I was responsible for CADD corrections of signal timing sheets for 85 intersections throughout the loop. In addition, he monitored and identified traffic issues and analyzed traffic flow.

Engineering Intern and Researcher في University of Illinois Civil Engineering Department
  • الولايات المتحدة
  • أغسطس 2010 إلى مايو 2012

Key member on a multi million dollar state project. The project involved testing the structural integrity of concrete beams with basalt reinforcement which would provide as a much cheaper alternative to steel reinforcement. Furthermore, the project included testing the properties of different concrete mix structures which would be the most durable for cold chicago weather.

Undergraduate Research/ Research Assistant في Civil Engineering Department (UIC)
  • أغسطس 2010 إلى أغسطس 2011

Civil Engineering Department (UIC) August 2010 to August 2011
Undergraduate Research/ Research Assistant

Testing the properties of Portland Cement with limestone with different admixtures to achieve desirable structural properties.

Test various steel configurations in beams and beam column joints using steel and alternate reinforcement such as Fiber Reinforced Plastic (FRP)

الخلفية التعليمية

بكالوريوس, Civil and Materials Engineering
  • في University of Illinois at Chicago
  • مايو 2012

BS, Civil and Materials Engineering May 2012 University of Illinois at Chicago GPA 3.0/4.0

بكالوريوس, Civil and Materials Engineering
  • في University of Illinois at Chicago
  • مايو 2012

Specialties & Skills

English
Design Engineering
Construction Engineering
Transportation Engineering
Civil Engineering
AutoCad
ANALOG SILICON
AUTO CAD
CRASH ANALYSIS
DESIGN ENGINEER
ENGINEER
EXCELLENT MULTITASKER
TESTING
Microsoft Office

اللغات

الانجليزية
متمرّس
العربية
متمرّس
الاسبانية
متوسط

العضويات

American Society of Civil Engineers
  • Member
  • May 2008
Arab American Association of Engineers and Architects
  • Member
  • August 2012