Abdallatief Tahon, Senior Planning Engineer

Abdallatief Tahon

Senior Planning Engineer

CSCEC (China State Construction & Engineering Corporate)

Lieu
Egypte - Le Caire
Éducation
Master, Construction Project Management
Expérience
13 years, 0 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :13 years, 0 Mois

Senior Planning Engineer à CSCEC (China State Construction & Engineering Corporate)
  • Egypte - Le Caire
  • Je travaille ici depuis août 2018

Project:
Central Business District CBD at New Administrative Capital

Planning / Scheduling Engineer à GS Engineering & Construction
  • Egypte - Le Caire
  • avril 2016 à août 2018

Project: ERC Refinery Project at Mostorod

Planning Engineer à Orascom Construction
  • Egypte - Le Caire
  • février 2016 à avril 2016

o Studying the drawings, contract and specs
o Working on projects baseline schedules
o Preparing the resource histogram for key resources
o Performing resource management
o Develop work method of statement or procedure as required.
o Making schedule narrative
o preparing the markup drawings which will be the basis of work progress monitoring.

Planning Engineer à ORASCOM Construction Industries
  • Egypte - Le Caire
  • novembre 2015 à février 2016

Projects:

1- Burullus Combined Cycle Power Plant (Siemens-Orascom Consortium)
2- West Damietta Combined Cycle Power Plant

Technical Procurement Engineer à ORASCOM Construction Industries
  • Egypte - Le Caire
  • août 2015 à novembre 2015

Power Generation Egypt Business Unit (PGEBU)

Projects:

1- Burullus Combined Cycle Power Plant 4800 MW (Siemens-Orascom Consortium)

2- West Damietta Simple Cycle Power Plant 500 MW

o Studying the drawings to determine the material which the project need and start its procurement procedures
o Reviewing shop drawings with the project specs. and their coordination with the MEP works.
o Surveying quantities of the civil and architectural items in the projects.
o Making price comparison for the nominated suppliers and subcontractors.
o Preparing B.O.Qs for the nominated contracts.
o Reviewing subcontractors submittals
o Making material submission to the consultant for approval and fulfill the comments.
o Making P.Os and P.Rs for materials
o Follow up the supply of the material to site and its installation.
o Reviewing contracts prepared for the subcontractors.
o Making invoices for the sub-contractors.
o Making contracts addendum when needed

HSE Engineer à ORASCOM Construction Industries
  • Egypte - Le Caire
  • juillet 2015 à août 2015

Project: Mall of Egypt (Besix-Orascom Joint Venture)

o Safety inspection in site, monitoring the processes and making preventive and corrective actions.
o Reporting to the responsible construction managers with their Safety violations weekly.
o Training for new hired employees.
o Proceeding in the HSE procedures and its documentation system.

QC Engineer à ORASCOM Construction Industries
  • Egypte - Le Caire
  • avril 2015 à juillet 2015

Project: Mall of Egypt (Besix-Orascom Joint Venture)
o Shared the responsibility for Ski, Cinemas and Family Entertainment Center zones.
o Inspection of R.C foundations, columns, beams, slabs, walls, stairs, slab on grade f.w and rft..
o Inspection of strengthening of the elements having new overloads.
o Delivery of the inspected works to consultant.
o Making regular quality checks in site as part of the quality assurance.
o Implementing quality assurance procedures and documentations.

Site Construction Engineer à ORASCOM Construction Industries
  • Egypte - Le Caire
  • octobre 2014 à avril 2015

Project: Mall of Egypt (Besix-Orascom Joint Venture)
o Managing 2 zones of 12 in the mall including inspection and delivery to QC and Consultant.
o Working on the finishing works (block works, Plastering and Doors Frames).
o Making KPIs for daily production and achievement of deadlines.
o Revising the drawings before execution.
o Coordinating between the finishing works and MEP works.
o Coordination of equipments, tower cranes and other lifting equipments.
o Supervising and making payments for subcontractor.
o Inspections of columns, R.C footings, strip footing and retaining wall (reinforcement and formwork).

Tendering Engineer à ORASCOM Construction Industries
  • Egypte - Le Caire
  • août 2014 à octobre 2014

Project: Makkah Metro Phase one Construction Works CW-1 & CW-2
(Orascom Yabi Markazi Joint Venture)

** We won the first place in the technical evaluation of the bids by the owner **

o Studying the client tender documents and drawings
o Studying the project’s schedule which is done using the time-chainage principal.
o Working on the project organizational charts and the project staff schedule.
o Working on the project time schedule using PRIMAVERA and the Schedule Narrative.
o Calculating storage areas required for the project “Precast Yard” TBM and Viaduct elements.
o Working on the construction methodologies for the underground metro stations, elevated stations and the viaduct spans.
o Working on the project methods statement, Tender Strategy, Resource Leveling and Manpower Histogram, Knowledge Transfer Plan and Interface Management Plan.

Technical Office Engineer à ORASCOM Construction Industries
  • Egypte - Le Caire
  • mai 2014 à août 2014

Project: New Ministry of Interior Headquarter
o Making structural shop drawings for (Foundations, Columns, Beams, non regular Flat Slabs, non
regular Ripped Slabs and Stairs).
o Checking the design for errors before making the shop drawings.
o Making the BBS (Bar Bending Schedule) for each submitted shop drawing.
o Coordination between structural, MEP and Arch elements before issuing the shop drawings.

QA/QC Engineer à EGEC - Engineering House of Expertise
  • Egypte - Le Caire
  • mars 2012 à avril 2014

I’ve participated in the company ISO renewal two years in row 2013 and 2014 as an “Assistant Quality Manager”.


Quality Assurance and Quality Control of company's design and construction supervision projects

o Promoting quality achievements and performance improvement through the organization.
o Ensure that the QMS ISO-9001 target and goal is achieved
o Ensure compliance with ISO-9001
o Ensuring that Quality Procedures are properly understood, carried out and implemented.
o Monitoring performance by scheduling and performing audits activities, including pre auditing plan, audit execution and evaluation and post audit follow up and audit reports.
o Ensure that the implementation of corrective actions plans are done to improve the overall ISO-9001 compliance and quality results.
o Present to managers reports including the organizational performance implementing the QMS.
o Ensure applicability of current quality policies, procedures and objectives by keeping informed of the latest updates/ modifications related to ISO-9001.
o Study, develop, continuously improve and maintain the performance and effectiveness of the company Quality Management System.
o Making analysis for all the company’s disciplines for their performance applying the QMS.
o Making KPIs analysis for the company, and present it to the B.O.D.

Structural design engineer à Ashraf Ibrahim consulting office
  • Egypte - Le Caire
  • juillet 2012 à septembre 2012

o Analysis and design of the different structural elements in the high rise
buildings.
o Making the Checks on wind and earthquakes’ effects.

Free civil engineer à Myself
  • Egypte
  • novembre 2011 à février 2012

making archetctural designs
making structural designs

Trainee as engineer à El Deeb for construction
  • Egypte - Le Caire
  • juillet 2010 à septembre 2010

Concrete works
Tendering

Trainee as engineer à AL Khalig Al Masreia for construction
  • Egypte - Le Caire
  • juillet 2009 à septembre 2009

Concrete works
Finishing works
Tendering

Éducation

Master, Construction Project Management
  • à Zagazig University
  • février 2018

o Master's research thesis in the Construction Material Sustainability field. o The following courses were attained through Pre-Masters:  Construction Quality Management  Bid Study  Computational Methods  Contracts, Claims And Disputes  Productivity  Java Programming Language  Linear Programming  Projects Evaluation  Financial Management  Planning Techniques  Time Value of Money

Baccalauréat, Civil engineering
  • à Zagazig university
  • mai 2011

- Bachelor's degree of engineering May 2011 / Civil engineering department / Zagazig University. Graduation project: construction project management Overall grade: good Final year grade: very good Graduation project grade: Excellent Technical & Educational courses -course in the engineering drawing program: Auto CAD -course in the structural engineering program: SAP -course in the construction management program: primavera -course in architectural design. -course in the surveying using (Total station). - Any courses have relation

Specialties & Skills

Teamwork
Leadership Capabilities
MS Office MS Word MS Excel MS Power point
Project Management
Working Under Pressure
MS: Excel
MS: Word
MS: Power point
Ability of building good social relations.
Internet
Java programming
Ability of working under pressure.
MS Access
AutoCad
MS Project
Primavera P6

Langues

Arabe
Expert
Anglais
Expert

Adhésions

Egyptian Engineering Syndicate
  • Member
  • October 2011

Formation et Diplômes

Architectural Design (Certificat)
Java Programming Language (Certificat)
Presentation Skills (Certificat)
TOEFL (Certificat)
Leadership skills (Certificat)
OSHA (Certificat)
Total Station (Certificat)
Communication Skills (Certificat)
Business Writing and Netiquette (Certificat)
Quality Internal Auditor (Certificat)
Quality Management System (Certificat)
SAP (Certificat)
Auto CAD (Certificat)
Project Life-cycle (Certificat)
Primavera P6 (Certificat)
Finance for Non-Financers (Certificat)
Date de la formation:
July 2015
PMP Preparation Course (Certificat)
Date de la formation:
September 2015

Loisirs

  • playing sports
    having the black belt in Karateh