mohammed osama, Production manager then Operation manager

mohammed osama

Production manager then Operation manager

Doha Extraco co

Lieu
Qatar - Doha
Éducation
Baccalauréat, interior design
Expérience
13 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :13 years, 8 Mois

Production manager then Operation manager à Doha Extraco co
  • Qatar - Doha
  • juin 2011 à novembre 2012

1- Employer: Doha Extraco co.-Doha.
Designation: Production manager then Operation manager.
Period: From June 2011 till dated
Tasks: a- Supervision on GRC, GRP & GRG production & installation.
b- Coordination between shop drawing, production & site.
c- Follow up production status.
d- Site coordination with other activities.
e- Time schedules preparation.
f- Monthly invoices preparation.


• Palace for Shk. Hamad Bin Jassim at Wagba (GRC ceiling) - Dara engineering &consultant.
• Six residential buildings (B+G+3) at Al Sadd -Arab united construction (Arcon)
• Palace for Shk. Khalid Abdul Rahman at AlWakeer - Badr Al Hazik contracting
• Swimming pool building - Arab united construction (Arcon)
• Majlis and mosque for Shk. Hamad Bin Jasim - Faisal Al Attiyah trading & contracting.
• Private villa for Mr.Monjid Abdul Majeed - Redco contracting.
• Al Luqta private villa - Redco contracting.
• 55 nos. villa complex, clubhouse & guardhouse at Al Rayyan - Al Madar contracting.
• Expantion of Banush club at Messaieed - Al Madar trading &contracting.

• VIP golf club villa at Lusail - Urbacon.
• Private Villa for Mr. Abdul Hadi at Al Rayyan - Option one contracting.
• NSS Building at Saudi border - Bujamhour.
• Badr mosque at Fourosia round about - Badr Al Hazik contracting.
• Labour city at Messaimeer - Al Ali projects.
• Jarryan Majilis at north way - Urbacon.
• Al Sadd Building - Faisal Al Attiyah trading & contracting.Five villas - Lakers contracting.
• Mosque (2200 prayers) + Quran centre AT Al Gobaylat - Badr Al Hazek contracting.
• Private villa for Sheikha Noura - GRC Column cladding at north way - Khabbaz contracting.
• Renovation of Al Maliky tower.
• GRC Canopy at Villageo - Four season contracting.
• Dukhan peach palace - Urbacon.
• GRC Cladding for new palace, Majlis & offices at Al Wagba palace - Dara engineering.
• Amiri Diwan project at Al Rayyan - Al Ali projects.

Production manager then Operation manager à Doha Extraco co.-Doha
  • Qatar - Doha
  • juin 2011 à novembre 2012

1- Employer: Doha Extraco co.-Doha.
2-Private projects in Egypt
3- Employer: Prefab building industries LTD co.-Dubai.
4- Employer: Al-Banaoon construction co. -Egypt.
5- Employer: Khoury stands -Egypt.

: Interior design engineer à 2-Private
  • Egypte - Le Caire
  • septembre 2009 à mai 2011

Interior design engineer. (B.sc. interior design engineer June 2000/Helwan University)
Address: Cairo - Madinat Badr -First district -Second neighborhood Bld.16 B
Flat 13.
E-mail: mohdosa577 @yahoo.com
Telephone: 0097477326053


13 years' experience, (9 years in gulf area) 18 months in Doha - Qatar and 7years in UAE in construction field specialized in G.R.C., G.R.P, G.R.G. & False ceiling for different types of projects (residential, industrial and commercial) capable of: ➢ Carrying out production, installation, mobilization and handing over any type of cladding like GRC, Precast, etc. (as a project manager, production manager and as an operation manager)
➢ Carrying out site coordination with all the façade activities such as glazing, aluminum cladding, GRC, Precast, plaster, etc. (Façade manager or site coordinator)
➢ Carrying out interior design for different types of projects like palaces, private villas, residential & commercial towers for all activities - plumping, electric works, marble, ceramic, painting, steel works (Interior design engineer)
➢ Quality control on a different level to meet the client perspective and requirements.

Work experience:-
1- Employer: Doha Extraco co.-Doha.

Production manager then Operation manager à Prefab building industries LTD
  • Émirats Arabes Unis - Dubaï
  • novembre 2003 à août 2009

a- Supervision on GRC, GRP & GRG installation.
b- Coordination between shop drawing, production & site.
c- Follow up production status.
d- Site coordination with other activities.
e- Quotation study.
f- Time schedules preparation.
g- Monthly invoices preparation.

Senior projects manager à Prefab building industries LTD
  • Émirats Arabes Unis - Dubaï
  • novembre 2003 à août 2009

Interior design engineer. (B.sc. interior design engineer June 2000/Helwan University)
13 years' experience, (9 years in gulf area) 18 months in Doha - Qatar and 7years in UAE in construction field specialized in G.R.C., G.R.P, G.R.G. & False ceiling for different types of projects (residential, industrial and commercial) capable of: ➢ Carrying out production, installation, mobilization and handing over any type of cladding like GRC, Precast, etc. (as a project manager, production manager and as an operation manager)
➢ Carrying out site coordination with all the façade activities such as glazing, aluminum cladding, GRC, Precast, plaster, etc. (Façade manager or site coordinator)
➢ Carrying out interior design for different types of projects like palaces, private villas, residential & commercial towers for all activities - plumping, electric works, marble, ceramic, painting, steel works (Interior design engineer)
➢ Quality control on a different level to meet the client perspective and requirements.

Senior projects manager à Banaoon construction co
  • Egypte - Le Caire
  • juin 2000 à novembre 2003

Designation: Site engineer.
Period : From June 2000 till Nov. 2003.

Site engineer à Banaoon construction co
  • Egypte - Le Caire
  • juin 2000 à novembre 2003

Senior projects manager

Interior designer à Khoury
  • Egypte - Le Caire
  • avril 1999 à juin 2000

5- Employer: Khoury stands -Egypt.
Designation: Interior designer.
Period: From April 1999 till June2000.
Task: - Developing shops facades.
- Designing multi use show stands.
- Furniture design in different styles.
- Dealing with computerized Router machine with shop drawing preparation.

Éducation

Baccalauréat, interior design
  • à Helwan University
  • mai 2000

Occupation: Interior design engineer. (B.sc. interior design engineer June 2000/Helwan University)

Specialties & Skills

Langues

Arabe
Expert
Anglais
Expert
Français
Expert