Mechanical Section Head Engineer
Zaid El Hussein Group
مجموع سنوات الخبرة :12 years, 5 أشهر
Project: King Abdullah International Gardens.
Review Shop drawings, Bill of Quantity and specifications For All Mechanical Activities (Duct & Chilled & Fire Fighting & Plumbing & Water Features & Equipment's and Infrastructural).
Prepare Quantity survey and Issue material requisition.
Manage and coordinate Between subcontractors and suppliers To Receive the Material as per project time schedule.
Supervision all mechanical Activities at site as per approved shop drawings.
Verify all work done with high quality according to client requirements and with safety manner.
Prepare weekly and monthly progress report to disuse with project manager and planning team.
Project : MICI Conference Hall. Consultant: Dar.
Project : Historical City. Consultant: ECG.
Project : MN Data Center. Consultant: Shaker.
Responsibilities:
Review and verification of MEP design drawings, BOQ and specifications.
Make Quantity survey and Issue material requests for all Mechanical activities.
Cost estimation for all Mechanical activities.
Manage and coordinate with MEP subcontractors and suppliers as per project time schedule.
Prepare Subcontractor Invoices.
Update As-built Drawings and send it to consultant for approval.
Prepare weekly and monthly progress report to disuse with project manager and planning team.
Implementation and monitoring all mechanical works at sites as per approved shop drawings.
Verify all work done with high quality according to client requirements and with safety manner
Installation for all equipment (Chillers, Cooling Towers, Fans, CRAH, FCU, AHU and Pumps).
Fabrication & erection and testing for all MEP piping activities with supporting system.
Insulation and Cladding activities for piping network.
Organize Chemical flushing and commissioning activities for piping networks.
Water balancing for all equipment.
Installation for Infrastructural Networks (FF & WS and Drainage) including valve boxes and fire-hydrants.
Project : New Art and Culture City (Opera). Consultant: ECG.
Project : Petroleum Refinery Laboratory (ERC). Consultant: GSE&C.
Responsibilities:
Fabrication and Erection for All Piping Activities According to Isometric Drawing & P&ID and ASME B31.3.
Make Quantity survey and Issue material requests for all Mechanical activities.
Attend Meeting with Main-Contractor to Discuss About the Project Progress and Material Issues.
Prepare Piping As-Built Drawing as Per Site Conditions for Any Modification Required.
Fabrication of Fire and Potable Water Piping Networks (HDPE).
Fabrication of Sewage and Storm Piping Networks (UPVC).
Fabrication of Perforated Sub-Soil Piping Networks.
Client : HCWW
Responsibilities:
Make Quantity survey and Issue material requests for all Mechanical activities.
Attend Meeting with Main-Contractor to Discuss About the Project Progress.
Fabrication of sewage pipeline 560 mm (HDPE).
Fabrication of Potable Water HDPE 1000 mm (HDPE).
* Infrastructural Engineer.
Company: Woqod Masr for Oil Services and Gas Projects.
Client : Ripco Gas (TAQA Arabia).
Responsibilities:
Make Quantity survey and Issue material requests for all Mechanical activities.
Attend Meeting with Main-Contractor to Discuss About the Project Progress.
Fabrication of Natural Gas Piping Networks for More Than 100, 000 Residential Customers. (HDPE).
Fabrication of New sea water Desalination Plants with Different Capacities and Highest Energy
Recovery Technology (Pressure Exchanger).
Installation for all equipment (HPP, PX, MMF, CF and Pressure Vessel).
Fabrication and erection for all piping activities with supporting system.
Make Quantity survey and Issue material requests for all Mechanical activities.
Attend Daily Meeting with All Company Departments to Discuss and Coordinate All Related Work
Progress and Impediments.
Prepare Daily & Bi-Weekly and monthly reports for New Projects Status and RO Plants.
,
لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.