Project Engineer
TAQAMISR
مجموع سنوات الخبرة :11 years, 1 أشهر
Duties in Heating: • Diagnosing faults on boilers and other domestic gas appliances. • Reading maps and building plans to find the exact location of gas boiler, pumps, radiators, manifold panels and solar tanks . • Installing gas boilers and central heating systems in domestic and commercial buildings. • Visiting customers properties and carrying out maintenance, service and repair work on their gas central heating systems. • Planning and prioritizing own work activities and managing own time efficiently. • Promoting quality in installation, commissioning and start up in the workplace. Duties in Solar Energy: • Checking plans, drawings and quantities for accuracy of calculations. • Ensuring that all materials used and work performed are as per specifications. • Overseeing the selection and requisition of materials and plant. • Agreeing a price for materials and making cost-effective solutions and proposals for the intended project. • Controls project plan by reviewing design, specifications and plan and schedule changes. • Prepares project status reports by collecting, analyzing and summarizing information and trends. • Maintains project schedule by monitoring project progress.
• Site management and handling of the work as per drawing and method statements.
• Monitoring progress of work as per schedule.
• Arrangement of materials . Analyze the customer’s objective and needs.
• According to the clients requirement plan and direct all resources to meet operating and financial goals.
• Perform individual site inspection and control of the quality at site as per requirement.
• Ensure the implementation of design on the site.
• Supervise the technicians’ team, contractors .
• Maintained daily and weekly work records and reported to the higher officials
Site management and handling of the work as per drawing and method statements .
-Supervision on all teamwork in site and organize all work of them.
-Monitoring progress of work as per schedule.
-Control of the quality at site as per requirement.
-Arrangement of materials and manpower.
-Closing of punch list.
• Check in the airplane and make sure that the airplane is complete.
• Disassemble the airplane as the task card order.
• Inspect the airplane searching for flaws, cracks, bad repair and mainly corrosion
• Using different N D I method and tools.
• Repair or replace defect parts as the R&D department order.
• Assemble the airplane as the task card order.
• Open, close, manage and control the task card of each department.
Preparing pre _Master in Mechanical department in Faculty of Engineering in Cairo University Relevant Coursework : Measurements , Math ,Technical Language , Heat transfer, Solar energy ,Fluid. From 2013 until now
Bachelor of Science in Aeronautical Engineering, (BSAE) from Institute of Aviation Engineering and Technology (I.A.E.T) - very good with Honor (80.6%). Relevant Coursework: Fluid mechanics, Aerodynamics, Thermodynamics, Heat transfer Mechanical structures, Production Technology, Aircraft Propulsion, A/C stability and Performance, Hydraulics, Pneumatic, Piping and A/C design. Projects: 2 A. "Structure Design of Military Aircraft (Alenia C-27J) "July 2011 Grade : Excellent Under Supervision : Prof . Dr. Hany Nagem Achievements: A. Calculation of aerodynamic loads on the fuselage in the different flight conditions. B. Performing a preliminary design for the wing based on the calculated aerodynamic load and landing load.. C. Building a finite element model. D. Verifying and modifying the preliminary design using the finite element model. E. . Airpalne fuselage design based on project objectives and flight mission. F. Using Nastran program to analysis loads on fuselage. B. Analysis of composite materials May 2010 Analysis and calculation of stress and strain for a composite material skin. C. Flow over Joukwoski Airfoil March 2010 Inviscid and viscid flow around Joukwoski airfoil solved through transforming the problem to around cylinder.