ABDELAZEEZ SAYED ABDELAZEEZ MOHAMMED EL DEEK, Construction Project Manager

ABDELAZEEZ SAYED ABDELAZEEZ MOHAMMED EL DEEK

Construction Project Manager

Al Raeel Engineering Construction & Development Co. (ARCCO)

Lieu
Arabie Saoudite
Éducation
Baccalauréat, B.Sc. in Civil Engineering
Expérience
21 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :21 years, 11 Mois

Construction Project Manager à Al Raeel Engineering Construction & Development Co. (ARCCO)
  • Arabie Saoudite - Yanbu
  • Je travaille ici depuis novembre 2022

Projects:
• Start-Up Transportation Hub on a 22, 389 sq.m plot area in the Logistic Zone at the Red Sea, KSA (SAR 68, 766, 913), 7 Months, with Red Sea Global as an Employer & Atkins as a Consultant.
Responsibilities:
• Overseeing and directing construction projects from conception to completion
• Delivered the project from pre-contract to construction and handover stages
• Defined project goals, objectives, and plans, including delineation of scope, scheduling, setting performance requirements, project logistics, construction methodology, and assigning field-specialists
• Overseeing all onsite and offsite constructions to monitor compliance with building and safety regulations
• Negotiated the terms of contracts/agreements, drafted contracts, and obtained permits/licenses from appropriate authorities
• Collaborated with engineers, architects, etc. to determine the specifications of the project
• Conducted quality/ safety standards to ensure adherence to quality and safety norms and report issues during the entire course of project execution
• Provided overall project and team leadership
• Coordinated and directed construction workers and subcontractors
• Reviewed the work progress on a daily basis
• Drafted monthly status reports including cost, schedule, safety, and cash flow for internal and/or external use.
• Evaluating, managing, and mitigating risks
• Ensuring quality construction standards and using proper construction techniques to achieve success
• Determined needed resources (manpower, equipment, and materials) from start to finish with attention to budgetary limitations
• Monitoring and directing the assigned project resources
• Overseeing project proposal documents, infrastructure specifications, project documents/submittals, and drawings in compliance with the organizational guidelines and project requirements
• Utilizing defined project processes to manage quality, changes, risks, issues, financial implications, and escalated issues impacting project performance and timetable
• Resolved problems, disputes, and scheduled work, also participating in progress and coordination meetings
• Managed RFIs, submittals, and change orders
• Managed project close-out procedures and ensure that process is completed

Resident Engineer à Eng. Mohd. Al Shaikh Mubarak Architectural & Eng. Consultants
  • Émirats Arabes Unis - Dubaï
  • novembre 2017 à mai 2022

Projects:
• Residential commercial building consists of 2B+G+6+R built on a 6, 389 sq.m plot area at Al Muteena, Dubai (AED 100, 000, 000), 30 Months, Al Ashram Contracting, Al Ghurair Properties.
• Residential commercial building consists of 2B+G+6+R built on a 5, 882 sq.m plot area at Al Muteena, Dubai (AED 94, 000, 000), 30 Months, Al Ashram Contracting, Al Ghurair Properties.
• Residential commercial building consists of G+P+13+R built on a 6, 600 sq.m plot area at Al Quosais, Dubai (AED 120, 500, 000), 30 Months, Bust Contracting, Al Ghurair Properties.

Primary Duties & Responsibilities:
• Ensure that the construction contracts and deliverables meet the company’s objectives in terms of time, cost, and quality.
• Manage the development of the project execution plan and the project schedule, conducting weekly construction meetings with the Stakeholders to monitor the work progress and ensure that the project is on track.
• Project planning and responsible for overall execution of activities required.
• Following an appropriate project management methodology.
• Ensuring the project conforms to authorities’ requirements and conditions.
• Leading the project team to meet the project’s objectives and oversee tasks and progress.
• Leading diverse project teams, both face to face and remotely.
• Remove impediments to the Team’s progress.
• Practice and facilitate effective communication among team members and stakeholders.
• Accountable for managing risks, dependencies, and escalating issues where appropriate.
• Communicate with the involved parties to move the projects towards their defined goals.
• Manage all contractual quality standards.
• Ensure the project close-out process is completed.

Project Manager à Emirates Coast Contracting ( Al Shafar Investment Group )
  • Émirats Arabes Unis - Dubaï
  • avril 2017 à septembre 2017

• Residential building consists of B+G+6+R+UR in Reffaah, Dubai (AED 42, 596, 417), 19 Months, Al Turath Engineering Consultants, Al Ghurair Properties.

Projects Manager à Sharjah Government – Directorate of Public Works ‎
  • Émirats Arabes Unis - Sharjah
  • février 2015 à janvier 2017

‎1-‎ Dibba Al Hesn Nursery - ( 8, 311, 363 Dhs. ) - 8 Months - First Art Engineering Consultancy - ‎Dar Alwd Construction Company.‎
‎2-‎ Dibba Al Hesn Beach - ( 11, 155, 828 Dhs. ) - 4 Months - Halcrow International Partnership ‎‎(CH2M HILL Halcrow) - Darwish Engineering Emirates.‎
‎3-‎ Al Jazeerah Sewage Lifting Station in Dibba Al Hesn - ( 7, 280, 330 Dhs. ) - 6 Months - ‎Halcrow International Partnership (CH2M HILL Halcrow) - Al Marfaa Road Contracting Co.‎
‎4-‎ Olympic Sports Complex in Al Batayeh Sports Club - ( 39, 500, 000 Dhs. ) - 11 Months - Al ‎Rukn Al Meamary Engineering Consultants - Fast Building Contracting Company.‎
‎5-‎ Olympic Sports Complex in Al Madam Sports Club - ( 39, 900, 000 Dhs. ) - 11 Months - Al ‎Rukn Al Meamary Engineering Consultants - Fast Building Contracting Company.‎

Project Manager à Emaret Al Sharq Engineering Consultancy ‎
  • Émirats Arabes Unis - Dubaï
  • septembre 2014 à février 2015

‎1-‎ Residential and commercial building consists of B+G+15 T+H.C+R in Dubai Sports City- ( ‎‎53, 785, 000 Dhs. ) - 8 Months - Emaret Al Sharq Engineering Consultancy - Ali Bin Salim ‎Contracting Company.‎

Projects Manager à Arabian Group Engineering Consultations
  • Émirats Arabes Unis - Ras al-Khaimah
  • août 2008 à septembre 2014

Responsibilities:
• Acting in the capacity of The Engineer's Representative in front of Clients, Contractors, and Authorities.
• Implement all the company policies, and procedures inclusive of health and safety plans and site supervision manual to ensure the health, safety, and welfare of self and others.
• Administer the Construction Contract.
• Issue Contractual letters and maintain contemporary records.
• Issue recommendations on variations and claims. Review and certified the Contractor’s payments.
• Lead the progress/technical/commercial meetings.
• Leading diverse project teams, both face to face and remotely.
• Provide technical expertise & advice regarding to project scopes and quality.
• Prepare project reviews and report on performance.
• Ensure that the project documentation is correctly maintained.
• Deal with clients, contractors, suppliers, and subcontractors. Collaborate and coordinate with Client 3rd parties.
• Manage project close-out procedures and ensure that process is completed.

Quality Manager à Ras Al Khaimah ReadyMix
  • Émirats Arabes Unis - Ras al-Khaimah
  • octobre 2010 à décembre 2011

Responsibilities:
• Oversee the complete production process including concrete mix design, conducting of tests within a laboratory environment, provided accreditation
• Ensured compliance of every process by consistently examining and testing raw materials, collecting samples, preparing daily operations reports on concrete pouring as well as preparing monthly reports and statistics on production and quality leading to improved performance and increased production
• Communicating with Clients on a regular basis to understanding their needs, and requirements to achieve the Client’s satisfaction.
• Delegated and distributed tasks to laboratory team and check-up the performance.

Projects Manager à ENJAZ Construction
  • Émirats Arabes Unis - Ras al-Khaimah
  • décembre 2004 à octobre 2010

Responsibilities:
• Overseeing and directing construction projects from conception to completion.
• Delivering the project from pre-contract to construction and handover stages.
• Defining project goals, objectives, and plans, including delineation of scope, scheduling, setting performance requirements, project logistics, construction methodology, and assigning field-specialists.
• Overseeing all onsite and offsite constructions to monitor compliance with building and safety regulations.
• Negotiating the terms of contracts/agreements, drafting contracts, and obtaining permits/licenses from appropriate authorities.
• Collaborate with engineers, architects, etc. to determine the specifications of the project.
• Conducting quality/ safety standards to ensure adherence to quality and safety norms and report issues during the entire course of project execution.
• Provide overall project and team leadership.
• Coordinating and directing construction workers and subcontractors.
• Reviewing the work progress on daily basis.
• Prepare monthly status reports including cost, schedule, safety, and cash flow for internal and/or external use.
• Evaluating, managing, and mitigating risks.
• Ensuring quality construction standards and using proper construction techniques.
• Determine needed resources (manpower, equipment, and materials) from start to finish with attention to budgetary limitations.
• Monitoring and directing the assigned project resources.
• Overseeing project proposal documents, infrastructure specifications, project documents/submittals, and drawings in compliance with the organizational guidelines and project requirements.
• Utilizing defined project processes to manage quality, changes, risks, issues, financial implications, and escalated issues impacting project performance and timetable.
• Resolving problems, disputes, and scheduling of work, also participating in progress and coordination meetings
• Manage RFIs, submittals, and change orders.
• Manage project close-out procedures and ensure that process is completed.

Project Engineer à MARCO Engineering&Contracting
  • Egypte - Le Caire
  • juin 2003 à décembre 2004

1- Execution of finishing works of the public transport authority hospital in Abdel Khalek
Tharwet st.
2- Execution of structural & finishing works of two villas consist of basement, ground floor, two
typical floors and roof rooms in New Cairo close to El Shewifat international school .
3- Execution of structural & finishing works of residential building consist of basement, ground
floor, five typical floors and roof rooms in New Cairo City close to El Shewifat international
school.
4- Execution of structural works of private villa consist of basement, ground floor, two typical
floors and roof rooms in the first zone, north of El Shewifat in New Cairo City.
5- Check all structural drawings for all above projects.
6- Finish quantities estimation (B.O.Q) for all above projects.
7- Prepare bill of payments for suppliers and subcontractors

Structural Design Engineer à Saquer Quoraish Consultant Engineering
  • Egypte - Le Caire
  • juin 2002 à décembre 2002

1-Design of residential building consists of B+G+3 in New Cairo.
2-Design of residential building consists of G+3 in El Nozha El Gedida.
3-Design of residential building consists of B+G+11 in Nasr City.
4- Check of structure for several projects.
5- Checking structural drawings.

Training à SPACE Company – Dr. Medhat Dora
  • Egypte - Le Caire
  • février 2002 à mai 2002

Training in structural design of buildings and constructions

Training à Talaat Mustafa Group
  • Egypte - Le Caire
  • mai 2001 à septembre 2001

Training in Rehab City for execution of all concrete constructions works in Rehab City Club.

Training à Talaat Mostafa Group
  • Egypte - Le Caire
  • mai 2000 à août 2000

Training in Rehab City for execution of all concrete constructions works in buildings’ area, villas’
area and mall area.

Éducation

Baccalauréat, B.Sc. in Civil Engineering
  • à Higher Technological Institute in Tenth of Ramadan City
  • mai 2002

Grade Point Average : 2.55 Percentage : 70.50% Grade of B.Sc. Project: First Project : Design of Reinforced Concrete Grade: Excellent Second Project: Testing & Properties of Material Grade: Excellent

Specialties & Skills

Commercial Buildings
Residential Buildings
AutoCAD
Project Management
Civil Engineering
Reinforced Concrete
Ready Mix Concrete
Project Management
Contractor/Consultant/Client
AutoCAD
Microsoft Word/Excel
Organization Skills
High Level of Accuracy
Reports Writing
Team Leadership
Negotiation

Langues

Arabe
Langue Maternelle
Anglais
Expert

Adhésions

Society of Engineers U.A.E. .
  • Member
  • May 2005
Egyptians Engineers Syndicate .
  • Member
  • May 2002
Ras Al Khaimah Municipality
  • Authorized from Ras Al Khaimah Municipality to execute unlimited ( high rise ) buildings
  • June 2014
Federation of Arab Engineers .
  • Member
  • March 2012

Formation et Diplômes

AIGPE™ Certified Six Sigma Green Belt (Certificat)
Date de la formation:
August 2022
Google project management (Certificat)
Date de la formation:
July 2022
Project Management Professional (PMP).‎ Covering the 10 PM knowledge areas and professional ‎respons (Formation)
Institut de formation:
The Egyptian Lobby
Date de la formation:
November 2017
Durée:
35 heures
Project Management Professional (PMP).‎ Covering the 10 PM knowledge areas and professional ‎respons (Formation)
Institut de formation:
Clarity Consultants Institute - UAE.‎
Date de la formation:
February 2016
Durée:
40 heures
Project Management Scheduling using Primavera ‎ (Formation)
Institut de formation:
Society of Engineers - UAE
Date de la formation:
July 2008
Durée:
12 heures
electrical works (Formation)
Institut de formation:
Ministry of Housing, Utilities and Urban Communities‎
Date de la formation:
July 2002
Durée:
100 heures
IELTS (International English Language Testing System) ‎Preparing Exam ‎ (Formation)
Institut de formation:
British Council ‎
Date de la formation:
October 2016
Durée:
24 heures
The New FIDIC Red Book 99 ‎ (Formation)
Institut de formation:
Society of Engineers - UAE
Date de la formation:
January 2015
Durée:
12 heures
Microsoft Certified Professional (MCP)‎ (Formation)
Institut de formation:
Scholarship from Ministry of Communication and ‎Information Technology by Orascom Technology Co. ‎wi
Date de la formation:
September 2002
Durée:
500 heures
Value Engineering in Construction Projects ‎ (Formation)
Institut de formation:
Society of Engineers - UAE
Date de la formation:
August 2015
Durée:
12 heures

Loisirs

  • Walking
  • Swimming
  • Traveling
  • Reading