Work Experience

Total years of experience :34 years, 5 Months

Project Engineering and Interface Management at Amec Foster Wheeler
  • Kuwait - Al Ahmadi
  • August 2014 to November 2016

My role as Project Engineering and Interface Management included; review designs, monitor procurement, construction quality, verify progress reporting and assess contractual issues for Client/PM consideration and directives.
Review, approve, comment or reject EPC Contractor’s design documents and drawings, vendors’ technical data, attend technical and project management meetings, monitor work progress.
Observe contractors’ actual performance in Engineering & Construction of Electrical Substations, Plant Emergency Alert System (PEAS), Emergency PA/GA, and Security systems of CCTV & Access Control, Fire Detection & Alarm Systems, PS and UPS systems. Attend weekly and monthly progress meetings and follow up project managements including construction activities. Performed root-cause analysis.
Acted as an Engineering/Construction Manager reporting to Project Manager and delegated/deputized as Project Manager reporting to Projects Director.

Telecom and instrument Engineer at Kuwait National Petroleum Company (KNPC)
  • Kuwait - Al Ahmadi
  • July 1994 to June 2014

Responsibilities include management of projects engineering, procurement, construction, commissioning; review projects drawings and documents. Carry out load calculations of cables and devices. Ensure compliance, suitability and interoperability of devices/units within systems or in interface with each other and with the existing. Identify and address discrepancies in early stages. Ensure Projects Quality Assurance, Projects Risks and conduct FAT, SAT and commissioning. Problem solving, optimization and rationalization of projects design. Lead, perform and review the use of projects management tools and techniques such as Critical Path Method analysis, PERT, GANTT charts and Work Breakdown Structure (WBS) of tasks which facilitate projects time schedule (baseline), help optimize manpower distribution and activities, follow up actual progress of deliverables and milestones within specified timeframe. Liaison with management to take measures of fast tracking or Critical Path Crashing to expedite execution rate, as deemed necessary.
Mentored and trained junior engineers
Conducted projects feasibility study, initiate projects, review projects drawings/documentations and recommend necessary changes/amendments as per the international codes, standards and the best engineering practices. Verify contractors’ drawings and documents for compliance with the contract terms, conditions and specifications. Ensure/direct safe completion of works as per Company HSSE regulations. Supervise, and control telecom and instrument engineering activities and perform diagnosis and problem solving of highly sophisticated systems, such as SDH/DWDM nodes, SCADA/DSC, PA, PA/GA, Plant Paging Intercom, CCTV and Trunked Radio TETRA System. Plan future requirements in accordance with the latest developments. Conduct Factory Acceptance Tests (FAT) as well as Site Acceptance Tests (SAT) and systems commissioning.
Manage Project Engineering, Procurement, and Construction and Commissioning activities throughout different project phases.
Familiar with the governing Project Procedures and Control standards.
Implemented Risk Analysis, Risk Assessment and ensuring adequate identification and mitigation of project risks.
Ensured a robust analysis of key project performance parameters, including evaluation of QA/QC, QMS meeting client requirements and satisfaction.
Management of key interfaces with contractors, including contractors’ performance against an established schedule/baseline with critical milestones.
Engaged with key contractor’s personnel in performance management discussion of project progress of engineering, procurement, construction and commissioning. Ensure that project is in-line with standards requirements and scheduled baseline.
Knowledge of wide range of refineries units, systems and equipment such as pipelines, mechanical, structural and subsequent ability to realistically assess project baselines, probability of time slip and QA & QC performance of various disciplines.
Represented the Company (KNPC) in major EPC projects as Modernization of Refinery Gas (MORG) Plants executed by Cegelec, MAFP, AGRP, GOD, Construction of New Oil Pier (the largest in the Middle East) executed by Hyundai. For the latter, I was commended and rewarded by the Deputy Managing Director where I saved to Company an approx. amount of KWD 350 thousand, through optimization and rationalization of designs.
In-depth knowledge of HSSE rules, regulations and standards with the ability to lead teams in tightly HSSE controlled environments as in petrochemical, mining and oil & gas industries.
Experienced in PC hardware and software as UNIX, C and C++ programming. Extensive knowledge of Microsoft packages: MS Projects, Excel, Access, Power Point. CAD, AutoCAD and Primavera P6 Software.
Knowledge of National Fire Protection Authority standards such as NFPA -70/72 and ISO 7240 - 19/16, Shell and KNPC standards.

Telecommunication and Electronics Engineer at Pro-Com at PRO-COM
  • Australia
  • January 1993 to January 1994

Telecommunication and Electronics Engineer at Pro-Com Company, Australia, 1993-1994.

Head of Electrical & Instrumentation Division at SPC
  • Syria
  • January 1981 to December 1991

My Division was commended for its performance in hazardous environment of oil and gas, which required high performance and prompt response to problems.
Engaged in project management of Gas Turbine Power Plants, Main Station, Substations, PABX and Trunked Radios. There, I had my first Engineering Achievement of modifying the Design of Generator excitation system of one of the Gas Turbine, by further decreasing the Firing Angle of Thyristors in order to further increase the Excitation Current leading to the increase of HV to the required level.

Education

Master's degree, Electronics
  • at Technical University of Sofia Evaluated by Institution of Engineer Australia as a PE
  • July 1975

Specialties & Skills

Electronics
Electrical Engineering
Telecommunications
Leading Projects
COST ESTIMATES
DIAGNOSIS
ENGINEER
PROBLEM SOLVING
TELECOMMUNICATION
TELECOMMUNICATIONS

Languages

Arabic
Native Speaker
English
Expert
Kurdish
Native Speaker
French
Intermediate
Russian
Intermediate

Training and Certifications

Long list of Training, reference my CV (Training)
Training Institute:
Variaty of institutes