Abdallah Hussein Manasrah, Acceptance team leader

Abdallah Hussein Manasrah

Acceptance team leader

Huawei

Lieu
Etats Unis - Floride - Tampa
Éducation
Baccalauréat, communication engineering
Expérience
7 years, 3 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :7 years, 3 Mois

Acceptance team leader à Huawei
  • Arabie Saoudite - Riyad
  • décembre 2014 à septembre 2016

•Managing and controlling site acceptance/handover related activates (outdoor & indoor).
•Acting as a SPOC for Huawei acceptance department.
•Play a major role in Zain Reload project,  in terms of managing,  controlling & ensuring the
project progress compliancy with the agreed plan & KPI’s.
•Project documents preparation,  verification & validation (BoQ,  SAF,  TD,  PAT documents,
As-Built,  etc.)
•Prepare and maintain timely and accurate project status reports (daily,  weekly and
monthly) along with the process evaluation report and work plan.
•Insure Huawei work standards are properly delivered to the project stakeholders.
•Involved in projects close-out.
•Conduct audits & project quality assurance in terms of BoQ,  SAF & PO compliancy.
•Arranging & chairing weekly team meetings,  focusing on targets & achievements.
•Insure the document distribution by Transmittal System as per document distribution
matrix for hard copy and Electronic Document Transfer (EDT).

Telecom Supervisor à Nanotechnology Communications and Information Technology Establishment.
  • Arabie Saoudite - Riyad
  • septembre 2012 à décembre 2014

•Plans and monitors delivery phase of project.
•Maintain timely and accurate documentation and reporting.
•Administering the project budget by ensuring timely and accurate invoicing and
monitoring receivables.
•Manage prepare project status & progress reports.
•Manage project resources to get the contractual KPIs.
•Reviewing the documented requirements of the project.
•Coordinating with Project Coordinators &team members of different locations.
•Manage day-to-day operational aspects of a project to ensure timely comple-
tion.

Project Team Leader  à SAMSUNG
  • Arabie Saoudite - Riyad
  • août 2010 à août 2012

•Supervised the sites survey activities and preparing work plans for each team
on weekly basis.
•Leading and coordinating with up to 6 project teams.
•Held meetings with Mobily representatives & management in order to share and
discuss the implementation progress on weekly basis.
•Supervised the implementation phase,  acceptance,  PAT & Pre-PAT.
•Managing and distributing the schedules of the clean-up activities.
•Involved in the project invoicing processes.
•Generate various technical documents and progress reports.

IBS Project engineer à Advanced Communication and Electronic Systems Co. LTD.
  • Arabie Saoudite - Riyad
  • juillet 2009 à juillet 2010

•Involved in the sites acquisition and site survey.
•Conduct Walk Tests (WT) and Propagation Tests.
•Selection of antenna positions and measuring the feeder’s route.
•Performing system design,  link budget analysis (2G & 3G) and BOQ.
•Supervising the implementation phase and follow-up with the subcontractors.
•Perform quality assurance inspection for the newly implemented sites.
•Site work finalization and preparation for PAT with the necessary documents.
•Generate various technical reports on daily,  weekly,  monthly basis.

Éducation

Baccalauréat, communication engineering
  • à engineering
  • juin 2009

Specialties & Skills

Teamwork
Report Writing
IP Networking
following up
Team Leadership
Microsoft Office
Internet

Langues

Anglais
Moyen

Adhésions

Jordan Engineers Association
  • Member
  • August 2009
Saudi Council of Engineers
  • Member
  • February 2012

Formation et Diplômes

CCNP Routing and Switching (Formation)
Institut de formation:
Abad
Date de la formation:
September 2014
CCNA Routing and Switching (Certificat)
Date de la formation:
July 2014
Valide jusqu'à:
July 2017

Loisirs

  • Video games ,swimming ,movies