Samuelito Pagapong, Engineer

Samuelito Pagapong

Engineer

Hitachi Zosen Corporation

Lieu
Philippines
Éducation
Baccalauréat, Electrical And Mechanical Engineering
Expérience
36 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :36 years, 4 Mois

Engineer à Hitachi Zosen Corporation
  • Qatar
  • avril 2016 à mars 2018

E & I Project: Umm Al Houl IWPP, Desalination Plant -Qatar
Client : Umm Al Houl Power “IWPP” -Desalination Plant PMC : Mott Mac Donald, Qatar

Project Manager à Fajar Al-Khaleej Trading & Cont. Co
  • Qatar
  • mars 2015 à avril 2016

MEP Project: Warehouse & Offices - Ras Laffan
Client : Petrotec PMC: Qatar Design Consortium

Engineer à Tozzi Qatar
  • Qatar
  • octobre 2013 à février 2015

E & I Project: Polysilicon Plant - Ras Laffan
Client : Qatar Foundation PMC: QSTec Qatar Solar Technology

Senior Electrical Engineer à Sinohyrdo Corporation
  • Qatar
  • décembre 2012 à septembre 2013

Doha North Sewerage Treatment Plant
Client : Ashgal - Infrastructure Affairs PMC : Keppel Seghers Engineering Singapore Pte. Ltd.

QA/QC Manager à Sepam Qatar WLL
  • Qatar
  • janvier 2010 à mai 2011

NDIA PMC: OBI “Bethel Oversea International" M. Cont.: CDC - Takenaka Joint Venture

Electrical Engineer à Qatar Aluminum “Qatalum Ltd.” PMC
  • mai 2009 à janvier 2010

Responsible for field implementation, inspection and supervision for Electrical & Instrumentation Works for Qatar Aluminum Project and its related Facilities and Utilities. In Reduction Area - 14 Pot room Tending Machines, 3 Anode Jacking Frames, 3 Transfer Gantry System, 1 cathode Removal Crane and 20, 000 Anode Clamps plus corresponding J-Hooks. Paste plant. Anode baking plant. Plant wide Utilities - Electrical distribution, air, fuel gas, seawater, potable and process water and waste water. Harbor facilities - ship unloaders, alumina and coke bulk storage, handling and truck loading systems and pitch transport.
Ensure work is carried out competently and effectively, within time and budget constraints and that project objectives are satisfied. Participate in the management of reliability and integrity of the complex by working with the multi-disciplinary area integrity and reliability management team. Facilitate and develop a productive and cohesive team. Maintain and facilitate an awareness of HS&E across the discipline within assigned project.

Quality Management à PIC- Petrochemical Industries Company and PMC: Bechtel International
  • octobre 2008 à mai 2009

Company’s

QAQC Inspector à TECHNIP Italy S.p.A
  • février 2005 à septembre 2007

68 00148 Roma, Italy, Tel. (+39) 06 65981
Position :

Construction Manager à Dehdari General Trading & Construction Company
  • Koweït
  • janvier 2003 à février 2005

Electrical
Projects : Ali Al-Salem Airbase, Al-Jaber Airbase and Camp Bhuering New & Upgrading Projects
: Upgrading of Airbase Airfield Lighting System at Ali Al-Salem & Al-Jaber Airbase.
: Construction of new Medium Airfield Airbase Lighting System at Camp Bhuering.
: Upgrading of 11KV Distribution & Base Communication System at Ali Al-Salem & Al-Jaber Airbase.
: Various HVAC, Power and Telecommunication Projects in Kuwait US Military Camps and Sites

Project Manager à GLACT Mobile Network, Inc
  • mai 2000 à avril 2001

Electrical & Telecommunication
Project : Globe GSM Project, Viking-3, Phase-7, SWEsites
: ISLACOM GSM Roll-out Project, Base Transmission Stations and Cell sites

Construction Manager à SPARK Electro-Mechanical Services Company
  • mai 1998 à mai 2000

Electrical
Projects : Carbon Dioxide “CO2” Plant, Cebu 70.6MW Power Plant, Kanlaon Mineral Water Plant
Globe GSM Project Viking-3 and Phase-6, SWEsite

Head à Telephone System & Fiber Optics O/H & U/G Lines
  • août 1995 à janvier 1998

as

Construction Superintendent à Saudi Consolidated Electric Company “SCECO EAST
  • Arabie Saoudite
  • décembre 1992 à décembre 1995

HV/LV - O/H & U/G Lines
Projects : Construction of Thousand kilometers of Primary and Secondary Underground Distribution system.
: Construction of Power Plants, HV / MV Substations. Outdoor and Indoor Substations and switchyard facilities.
: Installation of Pole Mounted Transformers, Capacitors, Voltages Regulators, Air Break Switches, HV Switches.
: Construction of hundreds of Primary and Secondary power supplies to Industries, Commercials & Residential
: Conversion and standardization of primary voltage to 13.8KV, 3 - Phase, 60Hz.
: Upgrading & Modification of existing power system to meet additional load requirements.

Maintenance Engineer à Saudi Services & Operating Company, Ltd. “SSOC
  • Arabie Saoudite
  • mai 1987 à décembre 1992

Gas Turbine Power Plant
P. Plant Maintained: Faras Gas Turbine Power Plant & Uthmania Gas Turbine Power Plant

Design Engineer à Dhahran International Airport & King Abdul Aziz Airbase
  • juillet 1982 à juillet 1986

planning, feasibility study, design, cost estimates and Bid Documents. Pre-qualification of documents, setting tender strategies and ensuring sufficient resources are available to complete the tenders and negotiating contract terms.
•Design electrical engineering calculations as follows: total connected load, demand and net computed load in order to get the correct size and rating of wires and cable, conduit, pipes and fittings, cable trays, hanger and support, cable ducts, trenches and hand hole, lighting illumination level, voltage drop, short-circuit, and grounding resistance. Design interior and exterior electrical layout of vertical, horizontal and high-rise buildings. Power and lighting layout. Grounding layout and lightning protection. Auxiliaries such as, intercom and paging layout, telephone layout, CCTV /CATV layout FACP. Design power and lighting layout for sports facilities, perimeter and security lighting layout, airbase and airfield lighting layout, emergency and standby generator, storage batteries, uninterruptible power supply "UPS' and emergency lighting system. Compute the size and rating of wall switches and outlets, safety switch, transfer switch, fuses, breakers, panel distribution board, switchgears and parameters, motor control centers, magnetic starter, heater, capacitor, transformer, standby generator, voltage regulator, lightning arrester, cutout fuse, conductors, poles and hardware's. Preparation of electrical working drawing, sketches & detail for construction as follows: Lighting layout, Power layout, grounding layout, Auxiliary layout, Single, schematic and wiring diagram, Schedule of load and computation.

Project Engineer à Surigao Consolidated Mining Company “SURICON
  • juin 1980 à juin 1982

for construction implementation, supervision & maintenance of the whole mining plant & related building facilities.
•Mine Electrical: Construction and installation 4160Volts overhead distribution lines, substation, transformer, breakers, switches, panel boards, motor controls, power and lighting, deep well pumps, submersible pumps, booster pumps, water pumps & motors.
Mill Electrical: Installation of all devices, machine and equipment such as ball mill, jaw crusher, drum scrubber, secondary and tertiary crusher pumps, motor and control, power and lighting, grounding and lightning protection, medium and low voltage switchgear, power plant - 2-950KW caterpillar generator, 69KV substation & O/H Lines. Plant Building Facilities: Mill plant building, power plant, assay laboratory, administration building, warehouse, motor pool, guest house, Jr. & Sr. staff houses, 41-units rank-in-file duplex housing church, hospital and sports facilities. Planning and scheduling; interpretation and modification of plan; materials take-off and cost estimate; expedite, monitor and request materials, tools, equipment and manpower; testing, commissioning and preparation of as-built drawing Construction highlights and reports.

Construction Engineer à Engineering & Construction Corporation of Asi
  • Philippines
  • avril 1980 à mai 1980

of Project Design Package as per Ecco-Asia Engineering & Construction Standards from planning, feasibility studies, materials take-off, cost estimates, man-hours, equipment hours, scope of work, preparation of working drawings, sketches and details.
•Project monitoring and scheduling. Interpretation of plans and modification.
•Study and review approved plans, specification and contract for construction.
•Expediting requisition and purchasing of materials, tools, equipment and manpower.
•Project supervision and inspection of actual electro-mechanical works as per approved construction drawing, specification and accepted engineering standards.
•Rectify any changes and revision of plan. Resolve any problems that may arise.
•Testing & Commissioning. Construction highlights and report.

Éducation

Baccalauréat, Electrical And Mechanical Engineering
  • à Feati University
  • avril 1976

Desalination Plant, Polysilicon Plant, Ethylene Plant, Aromatic Complex, Airport/Airbase Project, Infrastructure and Utility Company Projects.

Specialties & Skills

Site Supervision
Construction & Property
Engineering
BUDGETING
CABLING
CUSTOMER RELATIONS
CUSTOMER SATISFACTION
ELECTRICAL ENGINEERING
FRAMING
GRAPHIC DESIGN
LAYOUT DESIGN

Langues

Anglais
Expert

Adhésions

IIEE SQC
  • Electrical Field
  • June 2018

Formation et Diplômes

Technical Seminars (Certificat)