Planning manager
SYSTRA
Total years of experience :13 years, 1 Months
** EAST EUROPEAN HIGH SPEED LINE 2ND PHASE : RAILWAY EQUIPMENT
- Manage the coordination of the project’s work
- Manage the coordination of the tunnel’swork : analyze, prepare, coordinate and monitor
- Establish and update schedules to prepare the monthly reporting schedule at at project ownership (POW)
- Check the relevance of planning documents produced by firms
** EAST EUROPEAN HIGH SPEED LINE 2ND PHASE : RAILWAY EQUIPMENT
- Establish and update schedules to prepare the monthly reporting schedule at MOA
- Improve the efficiency of project management
** IMPROVING OPERATIONAL EFFICIENCY (RO) LINE ASSEMBLY ENGINE DW1, 2012
- Break the different causes of non RO
- Analyze and propose action plans
- Study reliability targets of assembly lines
- Analysis of non-compliance of a machining center
- Study of the influence of temperature on the belt
- Establishment of a dynamic belt tensioner on boring unit
** OPTIMIZATION OF MAINTENANCE WORK 2010
- Improve methods of maintenance management
- Enable improvements on ERP: SAP (PS Module, Module PM)
- Create a training plan and train operators to use the software
Aircraft maintenance; engines, brakes, landing gear, structures
2012-2013: Mastère Spécialisé 'Management Industriel: Projets et Supply Chain'
Engineering degree in“Mechanical and Production Engineering”