Mostafa Ismael Mohamed Ibrahim ibrahim, Supervisor

Mostafa Ismael Mohamed Ibrahim ibrahim

Supervisor

IMS

Location
Saudi Arabia - Mecca
Education
High school or equivalent, MOAMMAR INFORMATION SYSTEMS
Experience
32 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :32 years, 0 Months

Supervisor at IMS
  • Egypt
  • My current job since June 1992

Survey Authority, Aerial Survey Department, theUSAID - sponsored

CONSULTANTS at Zuhair Fayez Partnership Consultants
  • Saudi Arabia - Jeddah
  • February 2008 to May 2015

The project studying the Makkah Al-Mukaramah zone region for Kingdom of Saudi Arabian, my main task preparing the natural and topoghrapic data information system depend on assembling data from various ministries to product Base Map for study area . Emara Makka Al-Mukrama Planning administers.
ZUHAIR FAYEZ PARTNERSHIP

CONSULTANTS at East zone of Saudi Arabian
  • July 2006 to January 2008

The project studying the East zone region for Kingdom of Saudi Arabian, my main task preparing the natural and topographic data information system depend on assembling data from various ministries to product Base Map for study area .

ZUHAIR FAYEZ PARTNERSHIP

Technical support at ABDULHADI & ABDULLA AL-MOAIBED CUNSULTING ENGINEERING CO
  • Saudi Arabia - Dammam
  • May 2003 to June 2005

The client of this project is Urban Planning Department, Deputy Ministry for physical planning, The Ministry of municipal and rural affairs, Kingdom of Saudi Arabia. On of the Main objective of the 2 years project aims in the first step to prepare the digital Base Map for the Damam region, Qatif and Ras Tannura Governorates. The processes included Satellite Images Rectification and geo referencing based on known control points, Data conversion from hard copy maps to digital format using On Screen Digitizing and based on Satellite images (Quick Bird 60 Cm. Resolution), also Topology, contour lines, roads, and geology Maps in the Cad environment, also finally preparing the BaseMap - which include parcel numbers according to each approved plans and the other layers - in the GIS ready format using Arc Info Workstation Software. In the planning step I participate in the social and economic spatial selection of the household (3% of the total household)

My main tasks in this project include:
1- Preparing transforming all digital plans and layers that are representing base map by
package of Arc GIS programs
2- Quality control for digital plans and data to match the accuracy of Satellite images
3- Updating and completing the main components of Base Map in terms of topology and
Urban planning
4- Supervising and

GIS Analyst at The USAID –Sponsored IMS Projec
  • Egypt
  • September 1995 to May 2003
at GIS
  • United Arab Emirates
  • April 1999 to June 2000

This Turn-key project aims at the design, development and construction of

at East zone of Saudi Arabian
  • December 1999 to March 2000

Data conversion from hard copy map to digital from in GIS ready format based on Satellite
Remote Sensing data. The project was carried out for Egypt as a part of East Africa.
The area has many different types of land cover according to FAO standard. The process
Involved data conversion, multi level quality control and editing to produce data files readily available for use in GIS environment.

12- The preparation of the master and detailed plans for Damam region, Qatif and Ras Tannura Governorates

Supervision at South Valley Development (TOSHKA canal) Project - Egyptian Survey Authority
  • November 1998 to April 1999

Digital Cartography

Supervision at Sinai Development (AL-SALAM canal) project - Egyptian Survey Authority
  • May 1998 to December 1998

Digital Cartography

at Base Map of Nile Delta & valley Project - Regional Observation Center
  • July 1998 to September 1998

00, 000 Digital GIS - ready base map was developed for the Nile Delta and valley .
Six GIS layers compose The base map .those are the irrigation network, the road network
the railways layer, the urban settlements layer, the administrative boundaries layer and the water bodies layer (lakes) . The features of each layer were classified into certain class according to the feature classifications of the 1:100, 000 topographic maps of the E.S.A .

at GIS
  • United Arab Emirates
  • July 1996 to April 1997

Design and construction of

Research at GIS
  • United Arab Emirates
  • September 1995 to July 1996

ROC as a

at Oman Project - Cairo Engineering & manufacturing Company
  • February 1993 to July 1996

I learned the principals of GIS and use of ARC/INFO I had also an intensive training in ARC/INFO provided by ESRI .Then assisted in development of prod.
User interface and the refinement of ESA ’s custom symbol library .

at GIS
  • United Arab Emirates
  • September 1994 to September 1995

Educational

at GIS
  • United Arab Emirates
  • July 1994 to September 1994

Constructing a

at IDSC
  • Egypt
  • March 1994 to July 1994

Converting all CAD data layers of Sultanate of Oman into Arc/Info Coverage's.

CEDARE Project- Information and Decision Support Center

Education

High school or equivalent, MOAMMAR INFORMATION SYSTEMS
  • at ULTRIX
  • July 2003

Course of Transliteration of Arabic proper names into English alphabet. "According to UN resolution 1973 Transliteration system standards for the proper pronunciation of names and labels" . EGYPTIAN SURVEY AUTHORITY (E.S.A

High school or equivalent, SYSTEMS ENGINEERING
  • at ULTRIX Network Managemen
  • December 1992
Bachelor's degree, Maps and Geography Section
  • at Cairo University
  • June 1991

",

High school or equivalent, Maps and Geography Section
  • at Cairo University
  • June 1991

",

Specialties & Skills

Languages

Arabic
Expert
English
Expert
French
Expert