Najeem Abdul Aziz, Construction Manager

Najeem Abdul Aziz

Construction Manager

GEC

البلد
قطر
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
18 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :18 years, 2 أشهر

Construction Manager في GEC
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ يوليو 2019

M/S GEC Trading & Contracting, DOHA, Qatar
Construction Manager
July 2019 to at present

Project: Doha south Terminal pump station & odour control system
Project: C816/2 Construction of foul Network- Inner Doha package-2

 Engineering & selection for the major mechanical equipment’s which includes but not limited to following:
 Sizing and selection of piping based on process design criteria.
 Pipe routing for minimum frictional losses and easy installation within the project specification.
 Selection of penstocks according to the On-seat and Off-seat pressure.
 Reviewing impact on cost & time of contract changes & advising PM.
 Check & review of technical submittals & method statements prepared for the Consultant approval.
 Assist the PM in the preparation of work procedures & Method statement.
 Upon approval of material submittal from consultant, release the Purchase order in coordination with procurement department.
 To ensure delivery of the material/Equipment as per project schedule.
 Check & review of shop/layout drawings prepared for consultant approval. Also ensuring accuracy with coordination from the supplier as well as other departments such as civil, electrical & instrumentation. Reviewing, coordinating & finalizing field design changes.
 Coordination of all construction works including sub-contractors.
 Kahramaa water line installation, testing, disinfection & handing over.
 Planning the work to be done and organize things so that project deadlines are met.
 Supervision/Monitoring of Site team for Installation, testing & commissioning of the equipment’s as per approved drawings, method statement and project specifications requirements.
 Coordination with the commercial department for variation claims; if any.
 Overseeing preparation of O&M Manuals and as built drawings.
 Implementation of safety procedures.
 Sub- contractors’ invoices review & approvals.

srProject Engineer في Bin Omran Contracting
  • قطر - الدوحة
  • يونيو 2016 إلى يونيو 2019

Project: Al Bayt Stadium Project, Al Khor
 Responsible for the preparation of the budget of the project, procurement & Site management for all the MEP & Infrastructure utility activities.
 Resolve the project technical issues & preparation of shop drawings for HVAC, Plumbing, Fire Fighting & infrastructure utilities (Chilled water, Drainage, water supply, Fire Fighting &Pump stations)
 Assisting for hiring the MEP sub-contractors & finalizing their contract as per the work scope.
 Preparation of operation & maintenance Manual & asset coding as per client requirement.
 Attend the meetings with client & consultant

Senior mechanical engineer في Urbacon Trading and Contracting
  • قطر - الدوحة
  • سبتمبر 2015 إلى مايو 2016

Project 1&2: Souq Waqif & Najda Tunnel
 Responsible for preparation of Builders work, shop drawing for plumbing and HVAC
 Material takeoff and purchase for site activities.
 Responsible for the site installation of MEP works.
 Attending meetings with client, consultant, sub-contractors and suppliers

Mechanical Engineer في Hydro Engineering consultant
  • المملكة العربية السعودية - مكة المكرمة
  • مارس 2006 إلى أغسطس 2015

Project 1: Central utility complex & utility tunnel-The Holy Haram Expansion Makkah
Project 2: Makkah Holy Mosque Hospital (30 storey Building)
Chiller Plant
• Installation of Chiller units (York Titan) Capacity (32 Nos. x 5000 Ton= 1, 60, 000 Ton), Cooling tower 32 Nos. (GEA Polaces), Condenser water pump (ITT Bell & Gossett) AFV, Balancing valve, Four way valve, Cooling tower filtration unit (Veolia), Self-cleaning strainer, Dosing system, Air separator (Vessel), Expansion tanks (Amtrol), Primary water pump (315.5 /s @ 180 kpa), Secondary chilled water pump, Overhead crane(50 Ton), Black steel pipes welded (Dia 1400) for chilled water return & supply.
• Material takeoff for the construction of the mechanical work of the project.
• Checking the shop drawing with Design drawing, if any correction needed as per the site condition, informing the technical department.
• Making Site Construction Report (SCR) to consultant as per site conditions in the drawing.
• Responsible for QC inspection and consultant inspection.
• Co-coordinating with Civil, Electrical departments & Sub-contractors for co-ordination of work.
• Maintain the log for shop drawing, IR, Material submittal for follow up.
• Preparing the weekly Mechanical installation status & civil work status.
Generator plant:
• Installation of diesel generator (16 Nos. 4.4 MV) Make - Caterpillar, Radiator (GEA), Daily fuel tank 5000 liter (16 Nos.) Fuel overflow tank - 5000L (2 Nos.), underground fuel tank each 100, 000 liters (5 Nos.) Fuel transfer pumps (Ewon USA), overhead crane (10 Ton).
• Installation of cooling system, Compressed air starting system, Fuel supply & drain system, Lube oil supply & drain system, Combustion air, Exhaust air & breather unit system pipings.
Water Treatment Plant:
• Installation of hydro disc filter system for polishing of treated sewage effluent water.
• Installation of backwash pump, online analyzer, chlorine analyzer, chlorine dosing system, stabilized bromine dosing system, chemical pumps, turbid meter etc.


Central waste handling plant:
• Installation of blower pumps, waste cyclone, dust cyclone, waste compactor, overhead crane (10 ton), and monorail crane (1.6 Ton), carbon steel pipes.
• Reviewing the drawings, submittals & discussing the technical issues with Mari Matic, Finland.
Utility Tunnel :( From CUC to AL- HARAM) - 1.3km
• Installation of different size of pipes supports & Ventilation jet fans on every 200meters.

Electro-Mechanical Engineer في Parsons International LTD
  • الإمارات العربية المتحدة - أبو ظبي
  • فبراير 2009 إلى أبريل 2011

Project : Corniche -Infrastructure & Associated work
• Inspecting the installation of pumps(Grundfos, ITT lowara), Valves(Econosto), penstock, odour control unit, screen filter, pressure vessel, basket strainer, flexible joint, over head crane, Ac units, flow meters etc in pumping station.
• Supervising the MS pipe galvanizing and VJ coupling installation.
• Checking and Approving GIR, day work, material submittals, shop drawing, As-built drawing, cost estimates and work orders.
• Inspecting the installation of submersible pumps, float valve, float switch, filtration system, level sensor, auto back wash valve etc. in the water features.
• Review the method statement of mechanical works.
• Inspecting the site material storage & ensure it is stored as per the contract recommendations.
• Checking the hydraulic calculations of pumps.
• Inspecting the installation of fire pumps as per the NFPA rule.
• Preparing monthly QA/QC progress report & safety reports and submitting to the client.

Mechanical Engineer في Wade Adams Contracting LLC Dubai, UAE
  • الإمارات العربية المتحدة - دبي
  • يوليو 2007 إلى يناير 2009

Project - 1: Mirdif East Roads & Infrastructure Consultant: CansultMaunsell Client: Dubai Properties
Project - 2: The Palm Jebel Ali - Crescent E Consultant: Hyder consulting Client: Nakheel
Project - 3: Midriff Interchange Consultant: Africon-Al Burg Client: RTA

• Construction, Installation, testing & commissioning of Potable Water, Irrigation Water, Sewerage and Fire Fighting Pumping Station.
• Installation and commissioning of plant equipments, machineries and MEP Works such as HVAC System installation, plumbing of the pumping station facilities.
• Site Management and supervision of the Construction Site.
• Responsible for the consultant & client inspection and acceptance of the construction activities.
• Materials take off for the construction of Irrigation, Fire Fighting, Sewage Pumping Stations, Networks & related mechanical works of the projects.
• Sourcing & pricing of materials takeoff from the contract drawings within the limit of BOQ. Major Equipments are Vertical Turbine Pumps, Submersible Pumps, Jockey Pumps, Split Casing Pumps, Fire Fighting Pumps, Mechanical Valves, Hydraulic/Control valves, Filters, Instrumentations, Pressure vessel, Strainers, dosing system, HVAC Equipments etc.
• Price, delivery and payment terms & condition negotiations with the suppliers / manufacturers.
• Techno-economical evaluation of the materials to be procured.
• Preparation & follow up the materials delivery schedule.
• Responsible for the preparation of shop drawing, as-built drawings, material submittals, getting approvals from the consultants etc.
• Reporting to Project Manager & Company Manager.

Mechanical Maintenance Engineer في The Kerala Ceramics LTD Kerala, India
  • الهند - كيرالا
  • يونيو 2006 إلى يونيو 2007

• Site supervision of civil work in biogas plant and submitting report
• Maintenance of different types of pumps and motors.
• Preparing mechanical drawings for fabrication work and pipeline work.
• Operation and Maintenance of hydraulic Press in the plant.
• Site supervision of mining area and submitting report.
• Estimation, Costing and Tendering of work.
• Operation and maintenance of gears and agitators in the plant.

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Visvesaraya technological University
  • أبريل 2006

Specialties & Skills

Chillers
Waste Treatment
Pump Stations
Water Features
Pump station
AUTOCAD
Infrastructure Network
CONTROL VALVES
Waste water treatment
Chiller plant
COOLING
COST ESTIMATES
CHILLED WATER

اللغات

الهندية
متمرّس
الملايام
اللغة الأم
العربية
متوسط
الانجليزية
متمرّس

العضويات

Abu Dhabi Municipality (UAE) approved
  • Electro-Mechanical Engineer
  • March 2009

التدريب و الشهادات

UPDA Grade A (الشهادة)
تاريخ الدورة:
January 2020
RT, UT, PT&MPT (American Society for Non-destructive Testing-Level II). (الشهادة)