Abdalla Salama, Maintenance Planning and IC Supervisor, SHE Pillars SME

Abdalla Salama

Maintenance Planning and IC Supervisor, SHE Pillars SME

General Motors Egypt and North Africa

Location
Egypt - Cairo
Education
Diploma, Advanced Material and technology
Experience
17 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 4 Months

Maintenance Planning and IC Supervisor, SHE Pillars SME at General Motors Egypt and North Africa
  • Ireland
  • January 2007 to January 2022

Main Tasks and responsibilities:
 Establish safe work practices as the highest priority and spearhead initiatives for ergonomics, health, and safety.
 Preparation of budget, consumable, tools, cap expenditure and contract cost based on analysis of historical costs and projected projects development core team during all project phases.
 Advise the spare part requirements expenditure.
 A member of projects development core team during all project phases.
 Advise the spare part requirements for the Engineering Stores.
 Drive organizational vision and maintain compliancy with local mission by consistently demonstrating core values and leading by example
 Lead the development of the departmental BPD board and cascade (SPQRCE, PDCA, Measures, etc.) and participate in BPD reviews at all levels
 Maintain plant policies and procedures and effectively communicate changes to staff
 Collaborate with cross-functional teams to implement best practices, resolve problems, and exceed performance objectives.
 Ensure that GMS is implemented properly and actively encourage a lean company culture
 Promote continuous improvement of all TPM activities in partnership with production (Operator, Maintainer, Planned, Preventative, Predictive, etc.)
 Manage and evaluate budgets and consistently exceed budgeting improvement targets
 Designed the annual maintenance plan and ensured compliance with the annual budget.

Senior Production Techology Engineer at LEONI Wiring Systems Egypt S.A.E
  • Egypt - Cairo
  • July 2014 to October 2015

As well as the below areas a new area is within my responsibilities: Applicator Maintenance area with a total no of 32 subordinate.
Maintain all the Preventive activities for 2000 applicator
Deals with the applicators supplier to sort any technical issues as well as spare parts modifications.
Monitoring applicators break-down and analyze performance.
Follow up the implementation of each new project and satisfy all the customer needs.
Handle all related customer concerns with the quality department.
E1, Collaboration and leadership element, team member
More than 3 years support for achieving ISO TS 16949 in Leoni.

Production Technology Engineer at Leoni Wiring Systems Egypt
  • Egypt
  • April 2011 to July 2014

Manage three areas: Non Production Store area, Manufacturing center area & APIPRO Software.
With a total no of 15 subordinate.
Maintain spare parts strategic items on semi-annual basis.
implement NPS Control Plan according to Budget.
Review and modify the spare parts control limits to ensure Spare Parts Availability.
Set up Standard Procedure for manufacturing processes in the Manufacturing center.
Construct a design office as well as qualified personnel.
Implement new machining techniques.
Develop the workshop capabilities (Manpower and Machines).
Best 5S Implementation place through Leoni.
Technological manufacturing center bench mark for Reverse Engineering Process in Leoni.
Contact person and first support of APIPRO Software in Region Egypt.
Maintenance Activities Planning (Corrective, preventive and predictive actions)
Train all new users on APIPRO software.
Control all Equipments data and maintenance actions.
Responsible for KPI’s for Technical Service Department.

Production Engineer at Energya Power Cables
  • Egypt - Cairo
  • March 2011 to April 2011

Complete on the job training in Wire Drawing Section.

Maintenance Engineer at The Egyptian Co.for Foods (BISCO MISR)
  • Egypt - Cairo
  • December 2009 to February 2011

Responsible for all Mechanical corrective and preventive activities.
Spare parts monitoring to increase machine availability.
New Hebenstreit wafer line installation time record and achieve a thank you letter for my support.
5 doubles the productivity and life time of ribbon used on the thermal transfer printers.
Planning of new machines and the factory lay out.

Quality Control Engineer at Alpha Tex
  • Egypt - Cairo
  • June 2009 to August 2009

Check and Inspect the samples of production items and revise with the standards.

Maintenance Engineer at Marmox Egypt-CMB group
  • Egypt
  • March 2009 to June 2009

Acting as the Maintenance manager for the factory.
Responsible for all Maintenance actions done through the factory.
Maintain the spare parts comsumption and the machines condiiton to be within the targets.
Installation of the new machines and lines.

Education

Diploma, Advanced Material and technology
  • at Faculty of Engineering,Ain Shams University
  • June 2011

Awarded an inernship project with co operation with T.U- Clausthal in Clausthal-Zeller Germany. Finsh a project of Compaction of Glass fibers in Dry state in only one month which was hard to accomplish in such a short term.

Bachelor's degree, Mechanical Engineering
  • at Faculty of Engineering,Ain Shams University
  • November 2008

Design and Production Engineering Department. Project: Rapid Prototyping machine (3D Printing machine) Grade: Excellent. Overal ranking: 13

Specialties & Skills

Warehouse Management
Maintenance Management
Maintenance Planning
Solidworks
SolidWorks
Warehouse Management

Languages

English
Expert
Arabic
Expert
German
Beginner

Memberships

Egypatian Engineering Syndicate
  • Member
  • November 2008
Federation of Arab Engineers
  • Mamber
  • January 2011
American Society of Mechanical Engineers
  • Member
  • January 2011

Hobbies

  • Playing Basket ball,reading books and mind games