مجموع سنوات الخبرة: 30 سنوات, 7 أشهر
أغسطس 2011
إلى حتى الآن
IT Manager
في Burhan International Construction Company
البلد :
الكويت - الكويت
Manage IT Infrastructure and day to day IT operations of the company. I am actively involved in policy and implementation of each application effectively. Directly managed a team of 6 IT technicians to deliver a smooth IT operations. The company I spread across 3 countries Kuwait/Qatar/Egypt equipped with the latest state of the art IT technology and delivering services with cutting edge technology.
I was entrusted an additional responsibility of managing the Schools (which is part of the parent company Al Wazzan Group) and enhancing the infrastructure established for the schools and create processes to develop the school IT performance.
Selected Accomplishments:
Reconfigure and align Data center with consolidation of services, priority to deliverables according to the requirements presented by the management
Planned and implemented a Rack layout within the Data distributed by services e.g. primary and secondary Server and Services racks
Planning and partly implementing sub centers distributing services for projects and administration operations. All sub centers were equipped with UPS for power redundancy and network redundancy
Effectively managed the contractors to plan, design, configure and administer following devices : ISP Routers / Cisco 5520 Firewall / 5500 series 3Com Core switches (primary/secondary) / Cisco Wireless / 3Com IP Telephony / Dell 2950 servers / VM ESXi 4.0 environment / EMC SAN Storage / Rack servers
Effectively managed the contractors to plan, design, configure and administer following systems and Applications : Windows Server 2008 / Windows 2000 / Domain controller / Exchange Server 2007 / SQL Server / WSUS services / Trend Micro Corporate Antivirus Environment / Trend Micro Web Filter Appliance
Website development and implementation with content management system ongoing project.
Leveraged strengths in cost-effective information technology management and vendor negotiations.
Implemented Software Appliance for Project Management and Incident Tracking (Virtual Appliance)
I was entrusted an additional responsibility of managing the Schools (which is part of the parent company Al Wazzan Group) and enhancing the infrastructure established for the schools and create processes to develop the school IT performance.
Selected Accomplishments:
Reconfigure and align Data center with consolidation of services, priority to deliverables according to the requirements presented by the management
Planned and implemented a Rack layout within the Data distributed by services e.g. primary and secondary Server and Services racks
Planning and partly implementing sub centers distributing services for projects and administration operations. All sub centers were equipped with UPS for power redundancy and network redundancy
Effectively managed the contractors to plan, design, configure and administer following devices : ISP Routers / Cisco 5520 Firewall / 5500 series 3Com Core switches (primary/secondary) / Cisco Wireless / 3Com IP Telephony / Dell 2950 servers / VM ESXi 4.0 environment / EMC SAN Storage / Rack servers
Effectively managed the contractors to plan, design, configure and administer following systems and Applications : Windows Server 2008 / Windows 2000 / Domain controller / Exchange Server 2007 / SQL Server / WSUS services / Trend Micro Corporate Antivirus Environment / Trend Micro Web Filter Appliance
Website development and implementation with content management system ongoing project.
Leveraged strengths in cost-effective information technology management and vendor negotiations.
Implemented Software Appliance for Project Management and Incident Tracking (Virtual Appliance)
يوليو 2015
إلى ديسمبر 2017
Human Resources and IT Consultant
في Multiple Companies in Manila
البلد :
الفلبين
Working and handling all IT Services and Foreign Employers for Recruitment Activities in Manila. Associated with Augustin International Center Inc. POEA Registered overseas recruiter.
فبراير 2009
إلى يوليو 2011
IT Manager
في The Regency Hotel
البلد :
الكويت
Manage IT Infrastructure and day to day IT operations of the Hotel. I was actively involved in policy and implementation of each application effectively. Directly built and managed a team of 4 IT technicians to deliver a smooth operation of all guest services and administration alike. The hotel consists of 215 superb rooms equipped with the latest state of the art IT technology and the largest banqueting / convention center in Kuwait delivering services with cutting edge technology.
Selected Accomplishments :
Designed and implemented a Data center with consolidation of services
Designed and implemented a guest network infrastructure in such a secure environment that every guest room is an independent VLAN
Planned and implemented a Rack layout within the Data distributed by services e.g. primary and secondary fiber Racks
Planned sub centers distributing services for guest rooms and administration operations. All sub centers were equipped with UPS for power redundancy
Effectively managed the contractors to plan, design, configure and administer following devices
ISP Routers / Juniper Firewall / Bluecoat Proxy / 6500 series Core switches (primary/secondary) / Aruba Wireless / Avaya IP Telephony / HP Blade servers / VM ESXi 4.0 environment / HP SAN Storage / Rack servers
Effectively managed the contractors to plan, design, configure and administer following systems and Applications :
Windows Server 2008 / Windows 2000 / Domain controller / Exchange Server 2007 / SQL Server / WSUS services / Corporate Antivirus Environment
Property Management system - Protel / Sales and Marketing - Delphi / Micros Fidelio Materials Control system / Back office - SUN System (Financial Accounting) / Micros 9700 POS system(Point of Sale to manage all F & B outlets) / Messerschimitt Guest Room Door Management system / Tiger Interface for call accounting for Avaya IP telephony / Distributed Storage for every Domain user / Symantec system Backup / Systemtec GRMS (Guest
Selected Accomplishments :
Designed and implemented a Data center with consolidation of services
Designed and implemented a guest network infrastructure in such a secure environment that every guest room is an independent VLAN
Planned and implemented a Rack layout within the Data distributed by services e.g. primary and secondary fiber Racks
Planned sub centers distributing services for guest rooms and administration operations. All sub centers were equipped with UPS for power redundancy
Effectively managed the contractors to plan, design, configure and administer following devices
ISP Routers / Juniper Firewall / Bluecoat Proxy / 6500 series Core switches (primary/secondary) / Aruba Wireless / Avaya IP Telephony / HP Blade servers / VM ESXi 4.0 environment / HP SAN Storage / Rack servers
Effectively managed the contractors to plan, design, configure and administer following systems and Applications :
Windows Server 2008 / Windows 2000 / Domain controller / Exchange Server 2007 / SQL Server / WSUS services / Corporate Antivirus Environment
Property Management system - Protel / Sales and Marketing - Delphi / Micros Fidelio Materials Control system / Back office - SUN System (Financial Accounting) / Micros 9700 POS system(Point of Sale to manage all F & B outlets) / Messerschimitt Guest Room Door Management system / Tiger Interface for call accounting for Avaya IP telephony / Distributed Storage for every Domain user / Symantec system Backup / Systemtec GRMS (Guest
فبراير 2002
إلى يناير 2009
IT Charge to IT Manager
في HAMAD AL KHALED BROS & CO W. L. L.– KUWAIT Head office for the group, owners for Kempinski Julai’a
البلد :
الكويت - الكويت
I was managing IT Infrastructure and all day to day operations of the Head office of the company. I was actively involved in policy and IT implementation of every subsidiary company effectively. I had joined the company at the correct time of implementing a large company resort project constructed. The company was already in technical agreement to implement a complete infrastructure with a company where I played a role to present the company with an alternative proposal of complete installation which was approved by the kempinski hotel management company and I was included in the pre-opening team of this resort. In 2006 Kempinsk Julai’ai Hotel and Resort ceased their management contract but the resort continued its operation independently known today Seashell Julai’a Hotel and Resort.
Selected Accomplishments:
Operate 5 windows 2003 servers at the head office of the company with applications, Financial Accounting from MGS system / Materials control system / Personnel management system / Legacy Materials control system / Garage management system / Car rental system at the Amghara warehouse and ancillary operations
Windows server 2003 / Isa Proxy / Powerbuilder development platform / Sybase Backend database server / clipper based legacy system
Managed to revamp complete network with cisco network and centralized Windows 2003 file server user storage.
I was fully in charge to control all IT implementation in the resort and completed until IT was deputed by the management company
I was also appointed IT manager for the Seashell Julai’a Hotel and Resort where I undertook the task for taking the handover from the Kempinski hotel management company. . I supervised the complete day to day operations of the resort. I was pivotal in creating various up-graded reports for the resort which was implemented in the resort with the approval of the Head Office.
Selected Accomplishments:
Operate 5 windows 2003 servers at the head office of the company with applications, Financial Accounting from MGS system / Materials control system / Personnel management system / Legacy Materials control system / Garage management system / Car rental system at the Amghara warehouse and ancillary operations
Windows server 2003 / Isa Proxy / Powerbuilder development platform / Sybase Backend database server / clipper based legacy system
Managed to revamp complete network with cisco network and centralized Windows 2003 file server user storage.
I was fully in charge to control all IT implementation in the resort and completed until IT was deputed by the management company
I was also appointed IT manager for the Seashell Julai’a Hotel and Resort where I undertook the task for taking the handover from the Kempinski hotel management company. . I supervised the complete day to day operations of the resort. I was pivotal in creating various up-graded reports for the resort which was implemented in the resort with the approval of the Head Office.
ديسمبر 1996
إلى يناير 2002
Technical Support Manager
في STERLING INFORMATION TECHNOLOGIES – Mumbai, India
البلد :
الهند - مومباي
This is a multi-facet company with multiple operations. Graphic designing and Web Application Development & Internet browsing center spread across the city
Selected Accomplishments:
I created a network of Graphic workstation to deliver cutting edge printing technology pre-production.
I developed and created a network of graphic workstations and maintained cutting edge application implementation to deliver high quality pre-print processing in the printing industry.
I planned, designed and implemented a network of 20 workstations in each of the company browsing and cyber center managed in the city
Selected Accomplishments:
I created a network of Graphic workstation to deliver cutting edge printing technology pre-production.
I developed and created a network of graphic workstations and maintained cutting edge application implementation to deliver high quality pre-print processing in the printing industry.
I planned, designed and implemented a network of 20 workstations in each of the company browsing and cyber center managed in the city
يناير 1995
إلى أكتوبر 1996
Programmer Analyst
في SULTANAH ALLIED INDUSTRIES – Buraydah, Saudi Arabia
البلد :
المملكة العربية السعودية - بريدة
I worked with the company for a year and was in-charge of the computer Department which was involved in carving on the wooden panels of Qatar Palace - Al-Wajbah Complex
Selected Accomplishments:
I was the lead Analyst to implement and operate the NC (Numeric controller) machine import from CMS Italy.
I was in charge of generating programs for the numeric controller from AutoCAD Palace designs created by Kofra - France. I was the only person proficient in delivering the requirements for the project
I planned, designed and implemented a the operations for the Numeric controller
Selected Accomplishments:
I was the lead Analyst to implement and operate the NC (Numeric controller) machine import from CMS Italy.
I was in charge of generating programs for the numeric controller from AutoCAD Palace designs created by Kofra - France. I was the only person proficient in delivering the requirements for the project
I planned, designed and implemented a the operations for the Numeric controller
يوليو 1993
إلى ديسمبر 1994
Programmer & Technical Support
في INTERNATIONAL COMPUTERS AND COMMUNICATION CENTER – Al Khobar, Saudi Arabia
البلد :
المملكة العربية السعودية - الخبر
It was a subsidiary of an American company Gemini Systems - Illinois contracting to large oil and power companies
Selected Accomplishments:
We contractors and were trained by the original company to maintain and troubleshoot on the software development platform for any operational bugs in the programming we use to face.
The software was a package, let the PC to emulate as a dump Leeds and Northrop mainframe in the network and present the power distribution data graphs for the SCADA systems.
Selected Accomplishments:
We contractors and were trained by the original company to maintain and troubleshoot on the software development platform for any operational bugs in the programming we use to face.
The software was a package, let the PC to emulate as a dump Leeds and Northrop mainframe in the network and present the power distribution data graphs for the SCADA systems.
انشر على فيسبوك
انشر على تويتر
مشاركة عبر البريد الإلكتروني